Limerick City and County Council Tender for Multidisciplinary Consultancy Services for Corbally Road Safe Routes to School Scheme Phases 5-7
Awarded
The competition has ended and a winner has been selected.
- Procedure
- OpenSingle stage
- Agreement
- Buying services
- Estimated value
- €377.7Kover 1 year
Brief
Limerick City and County Council has awarded O’Connor Sutton Cronin a 12-month contract worth €285,000 for multidisciplinary consultancy services for phases 5–7 of the Corbally Road Safe Routes to School Scheme in Limerick, Ireland. The scheme includes improving walking and cycling infrastructure, pedestrian crossings and junction safety, alongside landscaping, with design work required to comply with relevant Irish cycling, road-design and safe-routes-to-school guidance and undergo National Transport Authority review. Two bids were received.
Rådgivende ingeniørtjenester for bygg og anlegg
Result
- O'Connor Sutton Cronin_19870Winner
- 2Number of tenders received
- €285,000Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Limerick City and County Council_103432
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
This Scheme aims to deliver improved safety, comfort and security for cyclists, pedestrians and the mobility impaired and to encourage an uptake in cycling as a viable and safe commuter / student travel mode. This objective is to be achieved through the delivery of infrastructure, which is designed in compliance with the Cycle Design Manual (CDM), the National Cycle Manual (NCM), the Design Manual for Urban Roads and Streets (DMURS), Safe Routes to School Design Guide, Transport Infrastructure Ireland (TII) Publications and the Traffic Management Guidelines (TMG’s) and through a National Transport Authority (NTA) review process. Phases 1-4 has been completed. NTA funding approval is in place to allow the scheme to progress. The proposed design will include the following: • A redeveloped path with an average width of 3.5m along the northern side of Corbally Road from Scoil Ide to the entrance to St Munchin’s College; • Resurfacing of the existing footpath along the southern side of Corbally Road from Lanahrone Avenue junction to Shannon Drive junction; • 3 no. new raised pedestrian crossings along Corbally Road; • New Junction tightening measures at Roseville Gardens junction, Lanahrone Avenue junction and St. Munchin’s College junction to reduce vehicle speeds and increase safety for vulnerable road users; • Realignment of entrance and widening of gates at St. Munchin’s College to facilitate 2-way traffic; • New low-level planting, soft landscaping, hedging and trees.
Contact
thomas.flyod@limerick.ie- ResultType
- 71311000Main codeCivil engineering consultancy services
- 71300000Engineering services71310000Consultative engineering and construction services71311200Transport systems consultancy services71311300Infrastructure works consultancy services71320000Engineering design services71322000Engineering design services for the construction of civil engineering works71322500Engineering-design services for traffic installations71330000Miscellaneous engineering services