LOT 1 : Construction of water production and Liwonde water supply system
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Jan 11,Expired
- Award
Brief
Southern Region Water Board in Malawi has entered into an agreement with Mohammed Abdulmohsin Al-Kharaf & Sons for General Trading, General Contracting and Industrial Structures W.L.L for the construction of a water production and Liwonde water supply system. The project, valued at an estimated 28.6 million EUR, involves the renovation of an existing river intake, construction of a new water treatment plant with a capacity of 32,500 m3/d, new pumping stations, water storage reservoirs, and a 20.07 km transmission main and 41.5 km distribution system. The contract duration is 18 months.
Oppføring av bygninger
Result
- Mohammed Abdulmohsin Al-Kharaf & Sons for General Trading, General Contracting and Industrial Structures W.L.LWinner
- 0Number of tenders received
- Not statedContract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Southern Region Water Board
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
The selected bid will be the responsive with the lowest Evaluated price.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The Southern Region Water Board has received a loan through the Government of Malawi from the European Investment Bank towards the funding of the Water Supply Improvement for Liwonde and Balaka Towns programme and intends to apply part of the proceeds for the Procurement of: Water Production System - Intake: Renovation of the existing river intake at the Shire River, construction of additional pump sump next with pump housing building, installation of 3 pumps - Transmission main: 580m of DN700 DI from the new intake to the WTP - Water treatment plant: New 32,500 m3/d (the ultimate capacity of 43,334 m3/d at 2050) consisting of inlet works, flocculation and sedimentation tanks, rapid gravity filters, 3,500 m3 contact tank and one 300 m3 Elevated Steel Backwash Tank. Auxiliary facilities: chemical and chlorination buildings, chemicals storage building, 3 sludge drying beds, one backwash lagoon, administration and laboratory buildings together with site works. - Pump house: Three (3) Treated water pumping station ranging from 56 m3/h to 300 m3/h and a backwash filter pumping station. - E & M, instrumentation and control works. Liwonde Town Water Supply System - Treated water pumping station: 1 unit 60 m3/h at 86 m - Water storage reservoir: 3 units – 2 x 5 ML ; 1 x 0,5 ML and 1 x 1 ML - Transmission main: 20,07 km DI and PVC-U DN 200 to 500 mm - Distribution system : 41,5 km 10 water kiosks - E & M, instrumentation and control works
Contact
Jaqueline DIASsrwb.ipdc@srwb.mw- ResultType
- 45200000Main codeWorks for complete or part construction and civil engineering work