All tenders: Denmark/Metroselskabet I/S/M5 Transportation Systems Consultancy

M5 Transportation Systems Consultancy

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Jul 2, 2025Expired
Award
Key Personnel and Organisation, weight 30 and 1 more
Procedure
With negotiationTwo stages
Agreement
Buying services
Estimated value
DKK 101.1Mover 10 years

Brief

Metroselskabet I/S har inngått en avtale om teknisk rådgivning for transportsystemet til den nye M5-linjen i København med en estimert total verdi på 101 millioner danske kroner. Avtalen dekker tjenester innen jernbaneinfrastruktur, inkludert automatisk togkontroll, plattformdører, passasjersikkerhet og informasjonssystemer, SCADA, kontrollsenter, transmisjonssystem, radiokommunikasjon, innbruddsdeteksjon og adgangskontrollsystemer, samt drift og vedlikeholdsforsyninger. Konsulenttjenestene skal leveres fra Københavns Hovedbanegård til Refshaleøen over en periode på 10 år, med fase 4 som en opsjon. Rambøll Danmark har tidligere utført arbeid som danner grunnlaget for denne avtalen, og det var tre deltakere i konkurransen.

Consulting Engineering Services for Construction and Civil Engineering

Result

TED
  • Ramboll Danmark A/S (Asociat)
    Winner
  • Systra Danmark A/S
    Winner
  • Number of tenders received
    3
  • Contract value
    DKK 101,112,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Metroselskabet I/S

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Method

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Key Personnel and Organisation

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Hourly Rates

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Metroselskabet is tendering for technical consultancy on the Transportation System for the new M5 line in Copenhagen. The M5 alignment shall be underground from CMC via Lergravsparken to the end shaft at Vester Søgade, and from Lergravsparken to v/Prags Boulevards Øst. The alignment shall transition from underground to elevated via ramp just north of v/Prags Boulevards Øst and be elevated from the ramp to v/Refshaleøen and on Lynetteholm. From Lynetteholm the alignment shall transition to underground and extend to a station at Østerport with an end shaft located in Østre Anlæg. Additionally, the branch to the CMC is underground with a bifurcation located near Jenagade or in connection with the station Lergravsparken. The alignment has a ramp to surface at Prøvestenen. The M5­project has been divided into the following phases: Phase 1: Programme Study (in Danish “Udredningsfasen”), Phase 2.1: Concept Design and EIA, Phase 2.2 Reference Design, Phase 3: Tendering, Phase 4: Construction, Phase 5: Operation. Furthermore, the project consists of the following consultancy contracts: ­ 1) M5 ØHA Civil Works, Environmental Impact Assessment (EIA) and utilities for phase 2.1­4 (the contract is awarded to a joint venture consisting of COWI A/S and Arup Denmark) 2) M5 ØHA Transportation Systems consultancy for phase 2.1 (The contract was awarded to Rambøll Denmark and the work performed by Rambøll is the basis for this tender) 3)M5 ØHA_Areas and Rights (the contract was awarded to COWI A/S) 4) M5 ØHA Assessor for concept design and reference design (the contract was awarded to Certifer) 5) Formal Method Consultancy (in tender phase) 6) M5 ØHA TS-­consultancy for phase 2.2­-phase 4 (with phase 4 being an option, please refer to ABR18 Contract, doc. id.M5-MS-GEN-GOH-CON-AGR-000001). Metroselskabet is tendering for a Transportation System (TS) consultant to assist Metroselskabet I/S with consultancy within TS. The TS-­consultancy contract entails services such as: ­ Railway Infrastructure such as: ­ Automatic Train Control – Platform Screen Doors – Passenger Security and Information System – Supervisory Control and Data Acquisition (SCADA), including local SCADA ­Control Centre ­Transmission System ­Radio communication System – Intrusion Detection and Access Control Systems ­Operation. Maintenance supplies ­Track ­Power. The TS Consultancy contract for phase 2.2­4 also includes reference design for the Control and Maintenance Centre (CMC). Please refer to Project and Work Description M5-MS-GEN-Gen-CON-REP-000003 for a detailed description of the services included in the TS­-consultancy contract. This contract only covers the stretch from Københavns Hovedbanegaarden to Refshaleøen. As part of the M5 project, Metroselskabet will at a later stage tender out construction contracts for both civil works and the transportation systems. To secure the independency of the consultants involved in the project, the tenderer awarded the TS-consultancy contract (this tender) cannot also act as an consultant for the Civil Works Contractors and/or the Transportation Systems Contractors. This is primarily due to the scope of work / services for the TS-consultant which includes an obligation to deliver consultancy services related to the preparation of the tender for the Civil Works Contractor and the Transportation Systems Contractor, including assisting Metroselskabet with the evaluation of the tenders received in those tender procedures. To secure the principles of equal treatment and transparency in both this tender procedure and the upcoming procedures, Metroselskabet has therefore included in the consultancy agreement a contractual obligation to refrain from working for the Civil Works Contractor and the Transportation Systems Contractor.

  • Contact

    Vibeke Jessenvij@m.dk
  • Type
    Result · Prequalification
  • Location
    Byen København
  • Main code
    Engineering services
    71300000
  • 71310000Consultative engineering and construction services71311200Transport systems consultancy services

Similar active competitions

  • Trafikstyrelsen

    Consulting Engineering Services for Construction and Civil Engineering

    Rammeaftale om konsulentrådgivningsydelser med mulighed for indlån og konsulenter i vikariater inden for jernbanesikkerhed og interoperabilitet på jernbaneinfrastrukturområdet

    Trafikstyrelsen har brug for en 4-årig rammeaftale med en maksimal samlet værdi på 12 mio. DKK til konsulentrådgivning, indlån af konsulenter og vikariater inden for jernbanesikkerhed og interoperabilitet samt bistand til myndighedsbehandling i København. Opgaverne omfatter jernbaneinfrastruktur, tekniske specifikationer for interoperabilitet (TSI) og risikovurdering, risikostyring og signifikansvurdering (CSM-RA); tilbudsgiver skal have udført mindst én tilsvarende opgave inden for de seneste 3 år, som dækker jernbaneinfrastruktur samt mindst ét af de to øvrige fagområder. Tildeling sker på grundlag af de tilbudte konsulenters kompetencer og kvalifikationer (60 %) samt pris (40 %).

    Framework agreement
    Dec 21, 2026(25 days)
    DKK 12,000,000
  • Københavns Kommune

    Consulting Engineering Services for Construction and Civil Engineering

    Offentligt udbud - Rammeaftale: Evalueringer af cykelprojekter

    Københavns Kommune, Klima-, Miljø- og Teknikforvaltning har brug for evalueringer af cykelprojekter under en rammeaftale på 2 år med en maksimal samlet værdi på 40 mio. kr.; aftalen kan anvendes af forvaltningens enhed Mobilitet, Klimatilpasning og Byvedligehold, og opgavemængden afhænger af fremtidige budgetaftaler. Opgaverne omfatter blandt andet cyklisttællinger med kamera, sensorer eller radar samt rekruttering af cyklister i felten til online spørgeskemaundersøgelser. Tilbyder skal dokumentere mindst én relevant reference inden for hver af disse opgavetyper fra de seneste 3 år; højst 2 referencer kan indsendes. Den valgte tællemetode og teknologi skal have mindst 80 % præcision for fodgængere, cyklister og motorkøretøjer, dokumenteret med test eller kvalitetssikring. Tildelingen vægter opgaveløsning, kvalitet og leveringssikkerhed 45 %, projektorganisering og bemanding 35 % samt pris 20 %.

    Framework agreement
    Jan 12, 2027(47 days)
    DKK 40,000,000
  • Metroselskabet I/S

    Market dialogue - Copenhagen - New Metroline M5 Civil Works

    Metroselskabet I/S is planning the procurement of civil works for the Copenhagen New Metroline M5 and encourages potential tenderers to register for a market dialogue to provide input. The market dialogue will run until the end of August, and information will be shared via the Byggeprojekt platform.

    Planning