Search

  • Search


    M5 Transportation Systems Market Dialogue

    METROSELSKABET I/S

    M5 Transportation Systems Market Dialogue

    1. Planning notice published

      Oct 2, 6:12 AMOctober 2, 2024 6:12 AM
    2. Questions deadline

      Jan 27, 11:00 AMJanuary 27, 2026 11:00 AM
    3. Tender submission deadline

      Feb 3, 11:00 AMFebruary 3, 2026 11:00 AM
    4. Contract start date

      Mar 2, 11:00 PMMarch 2, 2026 11:00 PM
    5. Tender validity period

      May 3, 10:00 AMMay 3, 2026 10:00 AM

    Brief

    Denmark: Tenders/METROSELSKABET I/S/M5 Transportation Systems Market Dialogue

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Jernbane- og infrastrukturbygging

    M5 is a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholm, Refshaleøen and Kløverparken, with the existing city and transport network. M5 will include a new Control and Maintenance Centre (CMC). The M5 alignment shall be underground from CMC via Lergravsparken to the end shaft at Vester Søgade, and from Lergravsparken to v/Prags Boulevards Øst. The alignment shall transition from underground to elevated via ramp just north of v/Prags Boulevards Øst and be elevated from the ramp to v/Refshaleøen. Metroselskabet expects to build the stretch from Copenhagen Central Station to Prags Boulevard to open in 2035. The part from v/Ref to Kk is planned to open in 2045 and is not part of the upcoming tender for a contractor. However, the Transportation systems will be designed so that they can cover – or be expanded to cover – from København H to Østerport and possible also the full ring and other scenarios that are safeguarded for. Additionally, the branch to the CMC is underground with a Bifurcation located near Jenagade or in connection to the station Lergravsparken, the alignment has a ramp to surface on Prøvestenen. The alignment is currently being developed by a civil works consultant (a joint venture consisting of COWI and ARUP) to make it possible to extend the line/close the ring from Østerport (Kk) and København H (Kh). Also, a joint venture consisting of Rambøll and Systra Denmark has joined the project as Transportation Systems consultants. With the new M5 line, Metroselskabet will be focusing on improving other aspects of future metro lines. Using the UNSDGs as a basis, four main project objectives have been defined with the objective to minimize negative impact and maximising the positive impact of the project. • Reduce the use of resources and climate impact Metroselskabet has an ambition to reduce the carbon footprint from future metro lines with 50% compared to the existing metro. • Improve passenger experience and operational robustness The Copenhagen metro run with a low amount of carbon pr. Passenger kilometer, mainly because it is electrically powered, and many people prefer to use the metro when using public transportation. Operational robustness and reliable service is therefore an essential aspect of sustainability. • Improve safety and working environment Everyone should be able to work without accidents or injuries, both in construction and operations of the new metro line. • A contribution to the city A new metro line should physically meet and connect with the city in a way that creates urban space quality and leave space for increased urban biodiversity. In order, to ensure that the Transportation Systems construction contract is attractive to the market, Metroselskabet will be conducting a market dialogue prior to releasing the tender for the transportation systems construction contract. Thus, Metroselskabet invites potential interested parties to sign up for market dialogue meetings. The meetings will be individual meetings, and the meeting can be either in person at Metrovej 5, Copenhagen or via TEAMS or a hybrid depending on the preferences of potential interested party. The dialogue meetings will take place during November 11th to November 22nd 2024. Please contact: vij@m.dk if you wish to participate in a dialogue meeting.

    About the bid

      M5 is a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholm, Refshaleøen and Kløverparken, with the existing city and transport network. M5 will include a new Control and Maintenance Centre (CMC). The M5 alignment shall be underground from CMC via Lergravsparken to the end shaft at Vester Søgade, and from Lergravsparken to v/Prags Boulevards Øst. The alignment shall transition from underground to elevated via ramp just north of v/Prags Boulevards Øst and be elevated from the ramp to v/Refshaleøen. Metroselskabet expects to build the stretch from Copenhagen Central Station to Prags Boulevard to open in 2035. The part from v/Ref to Kk is planned to open in 2045 and is not part of the upcoming tender for a contractor. However, the Transportation systems will be designed so that they can cover – or be expanded to cover – from København H to Østerport and possible also the full ring and other scenarios that are safeguarded for. Additionally, the branch to the CMC is underground with a Bifurcation located near Jenagade or in connection to the station Lergravsparken, the alignment has a ramp to surface on Prøvestenen. The alignment is currently being developed by a civil works consultant (a joint venture consisting of COWI and ARUP) to make it possible to extend the line/close the ring from Østerport (Kk) and København H (Kh). Also, a joint venture consisting of Rambøll and Systra Denmark has joined the project as Transportation Systems consultants. With the new M5 line, Metroselskabet will be focusing on improving other aspects of future metro lines. Using the UNSDGs as a basis, four main project objectives have been defined with the objective to minimize negative impact and maximising the positive impact of the project. • Reduce the use of resources and climate impact Metroselskabet has an ambition to reduce the carbon footprint from future metro lines with 50% compared to the existing metro. • Improve passenger experience and operational robustness The Copenhagen metro run with a low amount of carbon pr. Passenger kilometer, mainly because it is electrically powered, and many people prefer to use the metro when using public transportation. Operational robustness and reliable service is therefore an essential aspect of sustainability. • Improve safety and working environment Everyone should be able to work without accidents or injuries, both in construction and operations of the new metro line. • A contribution to the city A new metro line should physically meet and connect with the city in a way that creates urban space quality and leave space for increased urban biodiversity. In order, to ensure that the Transportation Systems construction contract is attractive to the market, Metroselskabet will be conducting a market dialogue prior to releasing the tender for the transportation systems construction contract. Thus, Metroselskabet invites potential interested parties to sign up for market dialogue meetings. The meetings will be individual meetings, and the meeting can be either in person at Metrovej 5, Copenhagen or via TEAMS or a hybrid depending on the preferences of potential interested party. The dialogue meetings will take place during November 11th to November 22nd 2024. Please contact: vij@m.dk if you wish to participate in a dialogue meeting.

      Contact name
      Vibeke Jessen
      Contact phone
      72424802
      Contact email
      vij@m.dk
      Address
      Metrovej 5, 2300 København S

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    METROSELSKABET I/S
    Title
    M5 Transportation Systems Market Dialogue
    Type
    Planning
    Main code
    45234100Railway construction works
    Supplemental codes
    31174000Power supply transformers42961200Scada or equivalent system45234000Construction work for railways and cable transport systems45234111City railway construction work45234116Track construction works45234129Urban railway track construction works
    Location
    Byen København

    Active similar competitions

    • METROSELSKABET I/S

      Bygg og anlegg - Bruer og tunneler

      M5 – New Metro Line – Invitation to Information Meeting on Prequalification and Tender for Transportation Systems

      Metroselskabet I/S planlægger anskaffelsen af transportsystemer til den nye metrolinje M5 i København. Interesserede leverandører inviteres til et digitalt informationsmøde for at få præsenteret udbudsprocessen, herunder prækvalifikations- og udbudsfasen samt tidsplanen, og for at få et overblik over udbudsdokumentationen. Mødet afholdes via Microsoft Teams.

      PlanningJun 11, 2026
    • METROSELSKABET I/S

      Market dialogue - Copenhagen - New Metroline M5 Civil Works

      Metroselskabet I/S is planning the procurement of civil works for the Copenhagen New Metroline M5 and encourages potential tenderers to register for a market dialogue to provide input. The market dialogue will run until the end of August, and information will be shared via the Byggeprojekt platform.

      PlanningAug 13, 2026
    • METROSELSKABET I/S

      Bygg og anlegg - Bruer og tunneler

      Copenhagen - New Metroline M5 Civil Works South – Invitation to Information Meeting

      Metroselskabet I/S planlægger anskaffelsen af anlægsarbejder til den nye metrolinje M5 Syd i København. Interesserede leverandører inviteres til et digitalt informationsmøde via Microsoft Teams den 23. juni 2026 kl. 10:00-11:00 CET, hvor Metroselskabet vil præsentere udbudsprocessen, projektet og udbudsdokumentationen. Der er ingen krav om registrering for at deltage i mødet.

      PlanningJun 11, 2026
    • Vejdirektoratet

      Anleggs- og infrastrukturbygging

      Markedsdialog vedr. udbud af kommende beredskabsaftale

      Vejdirektoratet planlægger sammen med Rigspolitiet et fælles udbud af beredskabs- og autotransportydelser, med en estimeret maksimal kontraktværdi på 300 millioner DKK. Formålet er at indsamle input fra markedet for at kvalificere udbuddet og sikre de bedst mulige rammer for udførelsen af disse tjenester. Interesserede leverandører inviteres til at deltage i individuelle markedsdialogmøder, enten fysisk hos Vejdirektoratet eller via Teams, ved at besvare et spørgeskema og sende en interessetilkendegivelse.

      PlanningJun 18, 2026
      Oct 18, 2026(8 days)
      DKK 300,000,000
    • METROSELSKABET I/S

      Jernbane- og infrastrukturbygging

      Copenhagen - New Metroline, M5 Civil Works South

      Metroselskabet I/S needs civil works for the M5 Metroline South package in Copenhagen, Denmark, over a period of 9 years. This design & build contract, under ABT18 terms, involves the construction of approximately 6.5 km of twin bored TBM tunnels, 5 underground stations, 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approximately 2.0 km of viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, and short embankment sections. The M5 line is a fully automated driverless metro system designed to enhance passenger service and extend connectivity to emerging urban development areas. The contract will be awarded based on Price (50%) and Quality (50%), with Quality sub-criteria including Technical solution and planning (16%), Management and collaboration (16%), Organization and key personnel (10%), and Carbon (8%). To qualify, applicants must have completed one project demonstrating experience with design, construction, and project management of an underground metro project in the EEA and/or the UK, and one project demonstrating experience with design, construction, and project management of an above-ground metro project in the EEA and/or the UK, both within the last 15 years. Additionally, applicants must have an equity of no less than EUR 100,000,000.00 and a total annual turnover of at least EUR 1,700,000,000.00 in each of the last three completed financial years.

      Competition with qualificationSep 10, 2026
      Oct 13, 2026(3 days)