Germany: Tenders/BEW Berliner Energie und Wärme GmbH/Manufacturing, Delivery, Installation and Commissioning Assistance of 110kV / 22kV & 10,5kV Power Transformers (Projects SGM & REB)

Manufacturing, Delivery, Installation and Commissioning Assistance of 110kV / 22kV & 10,5kV Power Transformers (Projects SGM & REB)

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Sep 27, 2024Expired
Award
Leistungsbewertung gemäß Kriterienkatalog, weight 20
Procedure
With negotiationTwo stages
Agreement
Buying goods
Estimated value
€1until May 2028

Brief

Lot 1: Project description for “Project Sustainable Growth Mitte (SGM)” Project objective is the installation of three electrical driven heat-only boiler at BEW’s site in Berlin Mitte to diversify sources of heat within Berlin’s district heating grid and to improve the green heat share till end of 2028. For this purpose, 3 parallel electrical driven boiler with a heat output of 40 MWth each shall be built. This announcement for Lot 1 considers the supply of two identical power transformers, each 125 MVA. • 2 identical power transformers with a performance of 125 MVA each, 110 kV / 22 kV with an On-load tap changer • delivery to HKW Mitte site ready to put on sliding system (rails) • switching group YNd5 • provide Lot (1) with Lot (3) Schedule (draft): Award of contract: March, 2025 Delivery to Berlin: Q1-2028 Lot 2: Reuter West - REB ( EBTR) Project description for “Reuter Electrical Backbone (REB)” Project objective is the construction of the Electrical Backbone for Reuter West site. The sub-project "REB" is the new electrical infrastructure to provide the power supply to the power systems/projects at this site. Therefore, this announcement concerns the following scope for Lot 2: • 2 identical power transformers with a performance of 80 MVA each, 110 kV / 10,5 / 10,5 kV with an On-load tap changer • manufacturing, installation, supervision, commissioning and the “As-built” documentation • delivery to HKW Reuter West site ready to put on sliding system (rails) • switching group Dyn5yn5 Schedule (draft): Award of contract: February, 2025 Delivery to Berlin: Q4-2027 Commissioning: Q2/2028

Elektrisk infrastruktur og veibelysning

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at BEW Berliner Energie und Wärme GmbH

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Due to the limited number of characters in the TED, all criteria can be viewed at the following link in the "deutsche eVergabe" portal. All documents must be submitted via this. Bidder communication also takes place via the portal.

    Documentation Requirement

    https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/subproject/833615f9-8502-42e7-8309-57e45f07d345/suitabilitycriteria

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Due to the limited number of characters in the TED, all criteria can be viewed at the following link in the "deutsche eVergabe" portal. All documents must be submitted via this. Bidder communication also takes place via the portal.

    Documentation Requirement

    https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/subproject/833615f9-8502-42e7-8309-57e45f07d345/suitabilitycriteria

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Due to the limited number of characters in the TED, all criteria can be viewed at the following link in the "deutsche eVergabe" portal. All documents must be submitted via this. Bidder communication also takes place via the portal.

    Documentation Requirement

    https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/subproject/833615f9-8502-42e7-8309-57e45f07d345/suitabilitycriteria

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    Preis

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Die Leistungskriterien werden in der Ausschreibungsphase definiert.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Lot 1: Project description for “Project Sustainable Growth Mitte (SGM)” Project objective is the installation of three electrical driven heat-only boiler at BEW’s site in Berlin Mitte to diversify sources of heat within Berlin’s district heating grid and to improve the green heat share till end of 2028. For this purpose, 3 parallel electrical driven boiler with a heat output of 40 MWth each shall be built. This announcement for Lot 1 considers the supply of two identical power transformers, each 125 MVA. • 2 identical power transformers with a performance of 125 MVA each, 110 kV / 22 kV with an On-load tap changer • delivery to HKW Mitte site ready to put on sliding system (rails) • switching group YNd5 • provide Lot (1) with Lot (3) Schedule (draft): Award of contract: March, 2025 Delivery to Berlin: Q1-2028 Lot 2: Reuter West - REB ( EBTR) Project description for “Reuter Electrical Backbone (REB)” Project objective is the construction of the Electrical Backbone for Reuter West site. The sub-project "REB" is the new electrical infrastructure to provide the power supply to the power systems/projects at this site. Therefore, this announcement concerns the following scope for Lot 2: • 2 identical power transformers with a performance of 80 MVA each, 110 kV / 10,5 / 10,5 kV with an On-load tap changer • manufacturing, installation, supervision, commissioning and the “As-built” documentation • delivery to HKW Reuter West site ready to put on sliding system (rails) • switching group Dyn5yn5 Schedule (draft): Award of contract: February, 2025 Delivery to Berlin: Q4-2027 Commissioning: Q2/2028

  • Contact

    willy.schittek@vattenfall.de
  • Type
    Competition · Prequalification
  • Location
    Berlin
  • Main code
    Transformers
    31170000
  • 51111300Installation services of transformers

Similar active competitions

  • Stromnetz Berlin GmbH

    Elektrisk utstyr og belysning

    Fertigung, Lieferung, Aufstellung und Inbetriebnahme von Drehstrom-Leistungstransformatoren 31,5 und 40 MVA sowie 40 MVar Kompensationsdrosselspulen

    Die Stromnetz Berlin GmbH benötigt die Herstellung, Lieferung, Aufstellung und Inbetriebnahme von Drehstrom-Leistungstransformatoren (31,5 und 40 MVA) sowie 40 MVar Kompensationsdrosselspulen in Berlin. Die technischen Mindestbedingungen sind in den Technischen Bedingungen TB3561, 3562 und 3566 sowie den dazugehörigen Anlagen (TB3561_A01, TB3562_A01, TB3566_A01) detailliert beschrieben und online abrufbar.

    Qualification system
    Jul 9, 2029(100+ days)
  • Netze BW GmbH

    Leistungstransformatoren 15-100 MVA

    The present qualification system serves as the prequalification for the supply of three-phase power transformers ranging from 15 MVA to 100 MVA. Companies with the capability to deliver power transformers in the above mentioned power range are invited to submit their requests for participation. This qualification system contains critical electrical data and implementation guidelines to ensure performance, safety and compatibility with our existing infrastructure.

    Qualification system
    Nov 7, 2027(100+ days)
  • TenneT TSO GmbH

    Kraftforsyning og reservestrøm

    UW Ahlten - Anpasstransformatoren 30/20 KV, 10 MVA umstellbar auf 30/10 KV, 10 MVA

    TenneT TSO GmbH benötigt für das Umspannwerk Ahlten in Deutschland die Herstellung, Lieferung und betriebsbereite Montage von zwei Anpassungstransformatoren mit jeweils 10 MVA, ausgelegt für 30/20 kV und umstellbar auf 30/10 kV. Die Transformatoren dienen der künftigen Versorgung der bestehenden 20-kV-Schaltanlage aus den neuen Transformatoren des Umspannwerks; der maximale Gesamtauftragswert beträgt 1 Million Euro.

    Competition with qualification
    Nov 30, 2026(8 days)
    €1,000,000