Manufacturing, Delivery, Installation and Commissioning Assistance of 110kV / 22kV & 10,5kV Power Transformers (Projects SGM & REB)
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Sep 27, 2024Expired
- Award
- Leistungsbewertung gemäß Kriterienkatalog, weight 20
Brief
Lot 1: Project description for “Project Sustainable Growth Mitte (SGM)” Project objective is the installation of three electrical driven heat-only boiler at BEW’s site in Berlin Mitte to diversify sources of heat within Berlin’s district heating grid and to improve the green heat share till end of 2028. For this purpose, 3 parallel electrical driven boiler with a heat output of 40 MWth each shall be built. This announcement for Lot 1 considers the supply of two identical power transformers, each 125 MVA. • 2 identical power transformers with a performance of 125 MVA each, 110 kV / 22 kV with an On-load tap changer • delivery to HKW Mitte site ready to put on sliding system (rails) • switching group YNd5 • provide Lot (1) with Lot (3) Schedule (draft): Award of contract: March, 2025 Delivery to Berlin: Q1-2028 Lot 2: Reuter West - REB ( EBTR) Project description for “Reuter Electrical Backbone (REB)” Project objective is the construction of the Electrical Backbone for Reuter West site. The sub-project "REB" is the new electrical infrastructure to provide the power supply to the power systems/projects at this site. Therefore, this announcement concerns the following scope for Lot 2: • 2 identical power transformers with a performance of 80 MVA each, 110 kV / 10,5 / 10,5 kV with an On-load tap changer • manufacturing, installation, supervision, commissioning and the “As-built” documentation • delivery to HKW Reuter West site ready to put on sliding system (rails) • switching group Dyn5yn5 Schedule (draft): Award of contract: February, 2025 Delivery to Berlin: Q4-2027 Commissioning: Q2/2028
Elektrisk infrastruktur og veibelysning
Previous winners
Who are you up against?
The suppliers who have won similar contracts at BEW Berliner Energie und Wärme GmbH
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Due to the limited number of characters in the TED, all criteria can be viewed at the following link in the "deutsche eVergabe" portal. All documents must be submitted via this. Bidder communication also takes place via the portal.
Documentation Requirement
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/subproject/833615f9-8502-42e7-8309-57e45f07d345/suitabilitycriteria
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Due to the limited number of characters in the TED, all criteria can be viewed at the following link in the "deutsche eVergabe" portal. All documents must be submitted via this. Bidder communication also takes place via the portal.
Documentation Requirement
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/subproject/833615f9-8502-42e7-8309-57e45f07d345/suitabilitycriteria
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Due to the limited number of characters in the TED, all criteria can be viewed at the following link in the "deutsche eVergabe" portal. All documents must be submitted via this. Bidder communication also takes place via the portal.
Documentation Requirement
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/external/subproject/833615f9-8502-42e7-8309-57e45f07d345/suitabilitycriteria
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
Preis
Source
No source found in the documents. Check the weight against the tender documents.
Description
Die Leistungskriterien werden in der Ausschreibungsphase definiert.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Lot 1: Project description for “Project Sustainable Growth Mitte (SGM)” Project objective is the installation of three electrical driven heat-only boiler at BEW’s site in Berlin Mitte to diversify sources of heat within Berlin’s district heating grid and to improve the green heat share till end of 2028. For this purpose, 3 parallel electrical driven boiler with a heat output of 40 MWth each shall be built. This announcement for Lot 1 considers the supply of two identical power transformers, each 125 MVA. • 2 identical power transformers with a performance of 125 MVA each, 110 kV / 22 kV with an On-load tap changer • delivery to HKW Mitte site ready to put on sliding system (rails) • switching group YNd5 • provide Lot (1) with Lot (3) Schedule (draft): Award of contract: March, 2025 Delivery to Berlin: Q1-2028 Lot 2: Reuter West - REB ( EBTR) Project description for “Reuter Electrical Backbone (REB)” Project objective is the construction of the Electrical Backbone for Reuter West site. The sub-project "REB" is the new electrical infrastructure to provide the power supply to the power systems/projects at this site. Therefore, this announcement concerns the following scope for Lot 2: • 2 identical power transformers with a performance of 80 MVA each, 110 kV / 10,5 / 10,5 kV with an On-load tap changer • manufacturing, installation, supervision, commissioning and the “As-built” documentation • delivery to HKW Reuter West site ready to put on sliding system (rails) • switching group Dyn5yn5 Schedule (draft): Award of contract: February, 2025 Delivery to Berlin: Q4-2027 Commissioning: Q2/2028
Contact
willy.schittek@vattenfall.de- Competition · PrequalificationType
- BerlinLocation
- 31170000Main codeTransformers
- 51111300Installation services of transformers