€4Mover 1 year

Brief

Údarás Na Gaeltachta_289 has entered into an agreement with Tiernan Engineering Ltd. for the upgrade and refurbishment of two existing buildings at the Carna Research Station, the Marine Innovation Centre Building and the adjacent Administration Building, along with upgrade works to the seawater abstraction and treatment systems and yard area. These facilities, located in the West of Ireland, will form part of Nua Mara, Ireland's Marine Innovation and Development Centre. The contract has a duration of 12 months and a final value of 4,297,193 EUR. The award was based on cost. Three bids were received.

Pumpestasjoner og pumpesystemer

Result

TED
  • Tiernan Engineering Ltd.
    Winner
  • Number of tenders received
    3
  • Contract value
    €4,297,193

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Údarás Na Gaeltachta_289

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    50

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The works involve the upgrade and refurbishment of two existing buildings at the Carna Research Station — the Marine Innovation Centre Building and the adjacent Administration Building — along with upgrade works to the seawater abstraction and treatment systems and yard area. Once complete, these facilities will form part of Nua Mara, Ireland's Marine Innovation and Development Centre, providing early-stage R and D space, pilot areas and concept-testing facilities for marine sector enterprises.

  • Contact

    ruairi@udaras.ie
  • Type
    Result
  • Location
    West
  • Main code
    Pumping station construction work
    45232152
  • 31100000Electric motors, generators and transformers31120000Generators39715000Water heaters and heating for buildings; plumbing equipment44111000Building materials44115200Plumbing and heating materials44115210Plumbing materials45210000Building construction work45213250Construction work for industrial buildings45233253Surface work for footpaths45233340Foundation work for footpaths45252124Dredging and pumping works45332000Plumbing and drain-laying work45332200Water plumbing work51111000Installation services of electric motors, generators and transformers71321300Plumbing consultancy services

Similar active competitions

  • Tooreen Aghamore GWS

    Rørlegger- og sanitærarbeid

    Tooreen Aghamore Group Water Supply Scheme - Water Meter Upgrade and Network Improvement Works Phase 2

    Tooreen Aghamore GWS needs water network improvement works in Ireland’s Western Region over 6 months, with a maximum contract value of €500,000. The works comprise replacing and installing water distribution pipelines, consumer water meters and bulk flow meters, including data loggers. The contract will be awarded to the most economically advantageous tender based on quality and price.

    Competition
    Dec 11, 2026(18 days)
    €500,000
  • Milford and District Resource Centre

    Alterations and refurbishment of the Gallowglass Community Centre, Milford, Co. Donegal

    Milford and District Resource Centre requires building works over 6 months, with a maximum total contract value of €600,000, to complete the refurbishment and alterations of the Gallowglass Community Centre in Milford, County Donegal. The works include completing a large multipurpose space, replacing windows, installing building services and new kitchen units, constructing a glazed link, refurbishing the smaller hall and adding toilets, completing building services, and carrying out site works.

    Competition
    Nov 27, 2026(4 days)
    €600,000
  • Raheen Group Water Scheme

    Oppføring av bygninger

    Raheen Group Water Scheme Watermain Replacement

    Raheen Group Water Scheme needs works to replace approximately 2.3 km of existing watermain and install a new booster pump station, including ancillary works, in Ireland’s Mid-West region. The project has a maximum total value of €900,000 and a duration of 4 months.

    Competition
    Jan 29, 2027(67 days)
    €900,000