Find

  • All tenders
All tenders: Ireland/Limerick and Clare Education and Training Board/Modular Classroom replacement at College of FET, Newcastle West Campus, Co. Limerick

Modular Classroom replacement at College of FET, Newcastle West Campus, Co. Limerick

Expired

The competition has expired without a winner being announced.

Deadline
Aug 29, 2024Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€0

Brief

Replacing of two existing pre-fabricated classrooms with new

Various construction materials

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Limerick and Clare Education and Training Board

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Replacing of two existing pre-fabricated classrooms with new

  • Contact

    eamon.murphy@lcetb.ie
  • Type
    Competition
  • Main code
    Construction work
    45000000
  • 44211100Modular and portable buildings

Similar active competitions

  • Limerick and Clare Education and Training Board

    Construction machinery and equipment

    The Supply, Delivery, Installation and Commissioning of Equipment for Technology/Construction/Engineering/DCG in 6 Lots for Limerick and Clare Education and Training Board

    Limerick and Clare Education and Training Board needs the supply, delivery, installation and commissioning of technology, construction, engineering and digital construction equipment across six lots for sites in Ireland’s Mid-West region. This is a supplies framework agreement lasting 4 years, with a maximum total value of €5 million.

    Framework agreement
    Jan 22, 2027(56 days)
    €5,000,000
  • Bunscoil Rís Edmund Rice Senior Primary School

    Construction of buildings

    Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

    Bunscoil Rís Edmund Rice Senior Primary School needs construction works for a 12-month project with a maximum total contract value of €1.95 million. The project involves a two-storey extension to the existing school building in Ireland’s South-East region, with a special education needs unit on the ground floor, four special education teaching rooms on the first floor, and associated site and ancillary works.

    Competition
    Dec 3, 2026(6 days)
    €1,950,000
  • Mount St. Michael Secondary School (Claremorris)

    Construction - Groundwork, water and sewage

    Gas Boiler heating system

    Mount St. Michael Secondary School in Claremorris needs works to replace its existing oil boiler heating system with a gas boiler system, upgrade the LPG storage tanks and complete associated civil works. The project is located in Ireland’s West region, has a maximum total value of €275,000 and is expected to take 3 months.

    Competition
    Dec 17, 2026(20 days)
    €275,000