Find

  • All tenders
Iceland: Tenders/Office of financial service and advisory/Mulitipurpose Sportfacilities building for the sportclub KR

Mulitipurpose Sportfacilities building for the sportclub KR

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Nov 26, 2024Expired
Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
ISK 1until May 2027

Brief

Reykjavik Procurement Office needs the planning, design, and construction of a multipurpose sports facility for the sport club KR, with a total size of approximately 6,700 m², including a 4,400 m² sports hall. The facility will accommodate indoor soccer on an artificial grass field for 8-a-side tournaments, as well as office spaces, a taekwondo room, meeting rooms, and other related activity areas. The main work components include architectural and engineering design, earthwork, concrete/steel structures, exterior and interior finishing (including artificial grass and fixed equipment installation), and the completion of plumbing, electrical systems, and the site. Eykt ehf likely has a similar contract today.

Bygg og anlegg - Oppføring og konstruksjon av bygninger

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Office of financial service and advisory

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Reykjavik City is planning a tender for mulitipurpose Sportfacilities for the sportclub KR at the clubs area this fall. The total size of the planned building is approximately 6.700 m², of which the size of the one floor sporthall is around 4.400 m², Indoor soccer will be practised on an artificial grass field and expected to be able to compete in 8-a-side football tournaments. In the sporthall annex, office spaces, a taekwondo room, meeting rooms and other spaces related to the building's activities are planned. There will be possible to practice and compete in various other sports. The main work components are: • Architectural design of the building. • Engineering design of the building • Earthwork • Concrete and/or steel structures • Exterior finishing • Interior finishing, including artificial grass and installation of fixed equipment • Installation and completion of all plumbing and electrical systems • Completion of the site by the sports hall

  • Contact

    utbod@reykjavik.isutbod@reykjavik.is
  • Type
    Competition · Prequalification
  • Location
    Höfuðborgarsvæði
  • Main code
    Construction work
    45000000
  • 45212200Construction work for sports facilities45212220Multi-purpose sports facilities construction work45236110Flatwork for sports fields

Similar active competitions

  • Office of financial service and advisory

    Ispr eparering og idrettsanlegg

    Operation of an ice rink at Ingólfstorg, Reykjavík

    Skrifstofa fjármálaþjónustu og ráðgjafar needs services for the installation, operation, and dismantling of a real ice rink at Ingólfstorg in Reykjavík during the Christmas season. This is a service concession.

    Competition
  • Landsnet hf

    Grunnarbeid og utleie av anleggsmaskiner

    PIN Notice for Civil and Structural Works at Bakki Substation

    Landsnet hf is planning the procurement of civil and structural works at Bakki Substation, including modifications to the existing switchgear hall and construction of a new transformer building. The scope includes demolition, excavation, reinforced concrete, cladding and insulation, plumbing and drainage, heating, ventilation, mechanical and electrical installations.

    Planning
    Jan 15, 2027(53 days)
  • Hornafjörður

    Kunstgress og idrettsunderlag

    Báran - Renewal of artificial turf

    Sveitarfélagið Hornafjörður needs a new non-infill artificial turf system for the "Báran" indoor football facility in Höfn í Hornafirði, to be delivered and installed over 2 months. The project includes the artificial turf, its installation, pitch markings, finishing work, and all other necessary elements for a fully completed artificial turf area.

    Competition
    Nov 24, 2026(1 day)
    ISK 0