Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 – FW02: Acute Healthcare Capital Works – project value €1M - €15M excl. VAT for HSE Regional Health Area: Cork / Kerry
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Apr 27,Expired
- Award
- Price, weight 25 and 1 more
Brief
The Health Service Executive (HSE) in Ireland has entered into a multi-party framework agreement with David Falconer Architects Ltd, PUNCH Consulting Engineers, AtkinsRéalis_10323, Reddy Architecture + Urbanism, ORS, AECOM Ireland Limited_15958, KSN Project Management, Douglas Carroll Consulting Engineers, AFEC ENGINEERING_115462, GARLAND, Michael Barrett Partnership_76472, Healy Butler Moffat Ltd., Hayes Higgins Partnership, MJ Turley + Associates, Lawlor Burns and Associates_37115, Assigned, Cronin and Sutton Consulting, CuddyQS, CHPR Ltd. T/A John J Casey and Co., Yelland Architects, Don O'Malley and Partners Ltd, Fortress Planning, Crocon Engineers Limited EO, and Murphy Matson O'Sullivan Consulting Engineers Ltd for HSE Design Team Services Framework 2024 – FW02: Acute Healthcare Capital Works. This agreement covers projects with a value between €1M and €15M excluding VAT for the HSE Regional Health Area: Cork / Kerry, specifically for the refurbishment and expansion of the CUH Theatre Block for a new Hybrid Vascular Theatre, Theatre Reception, and Theatre Recovery areas. The contract duration is 4 years, with a maximum total estimated value of 400 million EUR. Four bids were received for this tender.
Arkitekttjenester
Result
- AECOM Ireland Limited_15958Winner
- AFEC ENGINEERING_115462Winner
- AssignedWinner
- AtkinsRéalis_10323Winner
- CHPR Ltd. T/A John J Casey and Co.Winner
- 4Number of tenders received
- Not statedContract value
- Maximum framework agreement valueUp to €0
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Health Service Executive (HSE)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Quality
Source
No source found in the documents. Check the weight against the tender documents.
Description
Price
Source
No source found in the documents. Check the weight against the tender documents.
Description
most economically advantageous tender
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The projects consists of the refurbishment of existing space in the CUH Theatre Block for a new Hybrid Vascular Theatre, including refurbishment and expansion of the current Theatre Reception and Theatre Recovery areas. Hybrid Vascular Theatre: A hybrid vascular theatre is a specialized operating room that combines traditional surgical capabilities with advanced imaging technologies such as MRI and CT which enables intra-operative diagnostics. This allow surgeons to perform both open and minimally invasive procedures on the same patient in a single, controlled environment. This means that the theatre can seamlessly integrate open surgery with endovascular procedures, such as stent placement or aneurysm repair, all without requiring the patient to be moved between different facilities. Theatre Reception: The current footprint of Theatre Reception is inadequate with only 4 bays which are too small and provide little privacy. The Nurse’s station consists of a stand-alone desk in this confined space offering no privacy for Nursing or Medical staff to have patient and/or staff sensitive discussions. The patients w.c. is small and located in a confined, difficult to access area and is not suitable for patients’ requiring chaperones or assistance. There are no Clean or Dirty utility or Storage facilities currently in Theatre Recovery. Theatre Recovery: Theatre Recovery has 9 bays serving 9 Theatres in the main Theatre Complex as well as 2 remote Theatres (Theatre 9 and the Hybrid Theatre). There are no isolation bays within the current footprint. Due to inadequate capacity in Theatre Recovery, patients are regularly recovered within Theatre, while awaiting one of the bays to become available. This has a significant impact on patient flow and Theatre utilization. The reconfigured CUH Theatre Complex with 11 theatres will have 22 Recovery bays. Net Floor Area of 1230 Sqr M
Contact
procurement.helpdesk@hse.ie- Result · Framework agreement · PrequalificationType
- South-WestLocation
- 71200000Main codeArchitectural and related services
- 71300000Engineering services71314300Energy-efficiency consultancy services71321000Engineering design services for mechanical and electrical installations for buildings71324000Quantity surveying services