Multi- Party Framework Agreement for HSE West Civil/Structural Engineering Services (C+S) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Jul 9,Expired
- Award
- Quality, weight 70
Brief
Health Service Executive (HSE) has entered into a multi-party framework agreement with GARLAND for civil/structural engineering services for non-acute healthcare capital works in the HSE West region (Galway, Mayo, and Roscommon). The services will be delivered over 4 years, with an estimated maximum total value of 600 million EUR. The initial project involves the construction of a new 75-bed Community Nursing Unit (CNU) within the Ballina District Hospital campus, including extensive re-planning and upgrade works to the existing district hospital. The project has a floor area of approximately 7,960 m2 and includes demolition, construction of the new CNU, refurbishment of the existing hospital, new car parking areas, and new substation and medical buildings. The award criteria were 30% cost and 70% quality. 11 bids were received.
Tekniske kontrolltjenester
Result
- GARLANDWinner
- 11Number of tenders received
- Not statedContract value
- Maximum framework agreement valueUp to €600,000,000
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Health Service Executive (HSE)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Cost at 30%
Source
No source found in the documents. Check the weight against the tender documents.
Description
Quality at 70%
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Multi- Party Framework Agreement for HSE West Civil / Structural Engineering Services (C+S) Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital. The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia. There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, construction of the new 75 bed CNU, etc, will be tendered as a separate construction contracts (such as enabling works packages main construction package), subject to statutory approvals, HSE Approvals, Funding etc., Please see SAQ document pack.
Contact
procurement.helpdesk@hse.ie- Result · Framework agreementType
- WestLocation
- 71312000Main codeStructural engineering consultancy services
- 71311000Civil engineering consultancy services