Ireland: Tenders/Cork County Council/N4/2/219 - Architect led Design Team for project (21 No. Social Housing units including the refurbishment and re-use of 4 No. existing buildings and associated site works) at Bantry, Co. Cork

N4/2/219 - Architect led Design Team for project (21 No. Social Housing units including the refurbishment and re-use of 4 No. existing buildings and associated site works) at Bantry, Co. Cork

Cancelled

The competition has been cancelled.

Award
Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€900Kover 52 months

Brief

Cork County Council has cancelled the procurement for architect-led design team services for 21 social housing units, including the refurbishment and re-use of 4 existing buildings and associated site works, at Bantry, Co. Cork, due to a change in the client's needs. The services were estimated to have a maximum total contract value of 900,000 EUR and a duration of 52 months. Two bids were received for this procurement.

Arkitekttjenester

Result

TED
  • Reason for cancellation
    Decision of the buyer because of a change in needs
  • Number of tenders received
    2

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Cork County Council

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    NA

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Design Team Services as per the attached documents on eTenders.

  • Contact

    procurement@corkcoco.ie
  • Type
    Result
  • Location
    South-West
  • Main code
    Architectural and related services
    71200000
  • 71220000Architectural design services71240000Architectural, engineering and planning services71400000Urban planning and landscape architectural services

Similar active competitions

  • Cork County Council

    Arkitekttjenester

    Single Service Provider, Engineering Led Multi-Disciplinary Design Team - Stages (iic - v) for Cobh Public Realm Regeneration Phase 1

    Cork County Council seeks an engineering-led multidisciplinary design team, acting as PSDP and Employer’s Representative, to complete the design, procurement and construction stages (Stages iic–v) of the Cobh Public Realm Regeneration Phase 1 project in South-West Ireland. The services contract runs for 52 months and has a maximum total value of €700,000.

    Competition
    Dec 11, 2026(19 days)
    €700,000
  • University College Cork

    Appointment of Integrated Design Team for Cork University Business School New Building

    University College Cork needs an architect-led integrated design team to provide consultancy services for the new Cork University Business School building on Perrott’s Avenue, in Ireland’s South-West region. The 60-month contract has a maximum total value of €2.5 million and covers architectural, civil and structural engineering, mechanical and electrical engineering, Project Supervisor Design Process, and energy-efficient design coordination; quantity surveying services will be procured separately. The competition uses a two-stage restricted procedure.

    Competition with qualification
    Dec 21, 2026(29 days)
    €2,500,000
  • Waterford City and County Council_103683

    Digital design og brukeropplevelse

    WCCC26 496 Integrated Design Team for the Development of 22 Lady Lane

    Waterford City and County Council needs an architect-led multidisciplinary design team for the redevelopment of 22 Lady Lane in Ireland’s South-East, over 3 years, with a maximum total contract value of €6 million. The team must include a Conservation Architect, civil, structural, mechanical and electrical engineers, quantity surveyors, and a building energy consultant.

    Competition
    Nov 23, 2026(1 day)
    €6,000,000