Find

  • All tenders
All tenders: Ireland/Teagasc - the Agriculture and Food Development Authority/New Centre for Sustainable Animal and Grassland Research at Teagasc Moorepark, Co. Cork (Grasslands Building)

New Centre for Sustainable Animal and Grassland Research at Teagasc Moorepark, Co. Cork (Grasslands Building)

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Mar 3Expired
Award
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€7.9Mover 14 months

Brief

Teagasc - the Agriculture and Food Development Authority has entered into an agreement with Conack Construction for the delivery of construction works for a new Centre for Sustainable Animal and Grassland Research (Grasslands Building) at Teagasc Moorepark, Co. Cork, Ireland. The contract has a duration of 14 months and a total value of 7,940,460 EUR. Seven bids were received for this contract.

Construction - Erection, Renovation and Maintenance of Buildings

Result

TED
  • Conack Construction UC
    Winner
  • Number of tenders received
    7
  • Contract value
    €7,940,460

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Teagasc - the Agriculture and Food Development Authority

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Most Economically Advantageous Tender

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • New Centre for Sustainable Animal and Grassland Research at Teagasc Moorepark, Co. Cork (Grasslands Building)

  • Contact

    procurement@teagasc.ie
  • Type
    Result · Prequalification
  • Location
    South-West
  • Main code
    Building construction work
    45210000
  • 45214600Construction work for research buildings45214610Laboratory building construction work

Similar active competitions

  • University College Cork

    Consulting Engineering Services for Construction and Civil Engineering

    Appointment of Integrated Design Team for Cork University Business School New Building

    University College Cork needs an architect-led integrated design team to provide consultancy services for the new Cork University Business School building on Perrott’s Avenue, in Ireland’s South-West region. The 60-month contract has a maximum total value of €2.5 million and covers architectural, civil and structural engineering, mechanical and electrical engineering, Project Supervisor Design Process, and energy-efficient design coordination; quantity surveying services will be procured separately. The competition uses a two-stage restricted procedure.

    Competition with qualification
    Dec 21, 2026(24 days)
    €2,500,000
  • Waterford City and County Council_103683

    Building and Construction - Erection and Construction of Buildings

    WCCC25 494 Munster Express Development Works

    Waterford City and County Council needs refurbishment and extension works at 37 Merchant’s Quay, including demolition and construction of a new three-storey building along Hanover Street, to provide exhibition, office and workshop spaces. The works are located in South-East Ireland, must align with Green Public Procurement criteria and the council’s Circular Economy Programme, and have a maximum total value of €7.2 million over 2 years. The award criteria provided identify quality, with no weighting specified.

    Competition with qualification
    Dec 4, 2026(7 days)
    €7,200,000
  • Framkvæmdasýslan - Ríkiseignir

    Building and Construction - Erection and Construction of Buildings

    Design and Construction of an Agricultural Research Center

    Framkvæmdasýslan – Ríkiseignir, on behalf of the Agricultural University of Iceland, seeks a contractor to design and build an Agricultural Research Centre at Túngata 27a, Hvanneyri, over 20 months. The building will improve the university’s research facilities and support stronger research into crop production in line with government food-security policy.

    Competition
    Feb 9, 2027(74 days)