Netherlands: Tenders/NS Groep N.V./New Commuter Train Sets

New Commuter Train Sets

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Nov 30, 2025Expired
Award
Price
Procedure
With negotiationTwo stages
Agreement
Buying goodsuntil Dec 2036

Brief

Short general description of the Contract: NS intends to conclude a Contract, more specifically a Purchase Agreement, for the delivery of new articulated Train Sets for passenger services in the Netherlands, including but not limited to, driving and maintenance training, documentation, support and spare parts. The Contract therefore consists of: A. A purchase agreement containing a base order of Train Sets, at least intended for operation on the Dutch Railway Network including other items such as mock ups, training and documentation; B. A support agreement and long term support agreement; C. A spare parts agreement(s); D. Optional: o addenda on the purchase agreement for possible additional orders of Train Sets and/or Train Set variants. o Modifications on one or more Train Sets NS may decide to combine the scope of the support activities described in ad. B and C. into a single agreement. Train Set Characteristics of base order The base order foresees, besides the other deliverables, the supply of Train Sets with a total seating volume between approximately 8.000 and 18.000 seats. Operational service of the Train Sets on the Dutch Railway Network is foreseen to start in the second half of 2027. Meaning Acceptance for the first Train Sets is foreseen to take place in 2026. The foreseen characteristics for the base order Train Sets are, as an indication, listed below. The final characteristics will be defined in the Award Guidelines. General vehicle architecture characteristics: • The Train Set complies with applicable standards including but not limited to European and Dutch legislation; • The Train Set is an articulated electrical multiple unit with wide gangways without steps to pass the gangways; • The Train Set has a driver's cab on both ends, and each driver’s cab has an external driver’s cab side door on both sides; • The Train Set has two Train Set variants differing in length, a long Train Set with a length of approximately 107,5 m and a shorter Train Set variant of approximately 2/3 of the length of the long Train Set; • The Train Set incorporates technology which allows it to be easily upgraded with the latest digital developments. General external interface characteristics: • The Train Set is suitable for the operation on the Dutch Railway Network; • The Train Set has a service speed of 160 km/h; • The Train Set is suitable for the 1500 V DC power supply on the Dutch Railway Network; • The Train Set is suitable for the CCS-systems ERTMS and ATB; • The Train Set complies with the kinematic reference gauge G2 and for lower parts GI2; • The Train set has an axle load category C2_500 (<20 t at 500 kg/m2) • The Train Set offers level access from a platform height of 760 mm to flat passenger entry vestibules. Passenger comfort and design characteristics: • The Train Set has an interior layout, door positions and door width offering fast access and egress; • The Train Set has an interior and exterior aesthetic design in accordance with the NS brand design guidelines; • The Train Set appeals to passengers. Operational and performance characteristics: • The Train Set has low life cycle costs; • The Train Set has a high level of reliability; • The Train Set has low energy consumption; • The Train Set is track friendly; • The Train Set is robust, resilient and recoverable in operation, the impact of failures (technical or operational) is minimized by design; • The Train Set is sustainable by design and in use; • The Train Set design is based upon proven technologies; • The Train Set is easily maintainable and designed to minimize the effects of obsolescence • The Train Set is fit for use in the Netherlands with regard to but not limited to environmental and infrastructural conditions; Optional: • As an option, the Train Sets might consider a bicurrent Train Set suitable for a power supply of 1500 V DC and 3000 V DC; • Any other (technical) option(s) will be mentioned in the Award Guidelines Possible additional orders Possible additional orders are foreseen for the supply of Train sets with a total seating volume of approximately 50.000 seats to be ordered until 2036. The seating volume of 50.000 seats is additional to the base order seating volume. This is mainly depending on passenger growth and developments with regard to the transport concession between NS and the Ministry of Infrastructure and Water Management The possible additional orders may consist of several batches with a different number of Cars per batch and with different delivery rates. The possible additional orders may consist of Train Set variants based on the same product platform as the base order with characteristics as described in the section II.2.11) Information about options.

Spesialisert jernbaneutstyr

Result

TED
  • Stadler Rail Schweiz AG
    Winner
  • Number of tenders received
    -2
  • Contract value
    -€1

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at NS Groep N.V.

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Quality

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Price

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Short general description of the Contract: NS intends to conclude a Contract, more specifically a Purchase Agreement, for the delivery of new articulated Train Sets for passenger services in the Netherlands, including but not limited to, driving and maintenance training, documentation, support and spare parts. The Contract therefore consists of: A. A purchase agreement containing a base order of Train Sets, at least intended for operation on the Dutch Railway Network including other items such as mock ups, training and documentation; B. A support agreement and long term support agreement; C. A spare parts agreement(s); D. Optional: o addenda on the purchase agreement for possible additional orders of Train Sets and/or Train Set variants. o Modifications on one or more Train Sets NS may decide to combine the scope of the support activities described in ad. B and C. into a single agreement. Train Set Characteristics of base order The base order foresees, besides the other deliverables, the supply of Train Sets with a total seating volume between approximately 8.000 and 18.000 seats. Operational service of the Train Sets on the Dutch Railway Network is foreseen to start in the second half of 2027. Meaning Acceptance for the first Train Sets is foreseen to take place in 2026. The foreseen characteristics for the base order Train Sets are, as an indication, listed below. The final characteristics will be defined in the Award Guidelines. General vehicle architecture characteristics: • The Train Set complies with applicable standards including but not limited to European and Dutch legislation; • The Train Set is an articulated electrical multiple unit with wide gangways without steps to pass the gangways; • The Train Set has a driver's cab on both ends, and each driver’s cab has an external driver’s cab side door on both sides; • The Train Set has two Train Set variants differing in length, a long Train Set with a length of approximately 107,5 m and a shorter Train Set variant of approximately 2/3 of the length of the long Train Set; • The Train Set incorporates technology which allows it to be easily upgraded with the latest digital developments. General external interface characteristics: • The Train Set is suitable for the operation on the Dutch Railway Network; • The Train Set has a service speed of 160 km/h; • The Train Set is suitable for the 1500 V DC power supply on the Dutch Railway Network; • The Train Set is suitable for the CCS-systems ERTMS and ATB; • The Train Set complies with the kinematic reference gauge G2 and for lower parts GI2; • The Train set has an axle load category C2_500 (<20 t at 500 kg/m2) • The Train Set offers level access from a platform height of 760 mm to flat passenger entry vestibules. Passenger comfort and design characteristics: • The Train Set has an interior layout, door positions and door width offering fast access and egress; • The Train Set has an interior and exterior aesthetic design in accordance with the NS brand design guidelines; • The Train Set appeals to passengers. Operational and performance characteristics: • The Train Set has low life cycle costs; • The Train Set has a high level of reliability; • The Train Set has low energy consumption; • The Train Set is track friendly; • The Train Set is robust, resilient and recoverable in operation, the impact of failures (technical or operational) is minimized by design; • The Train Set is sustainable by design and in use; • The Train Set design is based upon proven technologies; • The Train Set is easily maintainable and designed to minimize the effects of obsolescence • The Train Set is fit for use in the Netherlands with regard to but not limited to environmental and infrastructural conditions; Optional: • As an option, the Train Sets might consider a bicurrent Train Set suitable for a power supply of 1500 V DC and 3000 V DC; • Any other (technical) option(s) will be mentioned in the Award Guidelines Possible additional orders Possible additional orders are foreseen for the supply of Train sets with a total seating volume of approximately 50.000 seats to be ordered until 2036. The seating volume of 50.000 seats is additional to the base order seating volume. This is mainly depending on passenger growth and developments with regard to the transport concession between NS and the Ministry of Infrastructure and Water Management The possible additional orders may consist of several batches with a different number of Cars per batch and with different delivery rates. The possible additional orders may consist of Train Set variants based on the same product platform as the base order with characteristics as described in the section II.2.11) Information about options.

  • Contact

    Erik Guldenaarprocurementsupport@ns.nl
  • Type
    Result · Prequalification
  • Main code
    Rolling stock
    34620000
  • 34000000Transport equipment and auxiliary products to transportation

Similar active competitions

  • BLS AG - Finance & SCM - Strategische Beschaffung

    Spesialisert jernbaneutstyr

    Beschaffung Neue Flotte 2032

    Die BLS AG benötigt für den Regionalpersonenverkehr in der Region Bern voraussichtlich 36 bis 40 neue, rund 105 Meter lange, einstöckige S-Bahn-Triebzüge als Ersatz für 61 Fahrzeuge der Typen RABe 525 NINA und RABe 535 Lötschberger, deren wirtschaftliche Lebensdauer zwischen 2032 und 2036 endet. Die Beschaffung soll einen langfristig zuverlässigen und wirtschaftlichen Betrieb sichern und den Weiterbetrieb der bestehenden Züge samt ETCS-Nachrüstung vermeiden. Ein Vertragswert und eine Laufzeit sind nicht angegeben. Bewertet werden der Anforderungskatalog (43 %), Investitionskosten einschliesslich Optionen (25 %), Betriebskosten (10 %), Instandhaltungskosten (7 %), die Akzeptanz des Werklieferungsvertrags (5 %), Fahrzeugverfügbarkeit und Zuverlässigkeit (je 3 %), europäische Referenzerfahrung (2 %) sowie die Organisation der Gewährleistungsbetreuung (2 %).

    Competition
    Apr 28, 2027(100+ days)
  • ARRIVA vlaky s.r.o.

    Spesialisert jernbaneutstyr

    Dodání železničních jednotek pro účely plnění závazku Hlavního města Prahy a Středočeského kraje II

    ARRIVA vlaky s.r.o. potřebuje dodat nejméně 13 ucelených železničních jednotek BEMU pro regionální osobní dopravu v rámci závazků veřejné služby hlavního města Prahy a Středočeského kraje; smlouva může být rozšířena o dalších až 6 jednotek. Každé vozidlo musí mít nejméně 140 míst k sezení a prostor alespoň pro 2 invalidní vozíky a 2 dětské kočárky; konečný počet a další technické požadavky mohou být upřesněny při jednání. Zakázka probíhá ve dvou fázích – kvalifikační a nabídkové – a před výběrem dodavatele se bude jednat o předběžných nabídkách. Nabídky budou hodnoceny podle ceny všech jednotek (70 %), nákladů na full-service údržbu na kilometr (15,5 %), spotřeby trakční energie na kilometr (9,5 %) a počtu sedadel (5 %).

    Competition with qualification
    Dec 14, 2026(23 days)
  • Provincie Overijssel

    Persontransporttjenester

    Concessie Zutphen-Hengelo-Oldenzaal 2028-2032

    Provincie Overijssel treedt namens de provincies Overijssel en Gelderland op als aanbestedende partij voor de spoorwegconcessie Zutphen–Hengelo–Oldenzaal. De concessie omvat reizigersvervoer per trein in onder meer Overijssel en Gelderland en loopt 4 jaar, met maximaal twee verlengingen van 1 jaar (4+1+1). Tijdens de concessie is elektrificatie van het traject beoogd; in de opvolgende concessie wil de concessieverlener elektrische treinen inzetten. Arriva Personenvervoer Nederland B.V. is beoogd voor de huidige overbruggingsconcessie van 4+1 jaar, met een geraamde totale waarde van circa 37,5 miljoen euro inclusief optiejaar. De beoordeling weegt betrouwbaarheid 46%, gebruiksgemak en comfort 17%, beleving en toegevoegde waarde 6%, kwaliteitsplan 23% en prijs 8%.

    Competition
    Feb 9, 2027(80 days)