Find

  • All tenders
Ireland: Tenders/National Transport Authority_1149/On-Bus Works - Framework for Technology and Fabrication Works on Public Transport Buses 2024 to 2028

On-Bus Works - Framework for Technology and Fabrication Works on Public Transport Buses 2024 to 2028

Awarded

The competition has ended and a winner has been selected.

Deadline
Jul 9, 2024Expired
Procedure
OpenSingle stage
Agreement
Framework agreement
Estimated value
€9.9Muntil May 2028

Brief

The NTA is currently in procurement for two major projects: • Next Generation Automatic Vehicle Location (“NG AVL”); and • Next Generation Ticketing (“NGT”). These procurements will progress to implementation phases starting in Q4 2023 and they will require vehicle location, displays, sensors and ticketing equipment to be installed on all NTA buses (existing and new) in the coming years. This tender competition aims to put in place a Framework Agreement to enable Clients to perform enabling works on public transport buses that will facilitate subsequent implementation of NG AVL and NGT on-bus solutions. The NTA plans to do some advance work on the existing fleet of buses to allow for a faster rollout of the two projects – NG AVL and NGT. This work is being called the “Bus Retrofit” and involves the installation of standardized IP Backbone cabling linking to a number of access points where future equipment will be installed. All cabling will terminate in a central location on the bus where existing and new cabling will be connected up to a demarcation point. Detailed instructions and bill of materials will be provided as part of any Cascade or Mini-Competition. Additional information regarding the Bus Retrofit work is set out in Annex C of the RFT. Additional On-bus fabrication works will be required when legacy ticketing and AVL equipment is removed from the bus – for example, the installation of new driver cockpit flexi-glass to maintain driver security or the removal of poles or installation of other mechanical components to facilitate a fast rollout of NG AVL and NGT. The NTA currently has approximately 2,300 buses comprised of a mix of single deck and double deck and coaches. The majority of the buses are based around the greater Dublin area. Approximately 800 to 1,000 buses will require significant work to install an Ethernet backbone and access point cabling (Bus Retrofit work) from Q4 2023 to Q4 2024 prior to NG AVL installation. Additional information regarding NTA’s bus fleet is set out in the procurement documents. The NTA proposes to implement a multi-lot On-Bus Works Framework Agreement. The On-Bus Works Framework Agreement will provide a shortlist of suitably skilled and experienced Participants who can tender for future On-Bus Works based on lots as and when it is required to support the projects and ongoing operations.

Nettverk og telekommunikasjon

Result

TED
  • Ardee Coach Trim Ltd
    Winner
  • B2 Communications
    Winner
  • Number of tenders received
    0
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at National Transport Authority_1149

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The NTA is currently in procurement for two major projects: • Next Generation Automatic Vehicle Location (“NG AVL”); and • Next Generation Ticketing (“NGT”). These procurements will progress to implementation phases starting in Q4 2023 and they will require vehicle location, displays, sensors and ticketing equipment to be installed on all NTA buses (existing and new) in the coming years. This tender competition aims to put in place a Framework Agreement to enable Clients to perform enabling works on public transport buses that will facilitate subsequent implementation of NG AVL and NGT on-bus solutions. The NTA plans to do some advance work on the existing fleet of buses to allow for a faster rollout of the two projects – NG AVL and NGT. This work is being called the “Bus Retrofit” and involves the installation of standardized IP Backbone cabling linking to a number of access points where future equipment will be installed. All cabling will terminate in a central location on the bus where existing and new cabling will be connected up to a demarcation point. Detailed instructions and bill of materials will be provided as part of any Cascade or Mini-Competition. Additional information regarding the Bus Retrofit work is set out in Annex C of the RFT. Additional On-bus fabrication works will be required when legacy ticketing and AVL equipment is removed from the bus – for example, the installation of new driver cockpit flexi-glass to maintain driver security or the removal of poles or installation of other mechanical components to facilitate a fast rollout of NG AVL and NGT. The NTA currently has approximately 2,300 buses comprised of a mix of single deck and double deck and coaches. The majority of the buses are based around the greater Dublin area. Approximately 800 to 1,000 buses will require significant work to install an Ethernet backbone and access point cabling (Bus Retrofit work) from Q4 2023 to Q4 2024 prior to NG AVL installation. Additional information regarding NTA’s bus fleet is set out in the procurement documents. The NTA proposes to implement a multi-lot On-Bus Works Framework Agreement. The On-Bus Works Framework Agreement will provide a shortlist of suitably skilled and experienced Participants who can tender for future On-Bus Works based on lots as and when it is required to support the projects and ongoing operations.

  • Contact

    procurement@nationaltransport.ie
  • Type
    Result · Framework agreement
  • Location
    Dublin
  • Main code
    Bus maintenance services
    50113200
  • 31224400Connection cables32413100Network routers45255400Fabrication work

Similar active competitions

  • Dublin Bus / Bus Atha Cliath

    Tekniske kontrolltjenester

    Fabrication and maintenance 2026

    Dublin Bus / Bus Atha Cliath needs fabrication, mechanical maintenance, repairs and small new works across its facilities throughout Dublin City and County under a framework with an initial 3-year term and an option to extend by 1 year. The framework has a maximum total value of €1.3 million, subject to budget availability and not representing a spending commitment; Lot 1, covering routine maintenance and new installations under €15,000 excluding VAT, is estimated at approximately €280,000 per year and will be awarded directly, while Lot 2 covers larger installations above €15,000 excluding VAT through mini-competitions. The previous Maintenance and Fabrication Framework 2024 was awarded to Midland Engineering Profiles and Christy Byrne.

    Framework agreement with qualification
    Dec 7, 2026(14 days)
    €1,300,000
  • Dublin Bus / Bus Atha Cliath

    Bil- og motorvognstjenester

    SG Refurb 2027

    Dublin Bus / Bus Átha Cliath needs fleet refurbishment services under a 12-month framework agreement, with a maximum total value of €1.6 million. The work covers refurbishment of vehicle components including engine-bay hoses, suspension, steering, brakes, road wheels, interior and exterior finishes, and some glass elements, with services delivered in Dublin. IRISH COMMERCIALS_5556 holds the previous SG Refurb contract.

    Framework agreement
    Dec 4, 2026(11 days)
    €1,600,000
  • Dublin Bus / Bus Atha Cliath

    Bil- og motorvognstjenester

    Supply of Engines and Sundry Engine Components

    Dublin Bus / Bus Átha Cliath needs a multi-supplier framework for the supply and delivery of replacement engines and miscellaneous engine components to its locations throughout Dublin, for a current fleet of approximately 1,000 buses. The framework covers legacy diesel replacement engines, established maintenance spare parts and new items that arise during the contract, with a comprehensive parts list to be provided at tender stage. It will run for 4 years, with options to extend by four additional 1-year periods, and has a maximum total value of €28.8 million. Future orders may be placed through mini-competitions or other specified mechanisms.

    Framework agreement
    Dec 21, 2026(28 days)
    €28,800,000