P3 Boiler Lot
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Elektrisitet og energiforvaltning
Norrenergi AB is presently preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. The first step in the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its lifetime. The new boiler P3 should be a 70 MW wood powder fired boiler with bio oil as alternative fuel and fossil gas oil as reserve fuel. The delivery is a turnkey contract.
About the bid
- Contact name
- Johanna Stålered
- Contact email
- johanna.stalered@norrenergi.se
- Address
- Box 1177, 17123 SOLNA
Norrenergi AB is presently preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. The first step in the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its lifetime. The new boiler P3 should be a 70 MW wood powder fired boiler with bio oil as alternative fuel and fossil gas oil as reserve fuel. The delivery is a turnkey contract.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Norrenergi Aktiebolag
- Title
- P3 Boiler Lot
- Type
- Main code
- Supplemental codes
No supplemental codes from buyer…