Brief
Norrenergi AB is presently preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. The first step in the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its lifetime. The new boiler P3 should be a 70 MW wood powder fired boiler with bio oil as alternative fuel and fossil gas oil as reserve fuel. The delivery is a turnkey contract.
Elektrisitet og energiforvaltning
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Norrenergi Aktiebolag
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Norrenergi AB is presently preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. The first step in the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its lifetime. The new boiler P3 should be a 70 MW wood powder fired boiler with bio oil as alternative fuel and fossil gas oil as reserve fuel. The delivery is a turnkey contract.
Contact
Johanna Ståleredjohanna.stalered@norrenergi.se- Competition · PrequalificationType
- 42515000Main codeDistrict heating boiler