Phase II: From vision to investment – Pre-feasibility development for water resilience in the Greater Semarang region, Indonesia
Awarded
The competition has ended and a winner has been selected.
- Deadline
- 1. des. 2025Expired
- Award
- Team composition, weight 35 and 1 more
Brief
The Ministry of Economic Affairs, Netherlands Enterprise Agency (RVO) has entered into an agreement with HaskoningDHV Nederland B.V. for the delivery of services related to "Phase II: From vision to investment – Pre-feasibility development for water resilience in the Greater Semarang region, Indonesia." This project, which is a follow-up to "Phase I: Setting the Scene for a coordinated vision for the greater Semarang region towards 2045," contributes to activities under Working Group 1 (Integrated Water Resilience from North Java) and Working Group 3 (Knowledge exchange, capacity building and youth engagement) of the Memorandum of Understanding on Water between the Governments of the Netherlands and Indonesia. The contract has a duration of 24 months and an estimated maximum total value of 700,000 EUR. The award criteria included the plan of approach/work plan (45%), team composition (35%), and financial proposal (20%). Three bids were received for this contract.
Result
- Haskoning Nederland B.V.Winner
- 3Number of tenders received
- €700,000Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Ministerie van Economische Zaken en Klimaat, Rijksdienst voor Ondernemend Nederland (RVO)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
The description is set out in the tender document.
Source
No source found in the documents. Check the weight against the tender documents.
Description
The description is set out in the tender document.
Source
No source found in the documents. Check the weight against the tender documents.
Description
The description is set out in the tender document.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The Government of the Netherlands through the Ministry of Infrastructure and Water Management and the Government of Indonesia through its Ministry of Public Works and Housing have a long-lasting cooperation on water which is secured in a Memorandum of Understanding on Water for 2022-2027. Within the framework of the MoU, the Joint Steering Committee in November 2023 approved to facilitate joint working groups (WGs) enhancing strategic dialogues resulting in (an outline for) a programmatic approach on the following themes: -WG 1: Integrated Water Resilience from North Java to enlighten other priority developments in Indonesia -WG 2: Lowland development and irrigation -WG 3: Knowledge exchange, capacity building and youth engagement This assignment is a follow-up of ‘Phase I: Setting the Scene for a coordinated vision for the greater Semarang region towards 2045’ and contributes to activities under WG 1 and 3 and aligns with the mutual ambitions of both GoI and GoN under the MoU Water. The Tendering Authority has estimated a total contract value for the initial contract period of EUR 400.000,- (exclusive of Dutch VAT and inclusive of all local foreign VAT, fees and other costs). For the optional extension (see paragraph 2.3) the Tendering Authority has estimated a maximum value of EUR 300.000,- (exclusive of Dutch VAT and inclusive of all local foreign VAT, fees and other costs). The maximum contract value is therefore EUR 700.000,-.
Contact
Jessica Scheffersjessica.scheffers@rvo.nl- ResultType
- 75210000Main codeForeign affairs and other services