PREPARATION OF AN INTERIM WASTE MANAGEMENT PLAN FOR PAPHOS DISTRICT AND A FEASIBILITY STUDY FOR THE DEVELOPMENT OF AN INTEGRATED MUNICIPAL SOLID WASTE MANAGEMENT INFRASTRUCTURE NETWORK
Awarded
The competition has ended and a winner has been selected.
- Award
- Procedure
- OpenTwo stages
- Agreement
- Buying services
Brief
The Department of Environment of Cyprus has awarded IDOM Ingeniería y Consultoría a services contract to prepare an interim waste management plan for Paphos District and assess options for an integrated municipal solid waste infrastructure network for 2029–2035. The work includes strategic and feasibility studies, cost-benefit analysis and a public-private partnership value-for-money assessment, a proposal for Council of Ministers approval, and minimum requirements and tender guidelines for future waste management facilities. The contract covers Cyprus, and two bids were received.
Byggeteknisk konsulentvirksomhet
Result
- IDOM Ingeniería y ConsultoríaWinner
- 2Number of tenders received
- Not statedContract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Τμήμα Περιβάλλοντος
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Βάσει Βέλτιστης σχέσης Τιμής-Ποιότητας
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The scope of the Contract is (a) the preparation of an Interim Waste Management Plan for Paphos District in accordance with the Municipal Waste Management Plan 2022-2028 (b) a strategic assessment of available alternatives and options for the development of an integrated network of Municipal Solid Waste Management Infrastructure Network for the treatment of mixed, separately collected and residual waste and the development of a Pre-Feasibility Study for the period 2029-2035 (c) an appraisal of the feasibility of the selected project alternatives and the preparation of a Feasibility Study on Municipal Solid Waste Management Infrastructure Network for the period 2029-2035, including a Cost Benefit Analysis and a PPP Value for Money Assessment (d) the preparation of a Proposal to the Council of Ministers to obtain approval of the proposed project alternative (e) the preparation of minimum Requirements and Tender Guidelines for future municipal solid waste management infrastructure plants.
Contact
Ιωάννα Κωνσταντινίδουjconstantinidou@environment.moa.gov.cy- Result · PrequalificationType
- KýprosLocation
- 71240000Main codeArchitectural, engineering and planning services
- 71241000Feasibility study, advisory service, analysis71242000Project and design preparation, estimation of costs71300000Engineering services71310000Consultative engineering and construction services71311300Infrastructure works consultancy services71313000Environmental engineering consultancy services71318000Advisory and consultative engineering services71323200Plant engineering design services71800000Consulting services for water-supply and waste consultancy