Find

  • All tenders
Ireland: Tenders/IDA Ireland/Project Management Led (PM) Multi Disciplinary Team to deliver a Mobility Management Plan (MMP) for IDA Waterford

Project Management Led (PM) Multi Disciplinary Team to deliver a Mobility Management Plan (MMP) for IDA Waterford

Expired

The competition has expired without a winner being announced.

Deadline
Apr 24,Expired
Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€150Kover 5 years

Brief

IDA Ireland needs project management-led multidisciplinary team services to deliver a Mobility Management Plan (MMP) for IDA Waterford, with a maximum total value of 150,000 EUR over 5 years. The project aims to reduce IDA Ireland client carbon emissions by providing a site-wide Mobility Management Plan, informed by the emerging Transport Strategy for the Park. The appointed consultant should have suitably qualified and experienced resources covering strategic planning, stakeholder engagement, behavioural change, and technical delivery.

Konsulenttjenester innen prosjektstyring og bygging

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at IDA Ireland

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • IDA Strategic Property Team recently carried out an Mobility Management Study in Waterford to determine the key infrastructure measures required in Waterford Industrial Estate and Waterford Business and Technology Park and its wider infrastructure network to tackle existing and future constraints in transport capacity to plan for future levels of development to facilitate projected growth in population and employment and to cater for and encourage sustainable mobility. Following on from this study, IDA Strategic Property Team is now seeking to appoint a Project Management Led Integrated Team to undertake and provide a site wide Mobility Management Plan. In line with IDAs current strategy Adapt Intelligently A Strategy for Sustainable Growth and Innovation 2025-29, delivery of this project aims to assist in reducing IDA Ireland client carbon emissions. The study shall be informed by the emerging Transport Strategy for the Park which outlines multi modal short, medium and long term solutions to enable sustainable growth. The appointed Consultant should consist of suitably qualified and experienced resources which can cover strategic planning, stakeholder engagement, behavioural change, and technical delivery. Full list of requirements are contained within the documents.

  • Contact

    procurement.ida@ida.ie
  • Type
    Competition
  • Location
    South-East
  • Main code
    Project management consultancy services
    72224000
  • 38221000Geographic information systems (GIS or equivalent)63712710Traffic monitoring services71311200Transport systems consultancy services71322500Engineering-design services for traffic installations

Similar active competitions

  • Waterford City and County Council_103683

    Digital design og brukeropplevelse

    WCCC26 496 Integrated Design Team for the Development of 22 Lady Lane

    Waterford City and County Council needs an architect-led multidisciplinary design team for the redevelopment of 22 Lady Lane in Ireland’s South-East, over 3 years, with a maximum total contract value of €6 million. The team must include a Conservation Architect, civil, structural, mechanical and electrical engineers, quantity surveyors, and a building energy consultant.

    Competition
    Nov 23, 2026(1 day)
    €6,000,000
  • Waterford City and County Council_103683

    Arkitekttjenester

    WCCC26 495 Design Team for proposed redevelopment at 25-26 O Connell Street Waterford

    Waterford City and County Council needs an architect-led multidisciplinary design team for the proposed redevelopment of 25–26 O’Connell Street, for a 3-year contract with a maximum total value of €6 million. The team must include an architect accredited in conservation at Grade 3, civil/structural, mechanical and electrical engineers, quantity surveyors, and a building energy consultant. Services are to be delivered in Ireland’s South-East region.

    Competition
    Nov 23, 2026(1 day)
    €6,000,000
  • Kilkenny County Council_1185

    Arkitekttjenester

    Technical Consultancy services for the Kilkenny City Centre Vibrant Streets West

    Kilkenny County Council needs a multidisciplinary technical consultancy team to advance the preliminary and detailed design, statutory planning, enabling works and procurement, construction, and handover of the Kilkenny City Centre Vibrant Streets West scheme. The team must also fulfil the PSDP role and procure specialist services. The contract is for 44 months, with a maximum total value of €5 million, and services are to be delivered in Ireland’s South-East region.

    Competition
    Nov 24, 2026(2 days)
    €5,000,000