Find

  • All tenders
Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/Provision of mechanical works

Provision of mechanical works

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Aug 27,Expired
Award
Financial Score, weight 40
Procedure
With negotiationTwo stages
Agreement
Framework agreement
Estimated value
€359.3Mover 5 years

Brief

La Empresa Común Europea para ITER y el Desarrollo de la Energía de Fusión ("Fusion for Energy") necesita el diseño, adquisición, fabricación, cualificación, instalación, pruebas y puesta en marcha de sistemas mecánicos y trabajos eléctricos y de instrumentación y control asociados en el Complejo Tokamak y edificios circundantes. Este acuerdo marco tiene un valor total máximo de 359.300.000 EUR y una duración de 60 meses. Los criterios de adjudicación se basan en la puntuación técnica (60%) y la puntuación financiera (40%).

Anleggsmaskiner og utstyr

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Technical Score

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Financial Score

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Design, procurement, manufacturing, qualification, installation, testing and commissioning of mechanical systems and associated electric and I&C works in the Tokamak Complex and surrounding buildings.

  • Contact

    Rodia Tsitsiklirodia.tsitsikli@f4e.europa.eu
  • Type
    Competition · Framework agreement · Prequalification
  • Location
    Bouches-du-Rhône
  • Main code
    Electromechanical equipment
    31720000
  • 35111000Firefighting equipment42000000Industrial machinery42500000Cooling and ventilation equipment42510000Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery44162000Piping

Similar active competitions

  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Laboratorietjenester

    Quality Control Inspectors for ITER and Broader Approach and Roadmap Projects

    The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') in Spain needs technical inspection services through a framework agreement for 4 years, with a maximum total value of 23.8 million EUR. The services involve providing resident, itinerant, and spot inspectors at the premises of F4E contractors and/or their subcontractors for Quality Control Inspectors for ITER and Broader Approach and Roadmap Projects. The award criteria are 50% for Technical Score and 50% for Financial Score.

    Framework agreement
    Dec 2, 2026(9 days)
    €23,800,000
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    On site support activities and supply of Test Coils

    Fusion for Energy needs a framework contract for 8 years covering on-site support for ITER magnets—including preservation, preventive maintenance, cold testing and assembly—and the manufacture of test coils. The procurement is for supplies, with on-site work at ITER; the notice does not specify a contract value or award criteria.

    Framework agreement with qualification
    Nov 30, 2026(7 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Brann- og sikkerhetstjenester

    Integration of the JT-60SA Actively Cooled Divertor

    The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) needs services and hardware to integrate the actively cooled divertor for the JT-60SA facility under a 43-month contract. Services include storage, assembly, welding, installation and inspection of divertor and diagnostic components; hardware includes Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components and main water pipe caps. The award criteria are technical quality (60%) and price (40%).

    Competition with qualification
    Nov 30, 2026(7 days)