Find

  • All tenders
Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/Refrigeration system for Isotope Separation System (ISS) of ITER Fuel Cycle

Refrigeration system for Isotope Separation System (ISS) of ITER Fuel Cycle

Planned

The competition has not been announced yet.

Deadline
Apr 1,Expired
Agreement
Buying goods

Brief

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') está planificando la adquisición de un sistema de refrigeración completo para el Sistema de Separación de Isótopos (ISS) del Ciclo de Combustible de ITER, basado en un ciclo de refrigeración Turbo-Brayton, para proporcionar potencia de enfriamiento a nivel de 20K. Este sistema es esencial para la separación de la mezcla de isótopos de hidrógeno mediante destilación criogénica. El futuro contrato abarcará el diseño, adquisición, fabricación, pruebas en fábrica, entrega, instalación, puesta en marcha y aceptación final del sistema.

Kjøle- og ventilasjonsteknologi

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • ISS is dedicated for separation by means of cryogenic distillation of mixture of hydrogen isotopes intended for ensuring correct composition of ITER fuel mixture. The future tender is for design, procurement, manufacturing, factory testing, delivery, installation, commissioning, and final acceptance of complete refrigeration system, based on Turbo-Brayton reversed refrigeration cycle, intended for delivery of cooling power at 20K level required for operation of cryogenic distillation of ISS.

  • Contact

    Rodia Tsitsiklirodia.tsitsikli@f4e.europa.eu
  • Type
    Planning
  • Main code
    Refrigerating equipment
    42513200

Similar active competitions

  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    On site support activities and supply of Test Coils

    Fusion for Energy needs a framework contract for 8 years covering on-site support for ITER magnets—including preservation, preventive maintenance, cold testing and assembly—and the manufacture of test coils. The procurement is for supplies, with on-site work at ITER; the notice does not specify a contract value or award criteria.

    Framework agreement with qualification
    Nov 30, 2026(8 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of Nuclear Safety I&C Consultancy, Design and Qualification Services

    Fusion for Energy is planning a framework contract for nuclear-safety instrumentation and control engineering services, including technical specifications, contract follow-up and system acceptance, I&C consultancy, safety-system design, and related tools or services. Suppliers with relevant I&C engineering expertise can contribute to the procurement’s planning phase; the notice does not specify a feedback method. Amentum Clean Energy France SAS (formerly Jacobs Clean Energy France SAS) has held the existing contract.

    Planning
    Dec 11, 2026(19 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Brann- og sikkerhetstjenester

    Integration of the JT-60SA Actively Cooled Divertor

    The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) needs services and hardware to integrate the actively cooled divertor for the JT-60SA facility under a 43-month contract. Services include storage, assembly, welding, installation and inspection of divertor and diagnostic components; hardware includes Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components and main water pipe caps. The award criteria are technical quality (60%) and price (40%).

    Competition with qualification
    Nov 30, 2026(8 days)