All tenders: France/Mairie Tours/REHABILITATION ET EXTENSION DU COMPLEXE SPORTIF HALLEBARDIER

REHABILITATION ET EXTENSION DU COMPLEXE SPORTIF HALLEBARDIER

Expired

The competition has expired without a winner being announced.

Deadline
May 23, 2024Expired
Award
Quality, weight 16.67 and 4 more
Procedure
OpenSingle stage
Agreement
Construction work

Brief

REHABILITATION ET EXTENSION DU COMPLEXE SPORTIF HALLEBARDIER

Extensions and additions

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Mairie Tours

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Se référer au RC

    Documentation Requirement

    Leverandøren må dokumentere at de oppfyller kravet. Dokumentasjonskrav er spesifisert i anskaffelsesdokumentene.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Se référer au RC

    Documentation Requirement

    Leverandøren må dokumentere at de oppfyller kravet. Dokumentasjonskrav er spesifisert i anskaffelsesdokumentene.

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    Se référer au RC

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Se référer au RC

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Se référer au RC

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Se référer au RC

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Se référer au RC

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Se référer au RC

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • REHABILITATION ET EXTENSION DU COMPLEXE SPORTIF HALLEBARDIERMain features of the procedurePour les lots 1, 2, 3, 4, 5, 6, 7, 9, 12, 13, 14, 15, 17, 18, 19 et 20 : La procédure de passation utilisée est : l'appel d'offres ouvert. En raison de leur valeur estimée (répondant aux caractéristiques des « petits lots »), pour les lots 8, 10, 11 et 16: La procédure de passation utilisée est la procédure adaptée ouverte.

  • Contact

    Direction des Affaires juridiques et de la Commande Publiquescp@ville-tours.fr
  • Type
    Competition
  • Location
    Indre-et-Loire
  • Main code
    Building extension work
    45262800
  • 03410000Wood45100000Site preparation work45111100Demolition work45112500Earthmoving work45112710Landscaping work for green areas45212200Construction work for sports facilities45223100Assembly of metal structures45223200Structural works45223210Structural steelworks45261000Erection and related works of roof frames and coverings45261210Roof-covering work45261420Waterproofing work45262310Reinforced-concrete work45311200Electrical fitting work45313100Lift installation work45321000Thermal insulation work45330000Plumbing and sanitary works45331000Heating, ventilation and air-conditioning installation work45410000Plastering work45420000Joinery and carpentry installation work45421000Joinery work45432111Laying work of flexible floor coverings45442100Painting work45443000Facade work90911200Building-cleaning services

Similar active competitions

  • Mairie de ALLONZIER LA CAILLE

    Building and Construction - Erection and Construction of Buildings

    Réhabilitation et mise aux normes de la salle polyvalente communale d'Allonzier-la-Caille

    La mairie d’Allonzier-la-Caille prévoit la réhabilitation et la mise aux normes de sa salle polyvalente, située au 168 route de Sous-le-Mont, en Haute-Savoie, pour une durée de 7 mois et une valeur totale maximale de 408 500 euros. Le marché de travaux est réparti en 10 lots distincts couvrant notamment la démolition, le gros œuvre, la menuiserie, l’électricité, la plomberie, le chauffage et la ventilation, ainsi que les finitions. Les offres seront évaluées selon le prix (40 %), la méthodologie et la compréhension des contraintes du site (20 %), l’organisation du chantier, les moyens humains et la gestion des nuisances et déchets (20 %), les solutions techniques et la qualité des produits et matériaux (10 %), et la valeur environnementale (10 %).

    Competition
    Jan 4, 2027(37 days)
    €408,500
  • Université de Picardie Jules Verne

    Architectural services

    Marché de Maîtrise d'oeuvre de la réhabilitation énergétique de la Halle de Sports

    L’Université de Picardie Jules Verne recherche une maîtrise d’œuvre pour la réhabilitation énergétique de la Halle de Sports, dans la Somme, dans le cadre d’un contrat de services de 60 mois. Le projet comprend la rénovation du bâtiment d’origine et sa mise en sécurité, notamment le système de sécurité incendie, le désenfumage, les portes coupe-feu et l’accessibilité ; les travaux auront lieu en site inoccupé, avec transfert provisoire des activités. Le marché prévoit une tranche ferme de 2 304 927 € HT et deux tranches optionnelles : l’extension, estimée à 733 428 € HT, et l’embellissement intérieur, estimé à 1 264 284 € HT. Les offres seront évaluées selon la valeur technique (43 %), la performance environnementale (17 %) et le prix (40 %). Le dossier de candidature comprend notamment trois références de l’architecte et une attestation d’inscription à l’Ordre des architectes, ou une preuve équivalente pour les candidats étrangers.

    Competition with qualification
    Dec 7, 2026(9 days)
  • Pleno del Ayuntamiento de Haro

    Building and Construction - Erection and Construction of Buildings

    Ampliación del polideportivo existente y creación de un pabellón multiusos en "El Ferial" de Haro, La Rioja

    Ampliación del polideportivo existente y creación de un pabellón multiusos en "El Ferial" de Haro, La Rioja

    Competition
    Dec 28, 2026(30 days)
    €7,255,862