Rehabilitation of 11 Steel Bridges on the “Vrbnica – Bar” railway line in Montenegro
- Deadline
- Feb 2, 202765 days left
- Award
Brief
Railway Infrastructure of Montenegro JSC (RIoM/ŽICG) needs rehabilitation works on 11 steel railway bridges on the Vrbnica–Bar line in Montenegro, to be completed over 2 years with a maximum total contract value of €28 million. The work is divided into two lots—nine bridges and two bridges—with separate contracts awarded to the same successful tenderer; the railway will remain in commercial operation during the works, and track-dependent activities must take place during scheduled daily closures. The contracts are financed by a European Investment Bank loan and Western Balkans Investment Framework grants and use amended FIDIC Red Book 1999 conditions. Award is based on the lowest combined evaluated price for both lots, subject to the tenderer being qualified to perform both contracts.
Groundwork and construction activities
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Railway Infrastructure of Montenegro JSC - Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Both Lots are awarded to the Tenderer whose substantially responsive Tender offers the lowest combined evaluated price for both Lots, subject to qualification to perform both contracts.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Rehabilitation of eleven steel railway bridges on the Vrbnica – Bar railway line in Montenegro, carried out while the line remains in commercial operation; work that needs the track is done within the daily line closures set out in the Tender Document. The Works are divided into two Lots (Lot#1, nine bridges; Lot#2, two bridges), and a separate contract is signed for each Lot. Each Tender shall cover both Lots, and both contracts will be awarded to the same Tenderer. The contracts are financed by a loan of the European Investment Bank and by investment grants of the Western Balkans Investment Framework (WBIF), and each is governed by the FIDIC Conditions of Contract for Construction (Red Book), First Edition 1999, as amended by the Particular Conditions of Contract.
Contact
Mr. Dragan Radevićprocurement@zicg.me- CompetitionType
- 45234100Main codeRailway construction works