Restricted Procedure for the manufacture and laying of 2 x 33 kV Three-Core Submarine Power Cables with embedded FO cable between Malta and Gozo
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Oct 21,Expired
- Procedure
- With prequalificationTwo stages
Brief
Enemalta plc needs works for the manufacture and laying of two 33kV three-core submarine power cables with embedded Fibre Optic cable between Malta and Gozo, with a maximum total value of 30,000,000 EUR. The project location is Malta.
Elektrisk infrastruktur og veibelysning
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Enemalta plc
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
The overall objective of this request is to have one contractor manufacturing and laying two submarine 33kV cables with embedded Fibre Optic cable between Malta and Gozo.
Contact
procurement.em@enemalta.com.mt- Competition · PrequalificationType
- MaltaLocation
- 45000000Main codeConstruction work
- 45200000Works for complete or part construction and civil engineering work45315400High voltage installation work