Reuter Future Biomass (RFB)
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Nov 16, 2025Expired
- Award
- Leistungsbewertung gemäß Kriterienkatalog, weight 40
Brief
The purpose of the overall undertaking at Reuter Site (located Großer Spreering 5, 13599 Berlin), is to ensure heat supply security in the connected district heating grid by replacement of existing coal fired plants with reliable alternatives and enable the coal phase-out until 2030. Furthermore, the undertaking supports regulatory and strategic needs by focusing on low carbon heat generation. In the course of this undertaking, several projects are being developed by the awarding authority, including building of new generation and infrastructure assets; one of such projects is the Reuter Future Biomass (RFB). The objective of the RFB project is the construction of a highly efficient and sustainable biomass fired district heating plant (combined heat and power) with a thermal production capacity of about 90 MWth. Currently, the permit application is under preparation by the awarding authority. The contractor is in charge of engineering, purchasing, construction & commissioning of its scope. This (lot) includes boiler, steam turbine, flue gas treatment, flue gas condensation, heat pump(s) (or other measurements to optimize efficiency), ash handling & storage, piping (incl. connection to district heating) and chimney(s). Furthermore this lot includes the fuel supply via trucks, the connection to the existing ship unloader, screening systems, equipment for the biomass storage bunker and all of the required conveying systems, secondary steel construction for platforms. In addition the scope includes the water and sewage systems for the biomass plant and for the district heating system. The power supply, the electrical systems and the instrumentation and control systems for the equipment is part of the scope. The scope including the power supply 200V-10kV and a 110kV/10KV-transformer. The combined heat and power plant is fired with biomass: waste wood (A1-A4), forest residue and landscaping material. The boiler shall be designed as fluidized bed boiler. The entire system must be certified with CE conformity and meet all requirements according to European / German legislation. The construction of the new systems and commissioning will take place on dedicated prepared areas, which are ready for construction. At Reuter West the existing units remain in operation during the construction and commission of the new plant. This notice concerns and announces the tender for “lot 2” the Biomass CHP and Fuel Logistics. Other lots and projects will be announced by the awarding authority at a later point in time. However predecessing activities were partly already contracted such as the demolition of the existing buildings as well as preliminary design activities. The civil works, including civil works for the Bio-CHP and fuel logistics, herewith: foundations, concrete works, etc., are considered as lot 1 and already announced and contracted (see announcement TED: 617144-2023).
Anleggsmaskiner og utstyr
Result
- Valmet Technologies OyWinner
- 1Number of tenders received
- €1Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at BEW Berliner Energie und Wärme GmbH
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Preis
Source
No source found in the documents. Check the weight against the tender documents.
Description
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/subproject/0ea0f980-0c6b-45a2-b8e6-acbcd8c1162e/awardcriteria
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The purpose of the overall undertaking at Reuter Site (located Großer Spreering 5, 13599 Berlin), is to ensure heat supply security in the connected district heating grid by replacement of existing coal fired plants with reliable alternatives and enable the coal phase-out until 2030. Furthermore, the undertaking supports regulatory and strategic needs by focusing on low carbon heat generation. In the course of this undertaking, several projects are being developed by the awarding authority, including building of new generation and infrastructure assets; one of such projects is the Reuter Future Biomass (RFB). The objective of the RFB project is the construction of a highly efficient and sustainable biomass fired district heating plant (combined heat and power) with a thermal production capacity of about 90 MWth. Currently, the permit application is under preparation by the awarding authority. The contractor is in charge of engineering, purchasing, construction & commissioning of its scope. This (lot) includes boiler, steam turbine, flue gas treatment, flue gas condensation, heat pump(s) (or other measurements to optimize efficiency), ash handling & storage, piping (incl. connection to district heating) and chimney(s). Furthermore this lot includes the fuel supply via trucks, the connection to the existing ship unloader, screening systems, equipment for the biomass storage bunker and all of the required conveying systems, secondary steel construction for platforms. In addition the scope includes the water and sewage systems for the biomass plant and for the district heating system. The power supply, the electrical systems and the instrumentation and control systems for the equipment is part of the scope. The scope including the power supply 200V-10kV and a 110kV/10KV-transformer. The combined heat and power plant is fired with biomass: waste wood (A1-A4), forest residue and landscaping material. The boiler shall be designed as fluidized bed boiler. The entire system must be certified with CE conformity and meet all requirements according to European / German legislation. The construction of the new systems and commissioning will take place on dedicated prepared areas, which are ready for construction. At Reuter West the existing units remain in operation during the construction and commission of the new plant. This notice concerns and announces the tender for “lot 2” the Biomass CHP and Fuel Logistics. Other lots and projects will be announced by the awarding authority at a later point in time. However predecessing activities were partly already contracted such as the demolition of the existing buildings as well as preliminary design activities. The civil works, including civil works for the Bio-CHP and fuel logistics, herewith: foundations, concrete works, etc., are considered as lot 1 and already announced and contracted (see announcement TED: 617144-2023).
Contact
Berliner Energie und Wärme GmbHmihael.adzic.external@bew.berlin- Result · PrequalificationType
- BerlinLocation
- 45251100Main codeConstruction work for power plant
- 09323000District heating31170000Transformers42112100Steam turbines42160000Boiler installations42511110Heat pumps45251140Thermal power plant construction work45252120Water-treatment plant construction work