Find

  • All tenders
Ireland: Tenders/Bord Iascaigh Mhara - Irish Sea Fisheries Board ( BIM )/RFT for the provision of Paired Vertical Axis Wind Turbine (VAWT)

RFT for the provision of Paired Vertical Axis Wind Turbine (VAWT)

Awarded

The competition has ended and a winner has been selected.

Deadline
Jul 10, 2025Expired
Award
Quality Award Criteria, weight 60
Procedure
OpenSingle stage
Agreement
Buying goods

Brief

The supply of a paired vertical axis wind turbine to be deployed in conjunction with a hybrid energy system to be deployed at a site in Co. Galway.

Kraftforsyning og reservestrøm

Result

TED
  • Emerald Energies
    Winner
  • Number of tenders received
    1
  • Contract value
    €58,500

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Bord Iascaigh Mhara - Irish Sea Fisheries Board ( BIM )

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Ultimate Price

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    4 Quality Award Criteria (60%): QAC1: Technical Capacity (30%) QAC2: Warranty and proposed after-sale support (10%) QAC3: Environmental Responsibility (15%) QAC4: Corporate Social Responsibility (5%)

    Sub-criteria

    • Technical CapacityWeight 30

      Technical Capacity

    • Warranty and after-sale supportWeight 10

      Warranty and proposed after-sale support

    • Environmental ResponsibilityWeight 15

      Environmental Responsibility

    • Corporate Social ResponsibilityWeight 5

      Corporate Social Responsibility

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The supply of a paired vertical axis wind turbine to be deployed in conjunction with a hybrid energy system to be deployed at a site in Co. Galway.Main features of the procedureThis was an open RFT procedure completed in 2022. Any qualified vendor was invited to respond

  • Contact

    tenders@bim.ie
  • Type
    Result
  • Location
    Dublin
  • Main code
    Wind-energy generators
    31121300
  • 31121320Wind turbines

Similar active competitions

  • Electricity Supply Board

    Rådgivende ingeniørtjenester for bygg og anlegg

    Offshore Wind Resource and Metocean Measurement Campaign in Ireland and the UK

    Electricity Supply Board (ESB) needs services for an Offshore Wind Resource and Metocean Measurement Campaign in Ireland and the UK. The project location is Dublin.

    Qualification system
    Oct 27, 2028(100+ days)
  • Bord na Móna PLC

    Kraftforsyning og reservestrøm

    EM 06/24 Wind Turbine Supply Qualification System (TSA)

    Contracts awarded under this Qualification System will include but not be limited to the provision of: Suitably qualified candidates interested in this Qualification System will be considered for the Wind Turbine Supply contract and the Wind Turbine Service and Availability Agreement contract (WTSA). The Wind Turbine Supply contract will outline the terms and conditions between the supplier and the buyer for the provision of wind turbines and related equipment. This will include, but not limited to, the scope of supply, specified number of turbines, type, and specifications of the turbines, along with the delivery schedule. The contract will also address (but not limited to) pricing, payment terms, warranties, performance guarantees, and installation requirements. This contract will serve to ensure all parties' expectations are clearly defined, minimizing risks and promoting a successful wind energy project The Wind Turbine Service and Availability Agreement (WTSA) contract between the wind turbine operator and the service provider will outline the terms and conditions for maintaining the turbine’s operational performance. The agreement will typically include provisions for scheduled maintenance, emergency repairs, and technical support to ensure the turbines operate at peak efficiency. It also specifies service response times, availability guarantees, and performance benchmarks. The WTSA typically includes clauses related to spare parts, safety protocols, and compliance with industry standards. Additionally, the contract may establish financial terms such as payment structures for services rendered, penalties for non-compliance, and incentives for exceeding availability targets. The contract may establish financial terms such as payment structures for services rendered, penalties for non-compliance, and incentives for exceeding availability targets. The goal is to maximize uptime, minimize downtime, and optimize the overall performance and longevity of the wind turbine system.

    Qualification system
    Mar 5, 2028(100+ days)
  • Electricity Supply Board

    Rådgivende ingeniørtjenester for bygg og anlegg

    Offshore Geophysical Surveys Qualification System

    Electricity Supply Board (ESB) needs offshore geophysical survey services for the development of its offshore wind farm project(s) in Ireland and the UK. The services are intended to provide significant seabed and sub-seabed information to assist in the offshore wind farm design phase and subsequent turbine and cable installation.

    Qualification system
    Oct 20, 2028(100+ days)