Kerry Education and Training Board is planning the procurement of refurbishment and upgrade works for the Science Lab at Castleisland Community College, including gas works, new flooring, painting, and the installation of new laboratory furniture and equipment. The estimated maximum total contract value is 200,000 EUR.
Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Kerry Education and Training Board
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Declaration of Suitability for Contractors for Small Works (Open Procedure only)
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
From the notice
Proposed Scope of Works Castleisland Community College comprises of a single storey main building with standalone boiler house and electrical switch room originally constructed in 1987 with a gross floor area of approximately 2,544m2 as shown in the school plan included at Figure 1 below. The proposed Climate Action Summer Works Project is for a Category 5 Science Labs upgrade including Gas Works. The existing Science Lab extends to a gross floor area of approximately 100m2 comprising: - • Main Science Lab • Preparation Room • Storeroom The proposed project is to upgrade the Science Lab in accordance with the current Department of Education TGD 003 and TGD 031 and the current template Science Lab layout in so far as is practical working within the physical constraints of the existing room layout. The school gross floor area is approximately 2,544 m2. The proposed project relates to a Category 5 upgrade to the Science Lab which has a gross floor area of 100m2. The science lab furniture equipment and flooring all date from the original 1987 school construction and have passed end of economic life and require full upgrade replacement and room refurbishment to current TGD standard in order to enable the school to deliver the current science curriculum effectively – refer to Photo 1 to Photo 6 attached. The Teachers workstation is very unsatisfactory with a raised platform and a step which is a trip hazard refer to Photo 1. There are very inadequate / inappropriate storage units with glass vessels being stored on open shelving – refer to Photo 3 and chemicals also on open shelving as shown in Photo 5. The fume cupboard shown in Photo 2 is not functional and the fume extract ventilation is no longer operational, and several of the lab sink taps and gas taps are defective and have been isolated. Proposed Schedule of Works Item Description 1 Preliminaries 2 Main Demolitions & Strip Out 3 Chasing, coring and opening up for new services 4 Construct new U/G Ducts for Services to Island Units 5 Alterations to tie into U/G drainage in Courtyard 6 New Accessible width Fire Doors 7 New Vinyl Flooring to Lab, Prep Room and Store 8 New Splashback Ceramic Wall Tiles 9 Painting and redecoration to Lab, Prep Room & Store 10 Builders attendance on M&E & Furniture Specialist 11 Mechanical Isolations & Strip Out 12 New Above Ground Soils and Wastes 13 New Water Services to Pods and Sinks 14 New gas services to Pods and Prep Room 15 New gas pressure proving safety systems 16 Alterations to heating distribution system 17 Fume hood & Chemical store Extract ventilation 18 Electrical Isolations and Strip Out 19 New Science Lab Sub Board 20 New General Service & Equipment Power 21 Alterations to lighting and emergency lighting 22 New ICT Services 23 Alterations to Fire Alarm & Interface to Gas 24 New Fitted Laboratory Furniture & Equipment 25 New Fume Cupboard 26 New Loose Furniture Table and Lab Stools Note The above schedule is an overview of the works to be carried out