Roof Repair Works at St. Colman's College Claremorris

Expired

The competition has expired without a winner being announced.

Deadline
Jun 23, 2025Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€265Kover 90 days

Brief

Repair works to an existing flat roof at St. Colman's College Claremorris, including new insulation, roofing membrane, upstands, roof windows, edges, flashing, gutters, etc.

Building and Construction - Erection and Construction of Buildings

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at St. Colman's College (Claremorris)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Repair works to an existing flat roof at St. Colman's College Claremorris, including new insulation, roofing membrane, upstands, roof windows, edges, flashing, gutters, etc.

  • Contact

    office@stcolmans.ie
  • Type
    Competition
  • Location
    West
  • Main code
    Construction work for school buildings
    45214200

Similar active competitions

  • Scoil Padre Pio

    Roofing Work and Roof Covering

    Roof Refurbishment Works at Scoil Padre Pio Churchfield Terrace West, Churchfield, Cork

    Scoil Padre Pio needs roof refurbishment works at its Churchfield Terrace West site in Churchfield, Cork, over 2 months, with a maximum total contract value of €400,000. The work includes cleaning existing roofs, repairing asphalt roof surfaces, installing new roof outlets and a vapour control layer, mechanically fixing insulation to the existing substrate, installing new waterproofing layers, and fitting aluminium fascia and soffits.

    Competition
    Dec 11, 2026(12 days)
    €400,000
  • Mount St. Michael Secondary School (Claremorris)

    Construction - Groundwork, water and sewage

    Gas Boiler heating system

    Mount St. Michael Secondary School in Claremorris needs works to replace its existing oil boiler heating system with a gas boiler system, upgrade the LPG storage tanks and complete associated civil works. The project is located in Ireland’s West region, has a maximum total value of €275,000 and is expected to take 3 months.

    Competition
    Dec 17, 2026(18 days)
    €275,000
  • Bunscoil Rís Edmund Rice Senior Primary School

    Construction of buildings

    Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

    Bunscoil Rís Edmund Rice Senior Primary School needs construction works for a 12-month project with a maximum total contract value of €1.95 million. The project involves a two-storey extension to the existing school building in Ireland’s South-East region, with a special education needs unit on the ground floor, four special education teaching rooms on the first floor, and associated site and ancillary works.

    Competition
    Dec 3, 2026(4 days)
    €1,950,000