Find

  • All tenders
Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/Set-up and Operation of an Electron Cyclotron Launcher Components Test Facility, ECT-Falcon (Electron Cyclotron Test Facility Launcher Components).

Set-up and Operation of an Electron Cyclotron Launcher Components Test Facility, ECT-Falcon (Electron Cyclotron Test Facility Launcher Components).

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Deadline
Dec 16, 2025Expired
Agreement
Buying services

Brief

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ha modificado un contrato con la École polytechnique fédérale de Lausanne (EPFL) para la configuración y operación de una instalación de prueba de componentes de lanzadores de ciclotrón de electrones (ECT-Falcon). El contrato, que se refiere a servicios, incluye la configuración y operación de una instalación para pruebas de ondas milimétricas de baja y alta potencia para componentes y subconjuntos de los lanzadores de ciclotrón de electrones, así como todas las actividades técnicas relacionadas. También abarca la adquisición de hardware (Hardware de Propósito Especial) y la provisión de artículos de emisión libre por parte de F4E, según sea necesario, para configurar la instalación y realizar las pruebas.

Forsknings- og utviklingsvirksomhet og tilhørende konsulenttjenester

Result

TED
  • École polytechnique fédérale de Lausanne (EPFL)
    Winner
  • Number of tenders received
    0
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The scope of the contract concerns both the set-up and the operation of a facility for the low and high power mm-wave testing for components and sub-assemblies of the Electron Cyclotron Launchers and all technical activities in connection. It also includes the procurement of hardware (Special Purpose Hardware), and the provision of Free-Issue items by F4E, as required, to set-up the Facility and to perform the tests.

  • Contact

    Estelle GuisseauEstelle.Guisseau@f4e.europa.eu
  • Type
    Result
  • Main code
    Research and experimental development services
    73100000

Similar active competitions

  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    On site support activities and supply of Test Coils

    Fusion for Energy needs a framework contract for 8 years covering on-site support for ITER magnets—including preservation, preventive maintenance, cold testing and assembly—and the manufacture of test coils. The procurement is for supplies, with on-site work at ITER; the notice does not specify a contract value or award criteria.

    Framework agreement with qualification
    Nov 30, 2026(6 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of Nuclear Safety I&C Consultancy, Design and Qualification Services

    Fusion for Energy is planning a framework contract for nuclear-safety instrumentation and control engineering services, including technical specifications, contract follow-up and system acceptance, I&C consultancy, safety-system design, and related tools or services. Suppliers with relevant I&C engineering expertise can contribute to the procurement’s planning phase; the notice does not specify a feedback method. Amentum Clean Energy France SAS (formerly Jacobs Clean Energy France SAS) has held the existing contract.

    Planning
    Dec 11, 2026(17 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Brann- og sikkerhetstjenester

    Integration of the JT-60SA Actively Cooled Divertor

    The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) needs services and hardware to integrate the actively cooled divertor for the JT-60SA facility under a 43-month contract. Services include storage, assembly, welding, installation and inspection of divertor and diagnostic components; hardware includes Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components and main water pipe caps. The award criteria are technical quality (60%) and price (40%).

    Competition with qualification
    Nov 30, 2026(6 days)