Brief
Kerry County Council needs design and build services for the South Kerry Greenway, specifically for Greenway Section 2A (Ch 18,150 to Ch 21,231), Greenway Section 2C (Ch 22,145 to Ch 25,678), N70 Overbridge (CH 26,870), and Kells Car Park (CH 18,150), with a maximum total value of 24,000,000 EUR over 30 months. The works encompass all necessary elements to complete the greenway, including design, PSDP Services, PSCS Services, environmental management, earthworks, drainage, pavement, fencing, landscaping, signage, slope stabilization, retaining wall construction, rehabilitation of existing structures, construction of new structures, road realignment, and traffic management. The project requires strict environmental controls, including adherence to the Construction Environmental Management Plan (CEMP) and other environmental management plans, particularly concerning the Kerry Slug. The competition has multiple phases, with pre-qualified candidates invited to a second stage tender, where awards will be based on the Most Economically Advantageous Tender, with 70% weighting on Quality and 30% on Price.
Bygg og anlegg - Bruer og tunneler
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Kerry County Council_1204
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Kerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of a 27 km greenway between Glenbeigh and Cahersiveen Co. Kerry. The route has been split up into several construction packages with Kerry County Council undertaking the construction of some of the works under direct labour. This tender competition covers the Design and Build elements of the scheme only, which includes Greenway Section 2A (Ch 18,150 to Ch 21,231), Greenway Section 2C (Ch 22,145 to Ch 25,678), N70 Overbridge (CH 26,870) and Kells Car Park (CH 18,150). The works requirements for the above sections will encompass all works necessary to complete the greenway including, design, PSDP Services, PSCS Services, environmental management, earthworks, drainage, pavement, fencing, landscaping, signage, slope stabilization, retaining wall construction, rehabilitation of existing structures, construction of new structures, road realignment, traffic management and all other services necessary to complete the works. The Design and Build Section contains a number of tunnels of historical and cultural significance. Please note the Cahersiveen (Valentia Estuary) Bridge, the Gleensk Viaduct and the N70 Underpass are not included in the scope of this Design and Build competition. It is a requirement that all the conditions imposed by the Planning Consent, the Environmental Impact Assessment Report, the associated Schedule of Environmental Commitments, and the Natura Impact Statement, and any Wildlife and Derogation Licences are complied with in full. The greenway route traverses or is in close proximity to several Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The project is subject to strict environmental controls in accordance with the plans, particulars and conditions associated with the project consents. Environmental management will form a key part of the successful execution of this project. In particular, it is a requirement that construction is carried out in accordance with the Construction Environmental Management Plan (CEMP), other environmental management plans required under the EIAR and NIS, relevant Wildlife and derogation licences to create and manage a suitable receiving environment for the Kerry Slug in the area affected by the proposed greenway. A series of advance works contracts have been completed. These include the construction of a Gabion Trial Section at Mountain Stage and Site Clearance and Temporary Fencing. Candidates that are pre-qualified and shortlisted on the basis of their responses to this first stage Pre-Qualification may be invited to participate in the second stage Tender. That tender competition will be awarded on the basis of the Most Economically Advantageous Tender based on Award Criteria made up of 70 (Quality) and 30 (Price).
Contact
CPCU@kerrycoco.ie- Competition · PrequalificationType
- South-WestLocation
- 45000000Main codeConstruction work
- 45221000Construction work for bridges and tunnels, shafts and subways45221243Pedestrian tunnel construction work45233162Cycle path construction work