Find

  • All tenders
Ireland: Tenders/St. Francis College (Rochestown)/St. Francis College, Rochestown – Main Contract

St. Francis College, Rochestown – Main Contract

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Jan 17, 2025Expired
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€39M

Brief

Post-primary school project on a steeply sloping site comprising a multistorey extension including a PE hall c.7,750m2, with demolition, reconfiguration and refurbishment to the existing historic school buildings, complete with ballcourts, carparking, roadworks, landscaping and all associated siteworks, including retaining structures. The project will be phased, requiring the relocation of existing temporary accommodation and the provision of new temporary accommodation for the duration of construction. The works will be on a live school campus and the existing school must be kept operational at all times.

Bygg og anlegg - Oppføring og konstruksjon av bygninger

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at St. Francis College (Rochestown)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Post-primary school project on a steeply sloping site comprising a multistorey extension including a PE hall c.7,750m2, with demolition, reconfiguration and refurbishment to the existing historic school buildings, complete with ballcourts, carparking, roadworks, landscaping and all associated siteworks, including retaining structures. The project will be phased, requiring the relocation of existing temporary accommodation and the provision of new temporary accommodation for the duration of construction. The works will be on a live school campus and the existing school must be kept operational at all times.

  • Contact

    principal@stfranciscollege.ie
  • Type
    Competition · Prequalification
  • Location
    South-West
  • Main code
    Secondary school construction work
    45214220
  • 45210000Building construction work45214000Construction work for buildings relating to education and research45214200Construction work for school buildings

Similar active competitions

  • Bunscoil Rís Edmund Rice Senior Primary School

    Oppføring av bygninger

    Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

    Bunscoil Rís Edmund Rice Senior Primary School needs construction works for a 12-month project with a maximum total contract value of €1.95 million. The project involves a two-storey extension to the existing school building in Ireland’s South-East region, with a special education needs unit on the ground floor, four special education teaching rooms on the first floor, and associated site and ancillary works.

    Competition
    Dec 3, 2026(10 days)
    €1,950,000
  • Scoil Padre Pio

    Takarbeid og taktekking

    Roof Refurbishment Works at Scoil Padre Pio Churchfield Terrace West, Churchfield, Cork

    Scoil Padre Pio needs roof refurbishment works at its Churchfield Terrace West site in Churchfield, Cork, over 2 months, with a maximum total contract value of €400,000. The work includes cleaning existing roofs, repairing asphalt roof surfaces, installing new roof outlets and a vapour control layer, mechanically fixing insulation to the existing substrate, installing new waterproofing layers, and fitting aluminium fascia and soffits.

    Competition
    Dec 11, 2026(18 days)
    €400,000
  • Presentation Secondary School

    Rådgivende ingeniørtjenester for bygg og anlegg

    2026 Civil Structural Engineering Consultancy Services for PRESENTATION SECONDARY SCHOOL MITCHELSTOWN CO.CORK

    Presentation Secondary School needs civil and structural engineering consultancy services for its Category 7 Climate Action and window works in Mitchelstown, County Cork, in Ireland’s South-West region. The project has a 14-month duration, and the consultancy fees and VAT are capped at €580,740.20 or the total cost of the works, whichever is lower.

    Competition
    Dec 10, 2026(17 days)
    €0