Ireland: Tenders/St. Francis College (Rochestown)/St. Francis College, Rochestown – Mechanical Reserved Specialist

St. Francis College, Rochestown – Mechanical Reserved Specialist

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Jan 17, 2025Expired
Procedure
With prequalificationTwo stages
Agreement
Construction work
Estimated value
€3.7M

Brief

The complete mechanical installation for a post-primary school project on a steeply sloping site comprising a multistorey extension including a PE hall c.7,750m2, with demolition, reconfiguration and refurbishment to the existing historic school buildings, complete with ballcourts, carparking, roadworks, landscaping and all associated siteworks, including retaining structures. The project will be phased, requiring the relocation of existing temporary accommodation and the provision of new temporary accommodation for the duration of construction. The works will be on a live school campus and the existing school must be kept operational at all times.

Mekaniske installasjoner

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at St. Francis College (Rochestown)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The complete mechanical installation for a post-primary school project on a steeply sloping site comprising a multistorey extension including a PE hall c.7,750m2, with demolition, reconfiguration and refurbishment to the existing historic school buildings, complete with ballcourts, carparking, roadworks, landscaping and all associated siteworks, including retaining structures. The project will be phased, requiring the relocation of existing temporary accommodation and the provision of new temporary accommodation for the duration of construction. The works will be on a live school campus and the existing school must be kept operational at all times.

  • Contact

    principal@stfranciscollege.ie
  • Type
    Competition · Prequalification
  • Location
    South-West
  • Main code
    Mechanical installations
    45350000
  • 45214200Construction work for school buildings45214220Secondary school construction work51100000Installation services of electrical and mechanical equipment51120000Installation services of mechanical equipment

Similar active competitions

  • Midleton CBS Primary School

    Mekaniske installasjoner

    Midleton CBS Primary School, Rosary Place, Midleton, Co. Cork – EWS 2no. Boiler Plant Replacement

    Midleton CBS Primary School requires boiler plant replacement works at its Rosary Place site in Midleton, County Cork, over 1 year, with a maximum total contract value of €200,000. The works include removing the existing plant from both boiler houses and installing wall-mounted boilers, pipework, valves, pumps, headers, a heat exchanger, insulation and boiler-house controls.

    Competition
    Nov 24, 2026(0 days)
    €200,000
  • Salesian College (Celbridge)_1840

    Kjøle- og ventilasjonsteknologi

    Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

    Salesian College in Celbridge, County Kildare, requires mechanical works to decommission and replace the existing space-heating installation and heating centre in its main building. The works are to be carried out in Ireland’s Mid-East region over 8 months, with a maximum total contract value of €491,611.50.

    Competition
    Nov 24, 2026(0 days)
    €491,611
  • Presentation Secondary School

    Rådgivende ingeniørtjenester for bygg og anlegg

    2026 Civil Structural Engineering Consultancy Services for PRESENTATION SECONDARY SCHOOL MITCHELSTOWN CO.CORK

    Presentation Secondary School needs civil and structural engineering consultancy services for its Category 7 Climate Action and window works in Mitchelstown, County Cork, in Ireland’s South-West region. The project has a 14-month duration, and the consultancy fees and VAT are capped at €580,740.20 or the total cost of the works, whichever is lower.

    Competition
    Dec 10, 2026(16 days)
    €0