Germany: Tenders/EnBW Energie Baden-Württemberg AG/Subsea Inspection

Subsea Inspection

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Apr 26,Expired
Award
ROV Specification, weight 9.09 and 5 more
Procedure
With negotiationTwo stages
Agreement
Framework agreement
Estimated value
€6Muntil Mar 2031

Brief

EnBW Energie Baden-Württemberg AG has entered into a framework agreement with RS DIVING Contractor GmbH for the delivery of subsea inspection services for offshore wind farms in the Baltic Sea and North Sea, with a maximum total estimated value of 6 million EUR. The services include visual and functional inspections of underwater support structures of wind turbine generators and offshore substations, to be performed between April and September. The contractor is responsible for the full organization of the offshore campaign, including providing a suitable DP2 vessel, logistics, crew transfers, and ROV inspection equipment. Personnel must have valid offshore wind certifications and documented experience in subsea inspections. Specific requirements include the suitability of the proposed ROV(s) for various environmental conditions and tasks such as General Visual Inspection (GVI), Close Visual Inspection (CVI), Ultrasonic Wall Thickness Measurement (UT), Marine Growth (MG) Measurement, Cathodic Protection (CP) Potential Measurement, and MG Cleaning. The project also requires robust project management, including document management, progress monitoring, and post-execution quality reporting. Seven bids were received for this contract.

Fergetransport

Result

TED
  • RS DIVING CONTRACTOR GmbH
    Winner
  • Number of tenders received
    7
  • Contract value
    Not stated
  • Maximum framework agreement valueUp to -€1

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at EnBW Energie Baden-Württemberg AG

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Contract deviations

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Suitability of proposed ROV(s): - Appropriate ROV type/classification - ROV weight (kg)/dimensions (m) - ROV thruster speed suitable for currents - ROV justified and demonstrates experience in executing similar work - ROV capable of performing in a variety of environmental conditions - Operational limits are reasonable (e.g. for L&R) - Max ROV payload suitable for carrying required tooling

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Suitability of proposed methods and tooling to perform scope of work: - General Visual Inspection (GVI) - Close Visual Inspection (CVI) - Ultrasonic Wall Thickness Measurement (UT) - Marine Growth (MG) Measurement - Cathodic Protection (CP) Potential Measurement - Reference-based Measurement of Cable Protection System (CPS) and Scour - MG Cleaning to CSWIP Grade SA 2½

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Capabilities beyond scheduled works: - Subject Matter Expert (e.g. CP) - Continuous improvement of inspection execution - Additional inspection methods (e.g. 3D anode scanning) - Custom inspection solutions to address unexpected requirements

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Review of provided personnel qualifications: - Organigrams, CVs and competency matrices for key roles - Verification of personnel information (e.g. required qualifications and training records)

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Review of provided project management qualifications: - Document management system - Monitoring of progress during mobilisation and execution - Post-execution quality and reporting - Strong evidence of experience through submission of supporting documentation (e.g. RAMS or inspection reports) - Suitable management system in place for provision of any critical tooling, equipment and materials - Robust back-office team to support offshore delivery team - Where subcontracted, clear selection process for subcontractors - Where subcontracted, clear management process for subcontractors

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Total Cost of Ownership

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.

  • Contact

    g.madeddu@enbw.com
  • Type
    Result · Framework agreement · Prequalification
  • Main code
    ROV services
    63726620
  • 71730000Industrial inspection services76521000Offshore installation services79961320Underwater photography services

Similar active competitions

  • EnBW Energie Baden-Württemberg AG

    Rock Dumping Services

    1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

    Qualification system
    Dec 16, 2028(100+ days)
  • GRAND PORT MARITIME DE DUNKERQUE

    Brann- og redningskjøretøy

    Accord-cadre relatif aux travaux subaquatiques pour le remplacement du système de protection cathodique sur différents ouvrages du GPMD

    Le Grand Port Maritime de Dunkerque recherche, dans le cadre d’un accord-cadre de travaux d’une durée de 6 ans et d’une valeur maximale totale de 5 millions d’euros, des travaux subaquatiques de remplacement du système de protection cathodique sur différents ouvrages du port, dans le département du Nord. La consultation précédente ayant été déclarée sans suite, il s’agit de sa relance. Les offres seront évaluées selon le prix (70 %), la qualité des prestations (25 %) — notamment les moyens humains et matériels, la méthodologie, la qualité technique des anodes et la gestion des contraintes d’exploitation des sites — ainsi que la qualité, la sécurité et l’environnement (5 %).

    Framework agreement
    Nov 30, 2026(8 days)
    €5,000,000
  • Energinet Eltransmission A/S

    and 1 other
    Geotekniske undersøkelser

    Marine Archeology for the Bornholm Energy Island project - 26/12562

    Energinet Eltransmission A/S needs marine archaeological investigation services for a 2-year contract with an expected total value of €12 million. The work covers an approximately 200 km submarine cable route between Bornholm and Zealand in the Baltic Sea, including ROV and diver inspections, vibrocore and probe sampling, and marine archaeological test pits. Applicants may submit up to five comparable references from the past five years, and must provide a team including a lead marine archaeologist with a relevant master’s degree and at least 8 years’ experience, a lead geologist with at least 8 years’ experience in 3D ground modelling, and a lead diving manager with professional certification for diving operations to 40 m and at least 8 years’ experience. Tenders are evaluated on price (30%), schedule (20%), equipment (25%) and execution plan (25%); quality submissions must meet minimum scores, and equipment must demonstrate suitable vessels, instruments, contingency capacity and readiness for the Baltic Sea conditions.

    Competition with qualification
    Dec 14, 2026(22 days)
    €12,000,000