Subsea Inspection
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Apr 26,Expired
- Award
- ROV Specification, weight 9.09 and 5 more
Brief
EnBW Energie Baden-Württemberg AG has entered into a framework agreement with RS DIVING Contractor GmbH for the delivery of subsea inspection services for offshore wind farms in the Baltic Sea and North Sea, with a maximum total estimated value of 6 million EUR. The services include visual and functional inspections of underwater support structures of wind turbine generators and offshore substations, to be performed between April and September. The contractor is responsible for the full organization of the offshore campaign, including providing a suitable DP2 vessel, logistics, crew transfers, and ROV inspection equipment. Personnel must have valid offshore wind certifications and documented experience in subsea inspections. Specific requirements include the suitability of the proposed ROV(s) for various environmental conditions and tasks such as General Visual Inspection (GVI), Close Visual Inspection (CVI), Ultrasonic Wall Thickness Measurement (UT), Marine Growth (MG) Measurement, Cathodic Protection (CP) Potential Measurement, and MG Cleaning. The project also requires robust project management, including document management, progress monitoring, and post-execution quality reporting. Seven bids were received for this contract.
Fergetransport
Result
- RS DIVING CONTRACTOR GmbHWinner
- 7Number of tenders received
- Not statedContract value
- Maximum framework agreement valueUp to -€1
Previous winners
Who are you up against?
The suppliers who have won similar contracts at EnBW Energie Baden-Württemberg AG
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Contract deviations
Source
No source found in the documents. Check the weight against the tender documents.
Description
Suitability of proposed ROV(s): - Appropriate ROV type/classification - ROV weight (kg)/dimensions (m) - ROV thruster speed suitable for currents - ROV justified and demonstrates experience in executing similar work - ROV capable of performing in a variety of environmental conditions - Operational limits are reasonable (e.g. for L&R) - Max ROV payload suitable for carrying required tooling
Source
No source found in the documents. Check the weight against the tender documents.
Description
Suitability of proposed methods and tooling to perform scope of work: - General Visual Inspection (GVI) - Close Visual Inspection (CVI) - Ultrasonic Wall Thickness Measurement (UT) - Marine Growth (MG) Measurement - Cathodic Protection (CP) Potential Measurement - Reference-based Measurement of Cable Protection System (CPS) and Scour - MG Cleaning to CSWIP Grade SA 2½
Source
No source found in the documents. Check the weight against the tender documents.
Description
Capabilities beyond scheduled works: - Subject Matter Expert (e.g. CP) - Continuous improvement of inspection execution - Additional inspection methods (e.g. 3D anode scanning) - Custom inspection solutions to address unexpected requirements
Source
No source found in the documents. Check the weight against the tender documents.
Description
Review of provided personnel qualifications: - Organigrams, CVs and competency matrices for key roles - Verification of personnel information (e.g. required qualifications and training records)
Source
No source found in the documents. Check the weight against the tender documents.
Description
Review of provided project management qualifications: - Document management system - Monitoring of progress during mobilisation and execution - Post-execution quality and reporting - Strong evidence of experience through submission of supporting documentation (e.g. RAMS or inspection reports) - Suitable management system in place for provision of any critical tooling, equipment and materials - Robust back-office team to support offshore delivery team - Where subcontracted, clear selection process for subcontractors - Where subcontracted, clear management process for subcontractors
Source
No source found in the documents. Check the weight against the tender documents.
Description
Total Cost of Ownership
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.
Contact
g.madeddu@enbw.com- Result · Framework agreement · PrequalificationType
- 63726620Main codeROV services
- 71730000Industrial inspection services76521000Offshore installation services79961320Underwater photography services