Sultartangi Power Station - Enlargement of the headrace tunnel cross-section
Expired
The competition has expired without a winner being announced.
- Deadline
- Mar 3Expired
- Procedure
- OpenSingle stage
- Agreement
- Construction workuntil Dec 2026
Brief
Landsvirkjun þarf að láta stækka þversnið aðrennslisganga Sultartangavirkjunar. Verkefnið felur í sér að lækka botn ganganna um 4,5 metra undir núverandi hæð, en heildarlengd ganganna er um 3,4 km. Áætlað magn jarðvinnu er um 124.000 rúmmetrar af bergi.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Landsvirkjun
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
It is proposed to carry out an enlargement of the headrace tunnel cross-section at the Sultartangi Power Station. The project area is located at an elevation of approximately 260–280 m a.s.l., within a designated industrial area. The headrace tunnel is approximately 3.4 km in length. The existing tunnel has an elliptical crosssection with an approximate area of 152 m². The proposed enlargement involves lowering the tunnel invert by 4.5 m below the existing level. The estimated excavation volume is approximately 124,000 m³ measured in solid rock (in situ).
Contact
Procurement departmentinnkaup@landsvirkjun.com- CompetitionType
- LandsbyggðLocation
- 45221240Main codeConstruction work for tunnels