Find

  • All tenders
All tenders: Iceland/Landsvirkjun/Sultartangi Power Station - Enlargement of the headrace tunnel cross-section

Sultartangi Power Station - Enlargement of the headrace tunnel cross-section

Expired

The competition has expired without a winner being announced.

Deadline
Mar 3Expired
Procedure
OpenSingle stage
Agreement
Construction workuntil Dec 2026

Brief

Landsvirkjun þarf að láta stækka þversnið aðrennslisganga Sultartangavirkjunar. Verkefnið felur í sér að lækka botn ganganna um 4,5 metra undir núverandi hæð, en heildarlengd ganganna er um 3,4 km. Áætlað magn jarðvinnu er um 124.000 rúmmetrar af bergi.

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Landsvirkjun

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • It is proposed to carry out an enlargement of the headrace tunnel cross-section at the Sultartangi Power Station. The project area is located at an elevation of approximately 260–280 m a.s.l., within a designated industrial area. The headrace tunnel is approximately 3.4 km in length. The existing tunnel has an elliptical cross­section with an approximate area of 152 m². The proposed enlargement involves lowering the tunnel invert by 4.5 m below the existing level. The estimated excavation volume is approximately 124,000 m³ measured in solid rock (in situ).

  • Contact

    Procurement departmentinnkaup@landsvirkjun.com
  • Type
    Competition
  • Location
    Landsbyggð
  • Main code
    Construction work for tunnels
    45221240

Similar active competitions

  • Orkubú Vestfjarða ohf.

    2026-06 Kvíslatunguvirkjun - Kvíslatunga Hydropower Plant – Civil and Structural Works

    Orkubú Vestfjarða ohf. needs civil and structural works for the Kvíslatunga Hydropower Plant in Iceland’s Westfjords. The project includes access roads and tracks, dams, water diversion and intake structures, excavation, rock support and grouting, installation of approximately 2,950 metres of penstock, construction of the powerhouse and transformer shelter, tailrace works, and associated drainage, piping and earthing systems.

    Competition
    Jan 21, 2027(53 days)
  • Landsvirkjun

    HVM10 - Civil Works

    Landsvirkjun needs civil works for the construction of the Núpur dam, including gated spillway structures with bridges, fishways, headrace canal, intake, earthwork and foundations for penstocks, powerhouse, tailrace access tunnel, tailrace surge basin, tailrace tunnel, tailrace canal, Ölmóðsey dam, access roads, permanent water supply and relevant mechanical and electrical systems in buildings and the project area, including piping, cables and routes. The project also includes various site installations to be used by other contracts. The project location is in rural Iceland.

    Competition
    Apr 20, 2027(100+ days)
  • Landsvirkjun

    Plumbing and Sanitary Work

    Main Inlet Valves at Burfell Power Station

    Landsvirkjun seeks a supplier to design, manufacture, supply, install and commission the rehabilitation and upgrade of six main inlet butterfly valves at the Búrfell 1 hydropower plant in Iceland. The work is intended to ensure reliable, leak-free operation and optimal efficiency across the plant’s six turbine units.

    Competition with qualification
    Dec 9, 2026(10 days)