Brief
Municipality of Nikšić has entered into an agreement with Consortium Hydrophil GmbH/IRD Engineering SrL/Hydrophil D.O.O. for the supervision of works for the improvement of the water supply system in the Old Royal Capital Cetinje, Montenegro. The services will be delivered over 52 months and include supervision of the construction of approximately 92 km of transmission and distribution mains, a new reservoir and booster station, and the reconstruction of existing water supply networks, a transmission main, a pumping station, and a breaking chamber. The supervision must comply with Montenegrin legislation and relevant EU requirements, particularly regarding licensing and permits under the Law on Construction of Structures.
Building technical consultancy
Result
- Consortium Hydrophil GmbH/IRD Engineering SrL/Hydrophil D.O.O.Winner
- 0Number of tenders received
- Not statedContract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Municipality of Nikšić
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Price is not the only award criterion. All criteria are stated only in the procurement documents.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
Indicative scope of Works on the project “Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro” includes the following elements: • Construction of transmission and distribution mains of diameter DN32 to DN400, with approximate length of 92 km (to be implemented within 5 phases), incl. including house connections and installation of flow meters • Construction of the new reservoir Sandin vrh 1 and booster station Sandin vrh 2 (6th phase) • Reconstruction of the existing water supply network • Reconstruction of the transmission main from BC Lašor to the reservoir Zagrablje • Reconstruction of the pumping station Višnjica and the breaking chamber Velja Gora Works will be implemented according to FIDIC Red Book (1999 ed). The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.Main features of the procedureScope of procurement is provision of supervision of Works which will be executed under the FIDIC Conditions of Contract for Construction (Red Book) edition 1999 Fee based Contract for "Supervision Services for Construction Works". The scope of the Works to be supervised includes construction and reconstruction of a water supply network, construction of the new reservoir Sandin vrh 1 and booster station Sandin vrh 2, as well as reconstruction of the pumping station Višnjica and the breaking chamber Velja Gora. The contract shall be procured based on the templates of the PRAG PRAG (ePRAG EXACT External Wiki EN EC Public Wiki (europa.eu) and provision of the EIB Guide to Procurement (EIB GtP): https://www.eib.org/en/publications/20240132guidetoprocurementforprojectsfinancedbytheeib.
- Result · PrequalificationType
- 71311000Main codeCivil engineering consultancy services