Supply and installation of Wayfinding and Interpretation Hardware for two locations (i) the Royal Canal Greenway animation and (ii) the Shannon and ShannonErne
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Mar 10,Expired
- Award
Brief
Waterways Ireland_225 has entered into a multi-party framework agreement with Leach Colour Ltd, Kent Stainless, and Wayfinders for the supply and installation of wayfinding signage and interpretation hardware on waterways across the island of Ireland. The framework agreement has a maximum duration of 4 years and an estimated total maximum value of 4,000,000 EUR. An initial contract under this framework covers the supply and installation of equipment for the Royal Canal, required by October 2025, and the Shannon and Shannon-Erne waterways, required by November 2025.
Skilt og tilbehør
Result
- Kent StainlessWinner
- Leach Colour LtdWinner
- WayfindersWinner
- 5Number of tenders received
- Not statedContract value
- Maximum framework agreement valueUp to €4,000,000
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Atlantic Technological University
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Quality and Cost
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The Contracting Authority invites tenders for the establishment of a multi-party framework agreement with suitably qualified service providers for the provision and installation of interpretation hardware and wayfinding signage on waterways on the island of Ireland. This competition relates to the establishment of a multi-party framework with up to three (3) Economic Operators. The term of the framework agreement will be for a maximum period of four (4) years. The Contracting Authority will award an initial contract from the framework agreement for the supply and installation of wayfinding signage and interpretation hardware on the Royal Canal and on the Shannon and Shannon Erne waterways. The initial contract covers the supply and installation of equipment at both waterway locations and tenderers must demonstrate their capacity and ability to deliver the services within the timeframes set out below: - 1. Royal Canal supply and installation required by October 2025 2. Shannon / Shannon-Erne supply and installation required by November 2025 The Contracting Authority intend to award similar contracts for other waterways during the term of the framework agreement. This will be subject to funding being available. There is no guarantee of additional contracts, but where they arise, the Contracting Authority will consult the members of the framework agreement in accordance with the rules of operation outlined in this Request for Tender.
Contact
procurement@waterwaysireland.org- Result · Framework agreementType
- South-WestLocation
- 34928470Main codeSignage
- 34928471Sign materials34928472Sign posts34992000Signs and illuminated signs44423400Signs and related items79822500Graphic design services92310000Artistic and literary creation and interpretation services92312000Artistic services