Find

  • All tenders
Spain: Tenders/The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')/Supply of the Electron Cyclotron Upper Launchers and Ex-Vessel Waveguides of ITER

Supply of the Electron Cyclotron Upper Launchers and Ex-Vessel Waveguides of ITER

Agreement
Buying goods

Brief

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') in Spain has modified a contract with ALSYMEX SAS and IDOM Consulting, Engineering and Architecture S.A.U for the supply of Electron Cyclotron Upper Launchers and ex-vessel waveguides of ITER. This involves the design finalisation, raw material procurement, manufacturing, assembly, testing, and delivery of four EC upper launcher plug systems and the ex-vessel waveguide assembly for the same four upper launchers, plus the ex-vessel waveguides assembly of the equatorial launcher of port EW14. The components for port UL16 are designated as first plasma components.

Result

TED
  • ALSYMEX SAS
    Winner
  • IDOM Consulting, Engineering and Architecture S.A.U
    Winner
  • Number of tenders received
    0
  • Contract value
    Not stated

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • This procurement procedure is for the award of a framework contract (FWC) for the design finalisation and supply of the Electron Cyclotron (EC) Upper Launchers and ex-vessel waveguides of ITER. The Electron Cyclotron Upper Launchers and ex-vessel waveguides comprise the four EC upper launcher plug systems including the structures and shields, mirrors, waveguides, feedthroughs and services of ports UL12, UL13, UL15 and UL16 and the ex-vessel waveguide assembly including mm-wave transmission elements, windows and valves, supporting structures and services of the same four upper launchers plus the ex-vessel waveguides assembly of the equatorial launcher of the port EW14. The electron cyclotron upper launchers and ex-vessel waveguides of port UL16 are first plasma components. The scope of the FWC will be implemented through the award of specific contracts under the FWC for the manufacturing design, raw material procurement, manufacture, assembly, testing and delivery of the port plug structure, the blanket shield module, mirrors 1 and 2 and ancillaries and the final and manufacturing design, raw material procurement, manufacturing, testing and delivery of the mirrors 3 and 4, in-vessel waveguides and closure plate subplate of the port plug system and the ex-vessel waveguides system.

  • Contact

    Valerie CasarinValerie.Casarin@f4e.europa.eu
  • Type
    Result
  • Main code
    Industrial machinery
    42000000
  • 31711422Microwave equipment

Similar active competitions

  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    On site support activities and supply of Test Coils

    Fusion for Energy needs a framework contract for 8 years covering on-site support for ITER magnets—including preservation, preventive maintenance, cold testing and assembly—and the manufacture of test coils. The procurement is for supplies, with on-site work at ITER; the notice does not specify a contract value or award criteria.

    Framework agreement with qualification
    Nov 30, 2026(5 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of Nuclear Safety I&C Consultancy, Design and Qualification Services

    Fusion for Energy is planning a framework contract for nuclear-safety instrumentation and control engineering services, including technical specifications, contract follow-up and system acceptance, I&C consultancy, safety-system design, and related tools or services. Suppliers with relevant I&C engineering expertise can contribute to the procurement’s planning phase; the notice does not specify a feedback method. Amentum Clean Energy France SAS (formerly Jacobs Clean Energy France SAS) has held the existing contract.

    Planning
    Dec 11, 2026(16 days)
  • The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

    Brann- og sikkerhetstjenester

    Integration of the JT-60SA Actively Cooled Divertor

    The European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) needs services and hardware to integrate the actively cooled divertor for the JT-60SA facility under a 43-month contract. Services include storage, assembly, welding, installation and inspection of divertor and diagnostic components; hardware includes Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components and main water pipe caps. The award criteria are technical quality (60%) and price (40%).

    Competition with qualification
    Nov 30, 2026(5 days)