Czechia: Tenders/Univerzita Karlova/SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS

SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS

Expired

The competition has expired without a winner being announced.

Deadline
Nov 9,Expired
Award
Technical Quality of the Proposed Solution, weight 20
Procedure
OpenSingle stage
Agreement
Buying goods
Estimated value
CZK 9.8Mover 11 months

Brief

Univerzita Karlova needs the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services for the SYNERGYS Project involving deep geothermal drilling, with a maximum total value of 9.8 million CZK over 11 months. The project location is Ústecký kraj. The award criteria are bid price (80%) and technical quality of the proposed solution (20%).

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Univerzita Karlova

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    The bid price excluding VAT in accordance with Section 10 and Part 8 of the Tender Documentation

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Technical Quality of the Proposed Solution

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.

  • Contact

    administrace@krutakpartners.cz
  • Type
    Competition
  • Location
    Ústecký kraj
  • Main code
    Wellheads
    43612400
  • 43130000Drilling equipment43612000Parts of well-extraction machinery43612700Wellhead equipment

Similar active competitions

  • Univerzita Karlova

    SYNERGYS PROJECT: MUD LOGGING

    Univerzita Karlova, Faculty of Pharmacy in Hradec Králové, needs mud logging services for deep geothermal well drilling under the SYNERGYS Project in the Ústecký Region, Czechia. The 150-day contract has a maximum total value of CZK 7.6 million and covers equipment and monitoring-device mobilisation and installation, setup and testing of data visualisation and transfer networks, crew mobilisation and demobilisation, standard mud logging during drilling, and delivery of data and reports. Bids are evaluated on price (80%) and project-team quality (20%).

    Competition
    Dec 8, 2026(15 days)
    CZK 7,600,000
  • Česká geologická služba

    and 1 other
    Kartlegging og geospatiale tjenester

    „Opakování - Realizace vrtů pro systémy BTES2 a BTES3 projektu SYNERGYS a vrtů BTES3-U4H projektu USES4HEAT“

    Česká geologická služba poptává realizaci mělkých geotermálních vrtů a související infrastruktury v areálu výzkumné infrastruktury RINGEN v Litoměřicích. Základní rozsah tvoří 108 vrtů do projektované hloubky 100 m (42 pro pole BTES2 a 66 pro BTES3); za stanovených podmínek lze rozsah rozšířit o dalších 30 vrtů pro BTES3-U4H. Vrty mají být napojeny na samostatné sběrné systémy a centrální řídicí systém. Plnění má být dokončeno do 150 dnů, maximální celková hodnota zakázky je 35 milionů Kč. Nabídky se hodnotí podle ceny (75 %) a kvality a zkušeností tří konkrétních členů realizačního týmu (25 %).

    Competition
    Dec 16, 2026(23 days)
    CZK 35,000,000
  • Geofyzikální ústav AV ČR, v. v. i.

    Laboratorie- og analyseutstyr

    Sada systému DTS pro teplotní monitoring optickými vlákny

    Geofyzikální ústav AV ČR, v. v. i., pořizuje sadu čtyř jednotek (interogátorů) pro měření teploty optickými vlákny pomocí systému DTS (Distributed Temperature Sensing), s dodáním během 4 měsíců do Ústeckého kraje a maximální celkovou hodnotou 6 milionů Kč. Technické požadavky a podmínky plnění jsou stanoveny v zadávací dokumentaci; nabídky se hodnotí výhradně podle nejnižší nabídkové ceny bez DPH (100 %).

    Competition
    Dec 14, 2026(21 days)
    CZK 6,000,000