Find

  • All tenders
Ireland: Tenders/Technological University of the Shannon: Midlands Midwest (TUSMM)/The Establishment of TUS Multi-Operator Framework Agreements for Electrical Works Contractors

The Establishment of TUS Multi-Operator Framework Agreements for Electrical Works Contractors

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
Jun 2,Expired
Award
Procedure
With prequalificationTwo stages
Agreement
Framework agreement
Estimated value
€12Mover 4 years

Brief

Technological University of the Shannon: Midlands Midwest (TUSMM) has entered into a multi-operator framework agreement with HandF Electrical Contractors Ltd., Tim Kelly Group, Kenneth Keane Electrical Ltd, Sensori Facilities Management Limited, John Fletcher Ltd, Tiernan Engineering Ltd., and King and Moffatt Group for the delivery of electrical works contractors in TUS Midlands and TUS Midwest, Ireland. The agreement has a duration of 4 years and a maximum total value of 12 million EUR. The services are divided into two lots, each with an estimated value between 200,000 EUR and 2 million EUR. Technical capability criteria, including qualifications of managerial and personnel, a list of previous works carried out, average annual number of persons employed, and health and safety, were required. 11 bids were received.

Elektrisk infrastruktur og veibelysning

Result

TED
  • HandF Electrical Contractors Ltd.
    Winner
  • John Fletcher Ltd
    Winner
  • Kenneth Keane Electrical Ltd
    Winner
  • King and Moffatt Group
    Winner
  • Sensori Facilities Management Limited
    Winner
  • Number of tenders received
    11
  • Contract value
    Not stated
  • Maximum framework agreement valueUp to €12,000,000

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Technological University of the Shannon: Midlands Midwest (TUSMM)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Qualifications Managerial and Personnel, List of previous works carried out, Average Annual Number of persons employed, Health and Safety.

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • TUS is seeking to establish two Multi-Operator Framework Agreements (MOFAs) with suitable electrical works contractors. The procurement process is structured in two Lots. Each Lot is a standalone competition where up to 6 single applicants will be selected and appointed. The purpose of these multi-operator framework agreements is to establish a structured and efficient mechanism through which TUS can procure and deliver a range of General electrical Works projects/ contracts over a four-year period from the commencement date of each framework. Lot 1 - Multi Operator Framework Agreements of Electrical Works Contractors for Electrical Works in TUS Midlands €200,000 – €2 million. Lot 2 - Multi Operator Framework Agreements of Electrical Works Contractors for Electrical Works in TUS Midwest €200,000 – €2 million.

  • Contact

    barry.coleman@tus.ie
  • Type
    Result · Framework agreement · Prequalification
  • Location
    Mid-West
  • Main code
    Electrical installation work
    45310000
  • 44111530Electrical insulating fittings45311000Electrical wiring and fitting work45311200Electrical fitting work45315000Electrical installation work of heating and other electrical building-equipment45315100Electrical engineering installation works45317000Other electrical installation work45317100Electrical installation work of pumping equipment45317200Electrical installation work of transformers45317300Electrical installation work of electrical distribution apparatus45317400Electrical installation work of filtration equipment50710000Repair and maintenance services of electrical and mechanical building installations65320000Operation of electrical installations

Similar active competitions

  • Technological University of the Shannon: Midlands Midwest (TUSMM)

    Renholdstjenester, drift og vedlikehold

    Single Supplier Framework for the Provision of Caretaker Services to TUS Midwest

    Technological University of the Shannon: Midlands Midwest (TUSMM) needs call-out caretaker services for its Midwest campuses through a single-supplier framework agreement lasting 3 years, with a maximum total value of €1.1 million. Services will be provided as needed across the campuses in the Midlands and are intended to cover caretaker positions temporarily while TUS recruits permanent staff through open competition.

    Framework agreement
    Dec 3, 2026(11 days)
    €1,100,000
  • Technological University of the Shannon: Midlands Midwest (TUSMM)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    Single Supplier Framework Agreement for Building Management System (BMS) Servicing and Maintenance at TUS Midlands Campus, Athlone (Re-Tender)

    Technological University of the Shannon: Midlands Midwest (TUSMM) needs servicing and maintenance of the Building Management System at its Athlone campus through a single-supplier framework agreement lasting 5 years, with a maximum total value of €450,000. The work covers controllers, operator interfaces and graphics, control panels and motor control centres, outstations, sensors, actuators and associated components, as well as minor BMS-related works valued up to €50,000 excluding VAT. Delivery is limited to the TUS Midlands Campus in Athlone, Ireland.

    Framework agreement
    Dec 8, 2026(16 days)
    €450,000
  • City of Dublin Education and Training Board

    Elektrisk infrastruktur og veibelysning

    Ballyfermot FET College South Campus – Emergency Electrical Upgrade and Fire Improvement Works - Phase 1

    City of Dublin Education and Training Board requires emergency electrical upgrade and fire improvement works at the operational Ballyfermot Further Education College South Campus in Dublin, under a 2-year contract with a maximum total value of €3 million. The works include phased electrical strip-out and rewiring; replacement of electrical distribution, lighting, fire alarms, ICT and Wi-Fi infrastructure, CCTV, access control and lightning protection; and fire compartmentation, fire stopping, fire doors and associated builders’ work, testing, commissioning, certification and reinstatement of finishes. Delivery must be phased to keep the College operating while maintaining life-safety systems, emergency routes and essential services.

    Competition
    Nov 27, 2026(5 days)
    €3,000,000