Find

  • All tenders
All tenders: Ireland/Electricity Supply Board ( ESB )/TR2929, Electrical Balance of Plant (EBOP) of Long Duration Energy Storage (LDES) Technology in the Republic of Ireland and Northern Ireland.

TR2929, Electrical Balance of Plant (EBOP) of Long Duration Energy Storage (LDES) Technology in the Republic of Ireland and Northern Ireland.

Deadline
Jan 13, 2028410 days left
Award
Agreement
Construction work

Brief

Typically, the scope of work for this procurement process shall include the design, procurement, installation and commissioning of the following non-exhaustive list, however tenderers should note that the detailed scope for each project will be determined at the Request for Tender (RfT) stage: A.1.1.2 Civil Scope: Additionally, the Contracting Entity may also procure civil works as part of this procurement process as may be required on a project-by-project basis and will be confirmed at Request for Tender (RfT) stage. The scope of work from this may include some or all of the design, procurement and installation of the following;

Electrical Infrastructure and Road Lighting

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    As outlined in the QSQ document

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Typically, the scope of work for this procurement process shall include the design, procurement, installation and commissioning of the following non-exhaustive list, however tenderers should note that the detailed scope for each project will be determined at the Request for Tender (RfT) stage: A.1.1.2 Civil Scope: Additionally, the Contracting Entity may also procure civil works as part of this procurement process as may be required on a project-by-project basis and will be confirmed at Request for Tender (RfT) stage. The scope of work from this may include some or all of the design, procurement and installation of the following;

  • Contact

    mary.carroll@esb.ie
  • Type
    Competition
  • Location
    Dublin
  • Main code
    Construction work for power plant
    45251100
  • 51100000Installation services of electrical and mechanical equipment

Similar active competitions

  • Electricity Supply Board ( ESB )

    Consulting Engineering Services for Construction and Civil Engineering

    TR2928 Supply andCommissioning of Long Duration Energy Storage System(s) on the Island of Ireland

    A.1.1 General Description of the Proposed Contract The Contracting Entity intends to procure a contract for the Supply and Commissioning of Long Duration Energy Storage Systems at a number of project sites in the Republic of Ireland and Northern Ireland. The scope includes the design, integration, supply, delivery to site and commissioning of lithium-ion battery energy storage systems and may also be extended to include aspects of installation/construction works, civil works, electrical works, etc. as may be required by the Contracting Entity and for which such extension of scope would be confirmed at Request for Tender RfT stage. It may also include the provision of suitable supervision of the installation of these systems by a third party, the provision of appropriate product and performance warranties and provision of an appropriate Long Term Service Agreement LTSA for each project.

    Qualification system
    Jan 14, 2028(100+ days)
  • Electricity Supply Board ( ESB )

    Electrical installation in buildings

    TR1295 Solar Photovoltaic Panel and Energy Storage Devices

    The provision of works, goods and services associated with the sales, design, installation, supply of Solar Panels, Batteries and associated technologies in the Republic of Ireland.

    Qualification system
    Oct 15, 2027(100+ days)
  • Electricity Supply Board ( ESB )

    TR1675- QSQ for The Supply and Installation of Open Cycle Gas Turbine Packages within the Island of Ireland

    TR1675- QSQ for The Supply and Installation of Open Cycle Gas Turbine Packages within the Island of Ireland

    Qualification system
    Jun 13, 2027(100+ days)