Ireland: Tenders/Tory Island Group Water Scheme/Upgrade of Tory GWS

Upgrade of Tory GWS

Awarded

The competition has ended and a winner has been selected.

Award
Price, weight 30
Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€500Kover 4 years

Brief

Tory Island Group Water Scheme has entered into an agreement with Stantec_Ireland_63567 for the delivery of engineering services in Border, Ireland, over a period of 48 months, with a final contract value of 601,739 EUR. The services include the design of a disinfection system and upgrade of a slow sand filter, including ancillary pipework, civil and hydraulic design, process engineering, environmental/ecological evaluations, preparation of construction tender documents, administration of the tender process, and management of the construction contract. The service provider will also act as PSDP for the project. One bid was received for this contract.

Prosjekteringstjenester

Result

TED
  • Stantec_Ireland_63567
    Winner
  • Number of tenders received
    1
  • Contract value
    €601,739

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Tory Island Group Water Scheme

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Quality

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Price

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • Tory Group Water Scheme (GWS) wishes to appoint an Engineering Services Provider (ESP) using the standard conditions of engagement COE1 for the design of a disinfection system and upgrade of slow sand filter including ancillary pipework required to install any treatment processes to achieve compliance with the European Drinking Water Standards. The service is to include for all Civil and Hydraulic Design, process engineering services as required; any environmental / ecological evaluations required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.

  • Contact

    ccthorai@gmail.com
  • Type
    Result
  • Location
    Border
  • Main code
    Engineering design services
    71320000
  • 71322000Engineering design services for the construction of civil engineering works71800000Consulting services for water-supply and waste consultancy

Similar active competitions

  • Tooreen Aghamore GWS

    Rørlegger- og sanitærarbeid

    Tooreen Aghamore Group Water Supply Scheme - Water Meter Upgrade and Network Improvement Works Phase 2

    Tooreen Aghamore GWS needs water network improvement works in Ireland’s Western Region over 6 months, with a maximum contract value of €500,000. The works comprise replacing and installing water distribution pipelines, consumer water meters and bulk flow meters, including data loggers. The contract will be awarded to the most economically advantageous tender based on quality and price.

    Competition
    Dec 11, 2026(18 days)
    €500,000
  • Cork County Council

    Arkitekttjenester

    Single Service Provider, Engineering Led Multi-Disciplinary Design Team - Stages (iic - v) for Cobh Public Realm Regeneration Phase 1

    Cork County Council seeks an engineering-led multidisciplinary design team, acting as PSDP and Employer’s Representative, to complete the design, procurement and construction stages (Stages iic–v) of the Cobh Public Realm Regeneration Phase 1 project in South-West Ireland. The services contract runs for 52 months and has a maximum total value of €700,000.

    Competition
    Dec 11, 2026(18 days)
    €700,000
  • Associaçao Regantes e Beneficiários do Vale do Lis

    Rådgivende ingeniørtjenester for bygg og anlegg

    Projeto de execução dos Blocos de Rega da Barosa, Ruivaqueira e Vale da Marinha

    A Associação de Regantes e Beneficiários do Vale do Lis precisa da elaboração de um estudo prévio e do projeto de execução dos blocos de rega da Barosa, Ruivaqueira e Vale da Marinha, na região de Leiria, por um prazo de 270 dias e com valor máximo total de 445 mil euros. O projeto abrange duas estações elevatórias — uma também destinada à drenagem —, sistemas de filtração, três açudes, duas redes de rega sob pressão, com áreas de 369 e 373 hectares, e uma rede gravítica de 5 hectares. As propostas serão avaliadas pela qualidade (50%) e pelo preço (50%).

    Competition
    Dec 6, 2026(13 days)
    €445,000