Wastewater Management System Improvement in the Municipality of Mojkovac
Awarded
The competition has ended and a winner has been selected.
- Deadline
- Jan 11,Expired
- Procedure
- OpenSingle stage
- Agreement
- Construction workover 3 years
Brief
The Municipality of Mojkovac has entered into an agreement with Arikan Insaat Taahhut Ticaret ve Sanayi Anonim Sirketi (JV Leader) and Karkanias Environmental Technology S.A. (JV Member) for the Wastewater Management System Improvement in the Municipality of Mojkovac, Montenegro. The project involves the construction of a sewerage network, including the separation of wastewater and storm water networks in the city center (2,060 m) and the construction of new networks in settlements Ambarine, Juškovića potok, and Podbišće (7.99 km), serving 2,500 inhabitants. Additionally, the contract includes the rehabilitation and upgrade of the wastewater treatment plant (WWTP) to a Phase 1 capacity of 5,250 PE, with an ultimate capacity of 7,300 PE, increasing effluent capacity from 580 m³/d to 1,178 m³/d. The contract duration is 36 months, comprising 24 months for completion and a 12-month Defects Notification Period, with a total value of 5,807,732 €. The works are to be implemented according to FIDIC Red Book (1999 ed), including lump sum design-build activities for the WWTP, and in compliance with Montenegrin legislation and relevant EU and EIB requirements, particularly regarding licensing and permits under the Law on Spatial Planning and Construction of Structures. One bid was received for this contract.
Oppføring av bygninger
Result
- Arikan Insaat Taahhut Ticaret ve Sanayi Anonim Sirketi (JV Leader)Winner
- Karkanias Environmental Technology S.A. (JV Member)Winner
- 1Number of tenders received
- €5,807,732Contract value
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Municipality of Nikšić
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Indicative scope of Works on the project “Wastewater Management System Improvement in the Municipality of Mojkovac” includes the following elements: - Section 1: Construction of sewerage network, separation of wastewater and storm water network in the city centre and construction of new network, which will serve to 2,500 inhabitants. - Section 2: Rehabilitation of wastewater treatment plant Rehabilitated and upgraded WWTP in proper operation. The WWTP shall be designed for two Phases, with an ultimate capacity being 7,300 PE and Phase 1 as 5,250 PE. Rehabilitation Works will cover Phase 1 (5,250 PE). Works will be implemented according to FIDIC Red Book (1999 ed) including lump sum design-build activities for WWTP. Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU and EIB requirements. The Contractor must particularly consider licensing and permits requirements in the Law on Spatial Planning and Construction of Structures in Montenegro in force.Main features of the procedureThe indicative scope of Works covers the construction of sewerage network consisting of the following elements: Section 1: Sewerage network - Separation of storm water and sewerage networks in the city centre in city centre for a length of 2,060 m - Construction of sewerage network in settlements Ambarine, Juškovića potok and Podbišće in total length of 7.99 km Section 2: Rehabilitation of wastewater treatment plant Rehabilitated and upgraded WWTP in proper operation. The WWTP shall be designed for two Phases, with an ultimate capacity being 7,300 PE and Phase 1 as 5,250 PE. The effluent capacity will be increased from 580 m³/d to 1,178 m³/d. Rehabilitation works will cover phase I (5250 PE). Among others, the following process units will be rehabilitated and renewed electrically and mechanically: • Fine screens and grit/grease chamber • Pre-denitrification tank for nitrogen reduction • Bio-aeration tank • Final sedimentation tank • Outlet structure with flow, dissolved oxygen and pH monitoring of treated effluent. Total expected contract duration is 36 months, i.e. 24 months’ will be Time for Completion, which will be followed by 12 months of Defects Notification Period. The provisional commencement date is January 2026. The Municipality of Mojkovac conduct open international procedure for selection of contractor. The selection procedure is conducted through the procedure as specified in the practical guide for European Union external action (PRAG) and EIB Guide to Procurement (2024).
Contact
Ivana Medojevićivanamedojevic96@gmail.com- ResultType
- 45200000Main codeWorks for complete or part construction and civil engineering work