Wastewater Management System Improvement in the Municipality of Mojkovac

Awarded

The competition has ended and a winner has been selected.

Deadline
Jan 11,Expired
Procedure
OpenSingle stage
Agreement
Construction workover 3 years

Brief

The Municipality of Mojkovac has entered into an agreement with Arikan Insaat Taahhut Ticaret ve Sanayi Anonim Sirketi (JV Leader) and Karkanias Environmental Technology S.A. (JV Member) for the Wastewater Management System Improvement in the Municipality of Mojkovac, Montenegro. The project involves the construction of a sewerage network, including the separation of wastewater and storm water networks in the city center (2,060 m) and the construction of new networks in settlements Ambarine, Juškovića potok, and Podbišće (7.99 km), serving 2,500 inhabitants. Additionally, the contract includes the rehabilitation and upgrade of the wastewater treatment plant (WWTP) to a Phase 1 capacity of 5,250 PE, with an ultimate capacity of 7,300 PE, increasing effluent capacity from 580 m³/d to 1,178 m³/d. The contract duration is 36 months, comprising 24 months for completion and a 12-month Defects Notification Period, with a total value of 5,807,732 €. The works are to be implemented according to FIDIC Red Book (1999 ed), including lump sum design-build activities for the WWTP, and in compliance with Montenegrin legislation and relevant EU and EIB requirements, particularly regarding licensing and permits under the Law on Spatial Planning and Construction of Structures. One bid was received for this contract.

Oppføring av bygninger

Result

TED
  • Arikan Insaat Taahhut Ticaret ve Sanayi Anonim Sirketi (JV Leader)
    Winner
  • Karkanias Environmental Technology S.A. (JV Member)
    Winner
  • Number of tenders received
    1
  • Contract value
    €5,807,732

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Municipality of Nikšić

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • Indicative scope of Works on the project “Wastewater Management System Improvement in the Municipality of Mojkovac” includes the following elements: - Section 1: Construction of sewerage network, separation of wastewater and storm water network in the city centre and construction of new network, which will serve to 2,500 inhabitants. - Section 2: Rehabilitation of wastewater treatment plant Rehabilitated and upgraded WWTP in proper operation. The WWTP shall be designed for two Phases, with an ultimate capacity being 7,300 PE and Phase 1 as 5,250 PE. Rehabilitation Works will cover Phase 1 (5,250 PE). Works will be implemented according to FIDIC Red Book (1999 ed) including lump sum design-build activities for WWTP. Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU and EIB requirements. The Contractor must particularly consider licensing and permits requirements in the Law on Spatial Planning and Construction of Structures in Montenegro in force.Main features of the procedureThe indicative scope of Works covers the construction of sewerage network consisting of the following elements: Section 1: Sewerage network - Separation of storm water and sewerage networks in the city centre in city centre for a length of 2,060 m - Construction of sewerage network in settlements Ambarine, Juškovića potok and Podbišće in total length of 7.99 km Section 2: Rehabilitation of wastewater treatment plant Rehabilitated and upgraded WWTP in proper operation. The WWTP shall be designed for two Phases, with an ultimate capacity being 7,300 PE and Phase 1 as 5,250 PE. The effluent capacity will be increased from 580 m³/d to 1,178 m³/d. Rehabilitation works will cover phase I (5250 PE). Among others, the following process units will be rehabilitated and renewed electrically and mechanically: • Fine screens and grit/grease chamber • Pre-denitrification tank for nitrogen reduction • Bio-aeration tank • Final sedimentation tank • Outlet structure with flow, dissolved oxygen and pH monitoring of treated effluent. Total expected contract duration is 36 months, i.e. 24 months’ will be Time for Completion, which will be followed by 12 months of Defects Notification Period. The provisional commencement date is January 2026. The Municipality of Mojkovac conduct open international procedure for selection of contractor. The selection procedure is conducted through the procedure as specified in the practical guide for European Union external action (PRAG) and EIB Guide to Procurement (2024).

  • Contact

    Ivana Medojevićivanamedojevic96@gmail.com
  • Type
    Result
  • Main code
    Works for complete or part construction and civil engineering work
    45200000

Similar active competitions

  • Ministry of Education, Science and Innovation

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of design and supervision services for the reconstruction works of kindergarten in Zabjelo, Podgorica, Kotor and Momisici, Podgorica.

    Montenegro’s Ministry of Education, Science and Innovation needs design and construction-supervision consultancy services for the reconstruction of kindergartens in Zabjelo, Kotor and Momišići, Podgorica. The contract will run for 29 months and has a maximum total value of EUR 480,844. Quality accounts for 80% of the award score and price for 20%.

    Competition
    Dec 4, 2026(11 days)
    €480,844
  • Water Services Corporation

    Kjemikalier og vannbehandling

    WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

    Water Services Corporation needs the design, construction, testing and commissioning of an environmentally friendly upgrade to the Gozo Wastewater Treatment Plant, with a maximum total contract value of €25,795,000. The works will provide process and hydraulic resilience and ensure effective treatment of wastewater through at least 2040, upgrading capacity to treat an average of 14,000 cubic metres per day. The contract also includes designing, installing, testing and commissioning a new water reclamation plant to produce an additional 4,000 cubic metres of “New Water” per day. The project will be delivered in two phases under FIDIC conditions in Malta.

    Competition
    Feb 26, 2027(95 days)
    €25,795,000
  • State Unitary Enterprise Khojagii Manziliyu Kommunali of Fayzobod Region

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    Rehabilitation of the Water Supply and Wastewater System in Fayzobod region, Tajikistan

    State Unitary Enterprise Khojagii Manziliyu Kommunali of Fayzobod Region needs works for the rehabilitation of the water supply and wastewater system in Fayzobod region, Tajikistan. The contract covers the design and construction of new wastewater treatment facilities on the site of the existing plant in Fayzobod, including the demolition of existing structures, connection to external networks, the treated effluent outfall, and bank protection works to the Loyak River. The mandatory works provide a treatment capacity of 1,500 m³/day, with optional works, priced separately, to increase capacity to 3,000 m³/day. The award criteria are based on quality.

    Competition
    Nov 27, 2026(4 days)