Wood Dust extraction unit and Biomass Burner
Expired
The competition has expired without a winner being announced.
- Deadline
- Nov 21, 2025Expired
- Procedure
- OpenSingle stage
Brief
Red City Kitchens Ltd needs a wood dust extraction unit and a biomass burner for a total maximum value of 226,050 EUR over 3 months. The dust extraction unit should be a fabric filter unit with compressed air jet cleaning, a minimum 35Kw fan, 19 machine connections, and ductwork to EN12237:2004 standard, with an 8m3 storage chamber and an auger discharge to a boiler/skip. The biomass burner should be a minimum 300kw multi-fuel boiler capable of burning MDF and MFC wood waste, with 3-phase power as standard. Both items are to be priced separately, but the supplier must be able to provide both. The project includes transport, installation, and commissioning.
Industrimaskiner
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Red City Kitchens Ltd
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
There is 2 descrptions for dust extraction and Biomass burner . To be priced separatley but supplier must ensure they can supply both items Dust extraction : Fabric Filter Unit with compress air Jet cleaning System, comes with access doors and Explosion Panels as standard. Filter Unit Filtration Capacity – comes with a minimum 35Kw fan delivering 25 to 30m/s velocity. • Allow for 19 machine connections • All ductwork to EN12237:2004 Standard • Clip assembly Galvanised Steel ductwork • 2 separate extraction lines into building • Air speeds between 25m/s - 30m/s • 8m3 storage chamber • Pulse jet cleaning with compressed air • Negative pressure system • Filtered Air return to reduce thermal • Auger discharge to boiler / skip • Invertor driven system • Machine equipped with automatic shut offs • Various hoover points throughout ductwork • Hoover cleaning kits • Max height of main extraction unit = 7 meters • Transport, installation and commissioning Biomass Burner: To be priced separatley Allow for a minimum 300kw Biomass burner to burn MDF AND MFC wood waste. • Multi Fuel Boiler • 3 phase power as standard
Contact
redcitykitchens@gmail.com- CompetitionType
- DublinLocation
- 42310000Main codeFurnace burners
- 42511100Heat-exchange units42515000District heating boiler42522000Non-domestic fans42522100Parts of fans