Find

  • All tenders
All tenders: Ireland/St. Angela's Secondary School (Ballytruckle)/Works to Façade of St Joseph’s Building at St.Angela's Secondary School, Ursuline Convent, Waterford

Works to Façade of St Joseph’s Building at St.Angela's Secondary School, Ursuline Convent, Waterford

Expired

The competition has expired without a winner being announced.

Deadline
Jul 27Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€500Kover 5 months

Brief

St. Angela's Secondary School (Ballytruckle) in Ireland needs external refurbishment works to the façade of St Joseph’s Building, including the removal and replacement of defective render, rainwater goods, and window lintels. The project has a maximum total value of 500,000 EUR and a duration of 5 months. The contractor must carry out all works within a live school environment, ensuring minimal disruption to school activities.

Construction - Erection, Renovation and Maintenance of Buildings

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at St. Angela's Secondary School (Ballytruckle)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The project comprises external refurbishment works to the existing school building, including the careful removal and disposal of existing defective render to the front and side elevations. The works include preparation of the underlying substrate and the application of a new breathable lime render system in accordance with the project specifications. The works further include the removal and replacement of existing rainwater goods, including gutters, downpipes, brackets, fixings and associated fittings, together with all necessary making good works. The project also includes the removal and replacement of defective window lintels, including all necessary temporary support works, localised opening-up works, reinstatement, repairs and making good to adjoining finishes. The Contractor shall carry out all works within a live school environment and shall allow for all necessary protection, access equipment, scaffolding, temporary works, dust suppression, safety measures, hoarding and phasing required to safely complete the works with minimal disruption to school activities. The works shall include all ancillary and associated works necessary for the proper completion of the project.

  • Contact

    bmg@ursw.ie
  • Type
    Competition
  • Location
    South-East
  • Main code
    Construction work
    45000000
  • 45262690Refurbishment of run-down buildings45443000Facade work50700000Repair and maintenance services of building installations

Similar active competitions

  • Waterford and Wexford Education and Training Board_110494

    Consulting Engineering Services for Construction and Civil Engineering

    CASWS at Meánscoil San Nioclás

    Waterford and Wexford Education and Training Board needs consultancy services for the Climate Action Summer Works Scheme at Meánscoil San Nioclás in County Waterford, within the South-East region of Ireland. The services contract is expected to run for 18 months, with a maximum total value of €78,000.

    Competition
    Nov 27, 2026(0 days)
    €78,000
  • Waterford and Wexford Education and Training Board_110494

    Consulting Engineering Services for Construction and Civil Engineering

    CASWS at St Paul's Community College

    Waterford and Wexford Education and Training Board needs consultancy services for the Climate Action Summer Works Scheme at St Paul’s Community College in Waterford. The 18-month contract has a maximum total value of €210,000 and is focused on the South-East region.

    Competition
    Nov 27, 2026(0 days)
    €210,000
  • Bunscoil Rís Edmund Rice Senior Primary School

    Construction of buildings

    Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

    Bunscoil Rís Edmund Rice Senior Primary School needs construction works for a 12-month project with a maximum total contract value of €1.95 million. The project involves a two-storey extension to the existing school building in Ireland’s South-East region, with a special education needs unit on the ground floor, four special education teaching rooms on the first floor, and associated site and ancillary works.

    Competition
    Dec 3, 2026(5 days)
    €1,950,000