All tenders: Malta/Water Services Corporation/WSC/T/006/2026 - WORKS – CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA REVERSE OSMOSIS AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WATER SERVICES CORPORATION – PHASE 1 - TRIQ L–MGARR, MGARR

WSC/T/006/2026 - WORKS – CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA REVERSE OSMOSIS AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WATER SERVICES CORPORATION – PHASE 1 - TRIQ L–MGARR, MGARR

Awarded

The competition has ended and a winner has been selected.

Deadline
Jul 14Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€4M

Brief

Water Services Corporation has entered into an agreement with Green Building Solutions Ltd for works related to the consolidation of potable infrastructure between Cirkewwa Reverse Osmosis and Ta’ Qali Reservoir in Malta. The works involve laying pipes by open-cut trenches for potable water ductile iron mains (80mm, 100mm, 150mm, and 600mm) and wastewater ductile iron rising mains (200mm and 300mm), excluding the supply of pipes and fittings which will be provided by the Water Services Corporation. The contract has a final value of 3,350,625 EUR. Four bids were received for this contract.

Civil engineering and infrastructure construction

Result

TED
  • Green Building Solutions Ltd
    Winner
  • Number of tenders received
    4
  • Contract value
    €3,350,625

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Water Services Corporation

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The subject of this tender is the laying of pipes by open cut trenches as per tender documents and bill of quantities to cater for the continuous increase in demand of potable water in the Northern and Central regions of Malta inclusive, but not exclusive, of: Cirkewwa - Qali which includes from Triq San Pawl tal- Qliegha, Mosta to Triq Sir Temi Zammit, Mgarr – Open Cut Trenches o Potable Water Works  Installation of potable water ductile iron mains 80mm, 100mm, 150mm and 600mm exclusive of the supply of pipes and fittings. o Wastewater Works  Installation of wastewater ductile iron rising main 200mm and 300mm exclusive of the supply of pipes and fittings. All ductile iron mains and fittings, all polyethylene pipes and fittings and manhole covers and surface boxes are to be supplied by the Water Services Corporation.

  • Contact

    procurement@wsc.com.mt
  • Type
    Result
  • Location
    Malta
  • Main code
    Excavating and earthmoving work
    45112000
  • 44161000Pipelines45231300Construction work for water and sewage pipelines

Similar active competitions

  • Water Services Corporation

    Chemicals and Water Treatment

    WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

    Water Services Corporation needs the design, construction, testing and commissioning of an environmentally friendly upgrade to the Gozo Wastewater Treatment Plant, with a maximum total contract value of €25,795,000. The works will provide process and hydraulic resilience and ensure effective treatment of wastewater through at least 2040, upgrading capacity to treat an average of 14,000 cubic metres per day. The contract also includes designing, installing, testing and commissioning a new water reclamation plant to produce an additional 4,000 cubic metres of “New Water” per day. The project will be delivered in two phases under FIDIC conditions in Malta.

    Competition
    Feb 26, 2027(91 days)
    €25,795,000
  • Enemalta plc

    Construction - Groundwork, water and sewage

    TD/T/3982/2026 (17314) TRENCHING WORKS AND LAYING OF 33KV CABLES BETWEEN 132KV DC AND XEWKIJA DC, QALA DC AND NEW KERCEM AREA DC IN AN ENVIRONMENTALLY FRIENDLY MANNER

    Enemalta plc requires environmentally friendly trenching and the installation of 33 kV cables between the 132 kV Distribution Centre and Xewkija Distribution Centre, Qala Distribution Centre and the new Kercem area Distribution Centre in Malta. The works have a maximum total value of €7,059,058.01 and a duration of 21 weeks.

    Competition
    Dec 9, 2026(12 days)
    €7,059,058
  • Enemalta plc

    Construction - Groundwork, water and sewage

    TD/T/4307/PC3/2026 (16354) ESTABLISHMENT OF A DYNAMIC PURCHASING SYSTEM (DPS) FOR TRENCHING AND CABLE LAYING WORKS (2026 to 2029) FOR ENEMALTA PLC IN AN ENVIRONMENTALLY FRIENDLY MANNER

    Enemalta plc teħtieġ xogħlijiet ta' tħaffir ta' trunċieri u tqegħid ta' kejbils madwar Malta u Għawdex, b'valur massimu totali ta' 10,000,000 EUR. Ix-xogħlijiet jinkludu tħaffir ta' trunċieri għall-infrastruttura elettrika, tqegħid ta' kejbils u xogħlijiet ta' restawr assoċjati, kif ukoll kwalunkwe xogħlijiet ċivili anċillari relatati mat-tħaffir ta' trunċieri għan-netwerks tad-distribuzzjoni elettrika.

    Dynamic purchasing system
    May 29, 2029(100+ days)
    €10,000,000