Malta: Tenders/Water Services Corporation/WSC/T/059/2025 - WORKS - CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA RO AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WSC – MIZIEB VALLEY

WSC/T/059/2025 - WORKS - CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA RO AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WSC – MIZIEB VALLEY

Awarded

The competition has ended and a winner has been selected.

Deadline
5. nov. 2025Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€837.5K

Brief

The Water Services Corporation has entered into an agreement with Bonnici Bros Services Ltd for works related to the consolidation of potable infrastructure between Cirkewwa RO and Ta’ Qali Reservoir in Mizieb Valley, Malta. The works involve laying potable water ductile iron mains (100mm and 600mm) and non-potable water ductile iron mains (150mm), as well as installing PVC sleeve pipes, water dispenser concrete bases, and fibre optic manholes. The final contract value is 732,718 €. Three bids were received for this contract.

Anleggs- og infrastrukturbygging

Result

TED
  • Bonnici Bros Services Ltd
    Winner
  • Number of tenders received
    3
  • Contract value
    €732,718

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Water Services Corporation

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • The subject of this tender is the laying of pipes by open cut trenches as per tender documents and bill of quantities to cater for the continuous increase in demand of potable water in the Northern and Central regions of Malta inclusive, but not exclusive, of: Cirkewwa - Qali specifically Mizieb Valley – Open Cut Trenches o Potable Water Works  Installation of potable water ductile iron mains 100mm and 600mm exclusive of the supply of pipes and fittings. o Second Class Water (New Water Works)  In Installation of non-potable water ductile iron mains 150mm exclusive of the supply of pipes and fittings.  Supply and installation of 160mm non-corrugated PVC sleeve pipe with two 50mm non-corrugated HDPE pipes inside including pulling rope.  Installation of supplied water dispenser concrete bases and relative pipework below street level.  Installation of fibre optic manholes as required

  • Contact

    procurement@wsc.com.mt
  • Type
    Result
  • Location
    Malta
  • Main code
    Excavating and earthmoving work
    45112000
  • 44161000Pipelines45231300Construction work for water and sewage pipelines

Similar active competitions

  • Water Services Corporation

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    WSC/T/074/2026 - WORKS – CONSOLIDATION OF SEWER AND POTABLE WATER NETWORKS IN ENVIRONMENTALLY FRIENDLY MANNER IN XATT TA’ SAN ĠORĠ AREA – BIRŻEBBUĠA BY THE WATER SERVICES CORPORATION

    Water Services Corporation needs environmentally friendly sewer and potable-water network works in the Xatt ta’ San Ġorġ area of Birżebbuġa, Malta, with a maximum total contract value of €3,079,070. The works include replacing 200 mm, 250 mm and 500 mm gravity wastewater mains and associated manholes to increase capacity and prevent further seawater infiltration, installing 150 mm dual rising mains, and laying potable-water mains ranging from 100 mm to 300 mm, as specified in the tender drawings.

    Competition
    25. nov. 2026(2 days)
    €3,079,070
  • Water Services Corporation

    Kjemikalier og vannbehandling

    WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

    Water Services Corporation needs the design, construction, testing and commissioning of an environmentally friendly upgrade to the Gozo Wastewater Treatment Plant, with a maximum total contract value of €25,795,000. The works will provide process and hydraulic resilience and ensure effective treatment of wastewater through at least 2040, upgrading capacity to treat an average of 14,000 cubic metres per day. The contract also includes designing, installing, testing and commissioning a new water reclamation plant to produce an additional 4,000 cubic metres of “New Water” per day. The project will be delivered in two phases under FIDIC conditions in Malta.

    Competition
    26. feb. 2027(95 days)
    €25,795,000
  • Enemalta plc

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    TD/T/3982/2026 (17314) TRENCHING WORKS AND LAYING OF 33KV CABLES BETWEEN 132KV DC AND XEWKIJA DC, QALA DC AND NEW KERCEM AREA DC IN AN ENVIRONMENTALLY FRIENDLY MANNER

    Enemalta plc requires environmentally friendly trenching and the installation of 33 kV cables between the 132 kV Distribution Centre and Xewkija Distribution Centre, Qala Distribution Centre and the new Kercem area Distribution Centre in Malta. The works have a maximum total value of €7,059,058.01 and a duration of 21 weeks.

    Competition
    9. des. 2026(16 days)
    €7,059,058