Find

  • All tenders

Search results

All tenders
  • MUNICIPAL WATER DRAINAGE & DISTRICT HEATING COMPANY OF KOZANI

    TRANSMISSION & INTERCONNECTION PIPELINES OF THE DISTRICT HEATING FACILITY OF KOZANI WITH THE DISTRICT HEATING NETWORK JOINT OF WESTERN MACEDONIA

    The MUNICIPAL WATER DRAINAGE & DISTRICT HEATING COMPANY OF KOZANI in Greece has entered into an agreement with ERGOTEM for the installation of a pipeline system to connect the Kozani district heating facility with the District Heating Network Joint of Western Macedonia. This project involves the construction of underground steel factory-insulated superheated water transport pipes, including DN700mm/Φ900mm, DN600mm/Φ800mm, and DN450mm/Φ630mm pipelines, and a sewage plant, to ensure the district heating energy needs in Western Macedonia. The contract has a duration of 22 months and a final value of 22,680,000 €. The pipelines must adhere to European standards EN 13941:2019 and EN 253:2019, with a nominal supply temperature of 120°C and a return temperature between 50°C-70°C. A leak detection system is also required.

    ResultMar 26, 2026
    Mar 25, 2026(Expired)
  • MUNICIPAL WATER DRAINAGE & DISTRICT HEATING COMPANY OF KOZANI

    TRANSMISSION & INTERCONNECTION PIPELINES OF THE DISTRICT HEATING FACILITY OF KOZANI WITH THE DISTRICT HEATING NETWORK JOINT OF WESTERN MACEDONIA - Reference number: TU 0464/2023

    With this project, the Kozani district heating facility is functionally connected to the Kozani-Ptolemaida-Amyntaios Single Interconnected district heating system to ensure the coverage of the district heating energy needs in Western Macedonia both during the transitional stage and after the withdrawal of the existing lignite units of the region in the implementation of the National Plan for Energy and Climate. The project includes the construction of a system of underground steel factory-insulated superheated water transport pipes following the European standard EN 13941:2019 (District heating pipes - Design and installation of thermal insulated bonded single and twin pipe systems for directly buried hot water networks) from the facilities production and the transfer pumping station within the Kardia NPP/PPC to the central transfer & distribution pumping stations of the Kozani District Heating facility in the Kasla area of ​​the city of Kozani. The nominal thermal power transmission capacity is predicted to rise to 195MWth, taking into account the current peak of the Kozani district heating system, as well as the thermal demand due to the future expansions of the system in Kozani and neighboring settlements. Briefly included: (a) New superheated water transfer pipe with a nominal diameter of DN700mm/Φ900mm consisting of a supply pipe and a return pipe (double pipe). The trench length of the new DN700mm pipeline amounts to ~ 8.32kmand starts from the interconnection facilities at the Kardias NPP up to the interconnection to the existing transmission system of the Kozani district heating within a bathhouse included in the present project, in a N-NW position of the settlement of Drepanos. (b) New transmission pipeline of nominal diameter DN600mm/Φ800mm consisting of supply pipeline (single pipeline). The trench length of the new DN600mm pipeline amounts to approximately 7.85 km, connecting the new bathhouse with the main district heating facilities in the KASLAS area of ​​the city of Kozani. (c) Two new sections of new transmission pipelines of nominal diameter DN4500mm/Φ6300mm consisting of supply and return pipeline (double pipeline). The trench length of the two DN450mm sections amounts to approximately 1.02 km, construction of which is necessary to interconnect the new ones with the existing pipelines. (d) Cin order to ensure the functionality of the project, the construction of a sewage plant is planned, which will be located within the farm of Drepanou Kozani, on an area that is already owned by D.E.Y.A. Kozani. With the above design of the transmission system, the supply of the district heating system with thermal energy will now be done from the facilities in the AIS Kardia area. With the intervention of the bath station in the Drepanou area and as long as the AIS Agios Dimitrios facilities are still in operation, it will be possible to supply the district heating of Kozani from the AIS Agios Dimitrios. The pre-insulated transmission pipelines will be steel, pre-insulated according to EN 253:2019 with polyurethane (PUR) insulation and polyethylene (PEH) protective casing, suitable for installation directly in the ground, nominal diameter DN700/Φ900, DN600/Φ800 while for the connections with the existing pipes DN450, DN450 /Φ630. The conveyance will have a nominal supply temperature of 120°C, seasonal variation of this temperature from 900 - 1200, while the return temperature of the water to be reheated will vary between 500-70°C. The technical characteristics of the pipelines of the transmission network will follow the European specifications for underground district heating pipes - EN 253 standard. The transmission pipelines will be installed for almost the entire length underground. The installation and operation of a leak detection system is recommended for insulated transport pipelines. Control channels of each locator (fault locator) with a length of at least 2.5 km are foreseen. For the operation of the locators, it is recommended that they be supplied with electricity from the H.T. network. of the district heating facilities, for the systems that will be installed within the facilities. It is highlighted that the physical and financial object of the tendered works must not change substantially during the execution of the contract, as defined in paragraph 4 of article 132 of Law 4412/2016. The possibility of change exists, only under the conditions of articles 132 and 156 of Law 4412/2016.

    CompetitionMay 27, 2024
    Jun 27, 2024(Expired)
    €42,000,000