Sport Ireland needs civil engineering works for a new pedestrian and cyclist gateway connection to the Sport Ireland Campus via the Tolka Gateway route in Dublin. The project, with a maximum total value of 1,500,000 EUR and a duration of 4 months, includes upgrades to existing pathways, installation of underground utilities, drainage infrastructure, public lighting, CCTV, retaining structures, site access works, and associated civil and electrical engineering works. The works must be undertaken within an operational campus environment and require careful coordination of access, logistics, and stakeholder interfaces.