Limerick City and County Council_103432
Limerick City and County Council Oak Lodge Hostel Fire Safety Remediation Works 2026
Limerick City and County Council needs fire safety remediation works, including the provision of a standalone modular building, at Oak Lodge Hostel, Clare Street, Limerick, with a maximum total value of 600,000 EUR over 4 months. The project aims to address deficiencies identified in fire risk assessments and improve the building's overall fire safety performance. This includes a new L1 Fire Detection and Alarm System, new Emergency Lighting System, replacement of external windows and doors, AOV systems, replacement of internal doors, screens and ironmongery, fire stopping, compartmentation upgrades, fourth-floor ceiling upgrade, attic insulation, associated builders works, decoration, testing, and certification. The standalone modular building will serve as a recreational area.
Multi-Party Framework for Maintenance Repairs and Replacement of heating systems Limerick City and County Council 2026
Limerick City and County Council needs maintenance, repair, and replacement services for existing boilers (gas, oil) and associated equipment on a reactive basis across its Local Authority housing stock. This will be established as a framework agreement with a maximum total value of 5,250,000 EUR over 60 months.
Single Party Framework for the provision of Maintenance of Powered Security Barriers, Electric Gates and Powered Roller Shutters for Limerick City and County Council - 2026
Limerick City and County Council needs services for the maintenance of powered security barriers, electric gates, and powered roller shutters for a 3-year period, with a maximum total value of 319,000 EUR. The works involve servicing, inspection, and testing by a suitably qualified and experienced specialist firm, including a maintenance call-out service and two services every six months.
Multi-Party Framework for Building Contractors (Housing) for Emergency Response Maintenance Works up to the value of €7,500 ex Vat. to Limerick City and County Council Housing Stock.2026
Limerick City and County Council needs building contractors for emergency response maintenance works up to the value of €7,500 ex VAT per job, for their housing stock over 24 months, with a maximum total contract value of 4,000,000 EUR. The work involves modest repairs across all building trades, including roof repair, restoring existing housing stock, bathroom damage repair, replacement of ceilings or suspended floors, blocking up fireplaces, sealing flues, removal of backboilers, footpath repair, ramp installation, chimney repairs/removal, renewal of rainwater goods, and boundary walls. The units will mostly be occupied. All framework participants must be able to adequately discharge the duties of PSCS and Contractor in line with Safety, Health and Welfare at Work (Construction) Regulations 2013 and Health, Safety and Welfare at Work Act 2005.
Mill Road Pedestrian and Cyclist Measures Phase 2 - Limerick. (CORBALLY ROAD SAFE ROUTES TO SCHOOL SCHEME)
Limerick City and County Council has entered into an agreement with Shareridge Ltd for the delivery of pedestrian and cyclist measures, including gully installation/relocation, ramp installation, pedestrian crossing installation, surfacing works, sign installation, and road markings, in the Mid-West region of Ireland. The contract has a duration of 6 months and a total value of 1,199,629 EUR. Five bids were received for this contract.
Tender to appoint a consultant to provide technical consultancy services, to carry out remediation and development activities at the Longpavement Landfill in Limerick City
Limerick City and County Council seek to appoint a consultant to provide technical consultancy services, to carry out remediation and development activities at the Longpavement Landfill in Limerick City through detailed design, statutory procedures, tender and construction. The consultant will be required to undertake the role of Project Supervisor for the Design Process (PDSP) for the duration of the commission. The selected Consulting Engineering firm for this project must possess expertise in various areas, including environmental impact assessment, Natura Impact Screening, waste licensing, as well as the design, construction, and supervision of landfill remediation works and related infrastructure. The brief also include for a masterplan for reuse of the land.
Repair and Maintenance and/or Replacement of Window and Doors for Limerick City and County Council.
The Framework Agreement shall take effect on the Commencement Date. The Framework Agreement will be for a period of 2 years. The Contracting Authority reserves the right to extend the Framework Agreement for a period or periods of up to 1 year with a maximum of two such extension(s) on the same terms and conditions. For the avoidance of doubt, the Contracting Authority confirms that the period of any Contracts awarded under this Framework Agreement may extend beyond the date of expiry of the agreement.