Brigit's Garden CLG needs resurfacing works, including minor leveling of existing hardcore surface and installation of two layers of tar and chip surface coat over approximately 2070m², tying into existing gullies, and installing a 10m x 3m raised walkway in a smooth surface course. The project duration is 1 month, with a maximum total contract value of 60,000 EUR.