Find

  • All tenders

Search results

  • Health Service Executive (HSE)

    Bygningsarbeid og installasjoner

    EST SW: LEVEL 00 FIT-OUT AND PROPOSED CAR PARKING AT MALLOW GENERAL HOSPITAL

    Health Service Executive (HSE) needs construction services for the fit-out of Level 00 at the new ward block at Mallow General Hospital for a New Outpatient Ward (including an Obesity Clinic), covering an area of 1,684m2, and the construction of a new car park at Mallow General Hospital (MGH) in Limerick Road, Kilknockan, Mallow, Cork, P51 N288. The project duration is 10 months.

    Competition with qualificationJan 23, 2026
    Feb 23, 2026(Expired)
    €0
  • Health Service Executive (HSE)

    Miljørådgivning og klimatiltak

    2025 _ HSE _ EST _ Provision of Aspergillus Sampling for North East (Cavan, Louth, Meath and Monaghan)

    Health Service Executive (HSE) needs services for the provision of Aspergillus Sampling for the North East region of Ireland (Cavan, Louth, Meath, and Monaghan) through a framework agreement over 1 year, with a maximum total value of 240,000 EUR. The main CPV category is air quality management.

    Framework agreement with qualificationJan 5, 2026
    Jan 21, 2026(Expired)
    €240,000
  • Health Service Executive (HSE)

    Heisinstallasjon og vedlikehold

    HSE Estates SW: PROPOSED LIFT INSTALLATIONS at BANTRY GENERAL HOSPITAL, CORK for HEALTH SERVICE EXECUTIVE

    Bantry General Hospital (BGH) located in West Cork is part of the HSE South West network of hospitals. BGH provides acute general hospital services to the population of the West Cork area. Bantry General Hospital is a 118- bedded Acute General Hospital and provides within available resources a comprehensive range of inpatient, outpatient and day case services. The proposed works comprises of the complete supply and installation of a new patient bed lift installation at Bantry General Hospital, Bantry, Co. Cork. The lift will be a bespoke 1,600kg bed lift complete within a dedicated lift shaft. The project includes all Civil, Structural and Architectural associated with the construction of the lift shaft. Tendering contractors are to include performing the role as Main Contractor and PSCS and for completing all works detailed and outlined within the full suite of tender documents (Including but not limited to Demolitions / Alterations; Diversion of services; Necessary temporary works; Substructures; Internal Walls; Structural frame; Internal wall completions; Suspended ceilings and ceiling finishes; Walls finishes internally; Floor finishes; Mechanical Installations; Electrical Installations; Lift Installations; Built in fittings; Phasing; Safety and Health; all necessary Coordination and Management).

    CompetitionJul 4, 2025
    Aug 3, 2025(Expired)
    €0
  • Health Service Executive (HSE)

    Bygg og anlegg - Helsevesen, tinghus og demning

    HSE Estates SW: Development and Lease of Kanturk Primary Care Centre

    The Contracting Authority invites submissions in response to the PQQ for the design and delivery of a sustainable primary care centre at the Development Site and the lease of the primary care centre to the HSE. The Procurement Process is being conducted in accordance with the restricted procedure pursuant to EU Directive 2014/24/EU as implemented in Ireland by the Regulations. The Project is being advertised on www.etenders.gov.ie and the Official Journal of the European Union (OJEU).

    Competition with qualificationMay 30, 2025
    Jun 30, 2025(Expired)
    €0
  • Health Service Executive (HSE)

    Miljøovervåking og naturvitenskapelige tjenester

    EST SOUTH: GEOTHERMAL SPECIALIST TO INCLUDE FEASIBILITY DESIGN AND TENDER FOR GEOTHERMAL SURVEYS

    The Health Service Executive (HSE) have recently developed an Infrastructure Decarbonisation Plan and are now in the early design stages of implementing Deep Energy Efficiency upgrade and Decarbonisation measures on a number of HSE campus sites. As part of these projects the HSE wish to explore Geothermal potential of several sites and where feasible we will consider integrating Geothermal solutions as part of the overall energy efficiency measures. Accordingly, we are seeking tender submissions from qualified specialists to provide this Service as described below on a number of sites which will include the following. The tender price will be based on an initial tranche of sites: 1) Cork University Hospital (CUH), Eircode: T12 DC4A 2) St Stephen’s Hospital, Glanmire, Eircode: T45 VK40 3) St Raphael’s Centre, Youghal, Eircode: P36 C596 4) University Hospital Kerry (UHK), Rathass, Tralee, Eircode: V92 NX94 5) St Finbarr’s Hospital, Douglas Road, Cork, Eircode: T12 XH60 The specialist is expected to provide rates for these sites in HSE Estates South that they will also stand over for work in other parts of the country. Other sites currently under consideration are located in Wexford, Cavan and Galway The initial tranche of sites is as follows: 1) Cork University Hospital (CUH) CUH will require a subsequent phase in the future for Deep Retrofit / Decarbonisation studies / capital projects and a geothermal solution may suit this large acute site. The Energy Officer will coordinate the proposed geothermal development with Trauma / Critical Care / Surgery Block development or any future plans to develop i.e. multi-storey carparks etc. Several potential locations for possible geothermal at CUH are shown in Appendix A. 2) St Stephen’s Hospital St Stephen’s Hospital is comprised of four buildings co-located within the 117 acre grounds. Appendix B illustrates a site map where there is land available within the site boundary for potential geothermal development. 3) St Raphael’s Centre St. Raphael’s Centre is situated in Youghal, Co. Cork. Appendix C indicates the extent of land to the West of the campus. 4) University Hospital Kerry (UHK) University Hospital Kerry (UHK) is a large Acute Hospital situated in Tralee, Co. Kerry. UHK provides a comprehensive acute healthcare service to the population of Kerry and surrounding catchment areas totalling circa 180,000 people. 5) St Finbarr’s Hospital St. Finbarr’s Hospital on Douglas Road, Cork, comprises of a multi-unit facility to the South of the City Centre. It also has a residential hospital facility on site which caters for older persons who require a high level of nursing and medical care.

    CompetitionJun 19, 2024
    Jul 12, 2024(Expired)
    €0
  • Health Service Executive (HSE)

    Rådgivende ingeniørtjenester for bygg og anlegg

    Estates South BMS Upgrade Project Kerry 2024

    The project includes a comprehensive upgrade of the existing Building Management System (BMS) systems in the following live HSE buildings in Co. Kerry. • Listowel Community Hospital • Dingle Community Hospital • Tralee Community Nursing Unit (CNU) Killerisk, Tralee • Tralee Personal Social Service (PSS) Administration Building, Rathass • Deer Lodge, Community Nursing Unit Killarney • Kenmare Community Hospital • Cahersiveen Community Hospital

    ResultApr 11, 2024
    Apr 10, 2024(Expired)
  • Health Service Executive (HSE)

    Rådgivende ingeniørtjenester for bygg og anlegg

    Estates South BMS Upgrade Project Kerry 2024

    The project includes a comprehensive upgrade of the existing Building Management System (BMS) systems in the following live HSE buildings in Co. Kerry. • Listowel Community Hospital • Dingle Community Hospital • Tralee Community Nursing Unit (CNU) Killerisk, Tralee • Tralee Personal Social Service (PSS) Administration Building, Rathass • Deer Lodge, Community Nursing Unit Killarney • Kenmare Community Hospital • Cahersiveen Community Hospital

    CompetitionApr 10, 2024
    May 8, 2024(Expired)
    €0
  • Health Service Executive (HSE)

    Prior Information Notice for Assisted Human Reproduction Services Facility, Lee Road Clinic, Cork University Maternity Hospital

    Cork University Maternity Hospital (CUMH) has been chosen as the national launch site for publicly funded and publicly provided complex Assisted Human Reproduction (AHR) services. The new facility will be located off-site, at the Lee Road Clinic, just outside Cork city. The total investment is in the order of €3M. The facility will comprise of a mix of specialist laboratories, procedure rooms and storage areas combined with general administrative and clinical support space: 1. Procedure rooms 2. Andrology Laboratory & semen collection/men’s rooms 3. Grade D Embryology Laboratory 4. Liquid Nitrogen Cryopreservation and storage area 5. Reception and administrative space 6. Patient counselling rooms 7. Patient scanning rooms 8. Patient recovery area (post-procedure) 9. AHR Support labs and storage 10. Welfare Facilities 11. Clean utilities including tri-gases The expected total internal footprint is: “Clean” connected spaces (items 1 - 4) ca 175 m2 AHR Support space (items 5 – 11) ca 200 m2 This facility falls under the umbrella of Tissue Establishments (TEs) and therefore, it is necessary that the selected supplier complies with relevant EUTCD statutory, and EDQM and ESHRE regulatory guidance and comply with the new GMP Annex 1 from design through to installation and commissioning of the purchased equipment and will install it within the spatial constraint of the lab.

    PlanningMar 26, 2024
    Apr 4, 2024(Expired)
  • Health Service Executive (HSE)

    ST. MARY'S HEALTH CAMPUS - PEDESTRIAN CONNECTION TO HOLLYHILL

    This project involves the construction of a new cycle lane and pedestrian walkway from Harbour View Road into Saint Mary's Health Campus located on Bakers Road. The new cycle lane and walkway will run from the north side of Terence McSwiney Community College. The SAQ will be available from the start of this competition with drawings to shortly follow.

    CompetitionMar 8, 2024
    Apr 8, 2024(Expired)
    €0
  • Health Service Executive (HSE)

    Bedriftshelsetjenester

    Multi Party Framework for Health Planning Consultancy February 2024 Multi Party Framework With Initial Call-Off Contract for Health Planning Consultancy Services

    Health Service Executive (“the Client”) is the Contracting Authority and seeks Tenders for the Multi Party Framework with Initial Call-Off Contract for Health Planning Consultancy Services The detailed specifications of requirements are set out in this Document.

    Framework agreementFeb 26, 2024
    Mar 15, 2024(Expired)
    €0
  • Health Service Executive (HSE)

    Bedriftshelsetjenester

    Prior Information Notice for the establishment of Health Planner Services Procurement Framework

    HSE Capital & Estates in the Cork and Kerry region intends to facilitate the establishment of a framework in order to procure the services of a Health Planner to support the progression of clinical services and capital development plans in the region. Initially, the Health Planning Consultant will be required to support a Strategic Assessment Review (SAR) and Preliminary Business Case for a Trauma, Acute, Critical Care (TACC) Tower in Cork University Hospital, and thereafter specific call offs for service developments and capital projects in the region over the life of the framework.

    PlanningFeb 12, 2024
    Feb 28, 2024(Expired)
    €300,000
  • Health Service Executive (HSE)

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    OUTPATIENTS DEPARTMENT at UNIVERSITY TECHNOLOGY CAMPUS, CURAHEEN ROAD, CORK for HEALTH SERVICE EXECUTIVE

    Works comprises of a new Outpatients Department at Building 4, University Technology Campus, Curaheen Road, Cork for Health Service Executive. Works will include refurbishment and fit-out of Building 4, with and including the construction of an extension to the front of the building to facilitate installation of a new lift. Accommodation will includes Consultant rooms, Treatment rooms, Radiography rooms, Plaster rooms, Phlebotomy, Assessment rooms, Admissions bays, Store rooms, Admin rooms, VFac, Clinical Equipment Stores, Clean Utility, Dirty Utility rooms, ICT, Medical Records, Reception, Nurse Base together with associated support and plantroom accommodation. Works will be completed on a live campus, with no disruption to adjoining building users and or services allowable. In order to ensure the continued operation to adjoining campus users a high level of management, safety, dust and infection control procedures will be required on site. It is anticipated that the construction works will take approximately 38 weeks, commencing in Q2, 2024. Contractors will be required to comply with the code of practice for inspecting and certifying buildings and works as defined in SINo.9 of 2014 Building Control (Amendment) Regulations 2014. Under section 3.4, applicants must supply details of works that the applicant has provided that are similar in nature, size, scope, complexity and value to the works required for this project. As a minimum applicants must have Main Contractor and PSCS experience within the following areas: - Main Contract and PSCS experience in construction and delivery of similar healthcare projects. As a minimum applicants are required to have completed at least 2 no ‘Type 3’ healthcare projects of similar nature, size, scope, complexity and value, within a Level 4 Acute Hospital environment. -Main Contract and PSCS experience in construction, delivery and project administration of a similar projects under the Public Works contract for Building Works as Designed by the Employer within a live campus environment. As a minimum applicants are required to have completed at least 1 no ‘Type 3’ projects of similar nature, size, scope, complexity and value. In addition to the above minimum requirements, applicants will achieve higher marks where demonstration of the following is provided; Management of Mechanical and Electrical Sub Contractors; Working outside of Normal working hours; Dust Control and infection prevention and control guidelines for the prevention of aspergillosis during renovation works/construction works; Noise and vibration restrictions; Health and Safety; Security; Patient Confidentiality and Dignity; Installation in accordance with HSE Structured Cabling Standards; Fire Alarm Avoidance of Nuisance activations; Traffic management, Parking, Security and Compound Restrictions; and Waste and Environmental Management. Projects proposed by the applicant to demonstrate the above capabilities, must be complete, with a copy of the defects certificate available upon request. Projects which have not obtained a defects certificate will not be considered as complete.

    Competition with qualificationFeb 6, 2024
    Mar 5, 2024(Expired)
    €0